Loading...
HomeMy WebLinkAbout8411 197th Street West-SURVEYZoning = RS-3 ENGINEERING REVIEWED Date:__________________05/08/2019 corlowsky *Draintile connection required. The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.