HomeMy WebLinkAbout8411 197th Street West-SURVEYZoning = RS-3
ENGINEERING REVIEWED
Date:__________________05/08/2019 corlowsky
*Draintile connection required.
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.