Loading...
HomeMy WebLinkAbout18172 Goldfinch Way SurveyPlanning DepartmentApprovedDate:__________________04/25/2019 dmorey EOF The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________05/07/2019 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.