HomeMy WebLinkAbout9073 187th SurveyZoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________05/21/2019corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.