Loading...
HomeMy WebLinkAbout18095 Greyhaven Path SurveyPlanning DepartmentApprovedDate:__________________05/07/2019 dmorey The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________05/08/2019 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.