HomeMy WebLinkAbout77-05Date 17 January, 1977
Motion by Zaun
CITY OF LAKEVILLE
RESOLUTION
Resolution No. 77-5
Seconded by Emond
SCHEDULE OF FEES
1 r Y
WHEREAS, the 1977 City budget was adopted based on the following
schedule of fees and,
WHEREAS, the cost of service rendered has increased and,
WHEREAS, the fees are to cover the cost of each type of service so
that no other revenue source is required to fund said service and inspection;
NOW THEREFORE BE IT RESOLVED, that the following Schedule of Fees
is hereby approved and adopted, effective January 18, 1977.
SCHEDULE OF FEES
Building permits As per Section 303, Table No. 3-A
Uniform Building Code, 1973 Edition
TABLE NO. 3-A—BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to $500.00
$5.00
$501.00 to $2,000.00
$5.00 for the first $500.00 plus $1.00
for each additional $100.00 or frac-
tion thereof, to and including $2,000.
$2,001.00 to $25,000.00
$20.00 for the first $2,000.00 plus
$4.00 for each additional $1,000.00
or fraction thereof, to and including
$25,000.00
$25,001.00 to $50,000.00
$112.00 for the first $25,000.00 plus
$3.00 for each additional $1,000.00
or fraction thereof, to and including
$50,000.00
$50,001.00 to $100,000.00
$187.00 for the first $50,000.00 plus
$2.00 for each additional $1,000.00
or fraction thereof, to and including
$100,000.00
$100,001.00 to $500,000 00 $287.00 for the first $100,000.00 plus
$1.50 for each additional $1,000.00
or fraction thereof, to and including
$500,000.00
$500,001.00 and up
$887.00 for the first $500,000.00 plus
$1.00 for each additional $1,000.00
I
or fraction thereof
Plan and energy checking fee $10.00 per residential unit
$25.00 Commercial/Industrial
Plumbing permits, including
water softeners $9.50 + 50,,% minimum plus $2.00 per
fixture over 4 per residential unit.
Commercial/Industrial, 17 of plumbing
costs up to $20,000 and 1/27 above $20,000.
Heating $9.50 + 50t; minimum, existing residence
$25.00 new residential unit
Commercial/Industrial, 17 of costs up
to $20,000 and 1/27 above $20,000.
-2 -
Fence
Swimming pool
Moving
Mechanical permits
Septic System
Well
Sewer tap
Water tap
Fire protection equipment permit
Stand pipes and hose cabinets
Sprinklers systems first 10
heads
Each additional 10 heads or
fraction thereof
2' Topography maps
Street/alley excavation
Underground gas, electric or
telephone
Excavating and filling permit
$10.00
Valuation Table #3-A
$50.00, plus cost above $50.00
1% of contract up to $20,000 and
1/2% of 1% over $20,000 with a
minimum of $20.00
$25.00 Residential
$50.00 Commercial/Industrial
$25.00 Residential
$50.00 Commercial/Industrial
$12.50
$12.50
1% of contract, 1/2% of 1% after $10,000
$5.00
$2.00
$6.50 per acre. Minimum charge, $65.00
$15.00
$25.00 minimum
fees
10,000 cubic yards or less, $50.00
10,001 to 250,000 cubic yards
$775 initial fee together with
an annual fee of $375 (including
first year)
250,001 to 500,000 cubic yards
$850 initial fee together with
annual fee of $500 (including
first year)
500,001 or more cubic yards
$1,150 initial fee together with
an annual fee of $750 (including
first year)
Signs - Billboard
$35.00 single
Double faced signs
$70.00
Extra for illuminated
sign $ 5.00
Signs - Business, yearly
$10.00
renewal
$ 5.00 for 2 years
Pool and billiard license
$100.00 Conditional use permit only
Mobile home permit
$35.00 for 2 years
Mobile home inspection
$10.00 per inspection
-3 -
Planning & Zonin
Platting, P.U.D., Site Plans
Rezoning
Variance
Conditional Use Permit
Home Occupation Permit
Special Home Occupation Permit
Special assessment search and
Certifications
Deposit set in accordance with
the size, complexity, diversity,
and location of the proposed
development. Minimum deposit,
$200.00. Minimum fee to be re-
tained by the City, $50.00.
All costs of consultants, staff,
mailing of notices, publications,
to be charged to the project ac-
count. Any cost above $200 is
to be paid upon receipt of itemized
invoice from the City Clerk, and
before the final approval by the
City Council or issuance of a
building permit. Any balance of
deposit is to be returned by the
City within 20 days after approval
by the City Council.
$125 + Consultant costs.
$30.00 + Consultant costs.
$125.00 + Consultant costs.
$50.00 + Consultant costs.
$100.00 + Consultant costs.
$4.00 per parcel
Certification of minutes of
meetings, Resolutions, Ordinances,
etc. $4.00 + 15q, per page
Charge for copies made
15� per page
All other fees previously set and not listed above to remain as set.
ADOPTED this 17th day of January, 1977.
CITY OF LAKEVILLE
&G-tti 9. kko__
Edward J. Mako, yor
ATTEST:
C
Patrick E. McGarvey, City/'Clerk_