Loading...
HomeMy WebLinkAboutItem 4City of Lakeville Public Works Memorandum To: Mayor and City Council Justin Miller, City Administrator From: Neil Normandin, Public Works and Facilities Coordinator Copy: Paul Oehme, Public Works Director Jerilyn Erickson, Finance Director John Hennen, Parks & Recreation Director Date: May 28, 2019 Subject: Capital Improvement Plan and Energy Improvement Proposal PURPOSE Update City Council on the completion and results of a detailed engineering study and energy audit of City facilities completed by Apex Engineering Solutions, SBC and propose changes to the Capital Improvement Plan (CIP) to implement the study recommendations. BACKGROUND The City entered into an agreement with Apex Energy Solutions on September 4, 2018 to conduct a detailed engineering study and technical energy audit of City facilities. The study and energy audit were completed concurrently with a similar study being completed for Lakeville Arenas. Meetings between City staff and representatives of Apex Energy Solutions have produced a series of upgrades at each facility (see attached summary of work) that, if implemented, would provide guaranteed energy and operations and maintenance savings to the City into the future. Gray rows are those projects currently scheduled (in part or in full) over the next 10 years. These upgrades represent projects that would be included as part of the City’s capital building improvements over the next 10 years. Completion of these projects under the Apex agreement would advance $290,000 of projects from the CIP and allow the City to reduce its energy consumption. The projects would be completed in two years rather than the ten years outlined in the CIP. Total cost of these projects is $1.54 million. Staff recommends using 2019 budgeted funds and fund balance to fund the project rather than issuing debt. Approximately $70,000 in rebates/incentives is also anticipated which would reduce the project cost to approximately $1.47 million. Funding for these projects would be as follows: General Fund* $1,044,078 Water Operating Fund 331,818 Liquor Fund 88,734 Building Fund 79,160 Total $1,543,790 *Includes $100k contingency The General Fund ratio is estimated to be 51.11% as of yearend 2018, which is slightly higher (.79%) than the estimate provided to the Council in February 2019. Based on the updated yearend 2018 fund balance and a $705,500 planned use of fund balance in 2019, the projected ratio for yearend 2019 is 47.16%. If fund balance reserves are used to fund the APEX project, the projected ratio for yearend 2019 is 43.64%. The yearend 2019 projections are based on revenues and expenditures at budgeted levels. Historically, those numbers have been conservative and actual revenues and expenditures have resulted in favorable yearend fund balance adjustments. There are two projects included in the project summary that do not generate any utility or operations and maintenance savings. They include the conference room heating at CMF ($10,448) and radiant panels for offices at the police station ($60,885). Staff recommends removing them from this project and considering them separately as part of the CIP development. This would reduce the funding needed by General Fund by $71,333. RECOMMENDATION Bring the agreement and resolution authorizing funding forward to a future City Council meeting for approval. Facility Solutions  Efficiency Solutions  Arena Solutions Work Description Location Cost Guaranteed Utility Savings One Time Operational Savings Annual O&M Savings Potential Incentives Net Cost Simple Payback Building & City Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Arts Center $26,642 $1,630 $0 $344 $1,941 $24,702 12.5 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Arts Center $2,368 $200 $0 $0 $0 $2,368 11.8 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Heritage Center $34,006 $1,700 $0 $358 $1,987 $32,019 15.6 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Heritage Center $1,616 $100 $0 $0 $0 $1,616 16.2 Lighting Upgrade - Replace existing lighting with LED Fixtures technology. Park Buildings and Trails $86,312 $6,070 $0 $1,278 $3,000 $83,312 11.3 IT Solutions - Computer Power Management Software All Buildings $8,759 $3,610 $0 $0 $0 $8,759 2.4 City - Sub Total $159,704 $13,310 $0 $1,980 $6,928 $152,777 10.0 City Hall - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) City Hall - No Council Chambers $164,104 $7,900 $0 $1,664 $8,925 $155,179 16.2 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. City Hall $2,556 $160 $0 $0 $0 $2,556 16.0 Window Film - Install new window film on the exterior windows City Hall $17,051 $1,420 $0 $0 $0 $17,051 12.0 Lighting Upgrade - Council Chambers Lighting Upgrade City Hall - Council Chambers Only $82,055 $220 $0 $47 $1,000 $81,055 Capita l Project s City Hall - Sub Total $265,766 $9,700 $0 $1,711 $9,925 $255,841 22.4 Fire Stations - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 1 $24,857 $1,890 $0 $377 $1,494 $23,363 10.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 1 $11,014 $600 $0 $0 $0 $11,014 18.4 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 2 $11,076 $1,140 $0 $228 $1,054 $10,022 7.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 2 $9,210 $470 $0 $0 $0 $9,210 19.6 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 3 $15,374 $1,490 $0 $300 $1,108 $14,266 8.0 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 3 $6,315 $310 $0 $0 $0 $6,315 20.4 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 4 $21,115 $2,390 $0 $492 $2,022 $19,093 6.6 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 4 $2,970 $250 $0 $0 $0 $2,970 11.9 FS - Sub Total $101,931 $8,540 $0 $1,397 $5,678 $96,253 9.7 Liquor Stores - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Kenrick Liquor Stores $18,930 $1,340 $0 $281 $1,278 $17,652 10.9 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Kenrick Liquor Stores $3,029 $230 $0 $0 $0 $3,029 13.2 Water Savings - Provide new water savings flushing and sinks for low flow systems Kenrick Liquor Stores $1,339 $110 $0 $9 $0 $1,339 11.2 Lighting Upgrade - Replace existing lighting with LED retrofit technology. Galaxie Liquor Stores $59,780 $4,050 $0 $854 $3,267 $56,513 11.5 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Galaxie Liquor Stores $5,657 $290 $0 $0 $0 $5,657 19.5 Liquor - Sub Total $88,734 $6,020 $0 $1,144 $4,545 $84,189 11.8 Police Department - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Police $128,542 $8,000 $0 $1,684 $9,876 $118,666 12.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Police $7,299 $580 $0 $0 $0 $7,299 12.6 Chilled Water Plant Tanks - Expand the system for a larger chilled water ability Police $123,866 $5,200 $0 $0 $0 $123,866 23.8 Radiant Panels for Offices - Add radiant Panels for the offices - Individual Controls Office Area - Police $60,885 $0 $0 $0 $0 $60,885 N/A PD - Sub Total $320,591 $13,780 $0 $1,684 $9,876 $310,715 20.1 Water Treatment Plant - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Water Treatment Plant $73,420 $2,730 $0 $575 $6,492 $66,928 20.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Water Treatment Plant $6,496 $350 $0 $0 $0 $6,496 18.6 Boiler Plant Replacement - Replace one boiler with one new 3MMBTU condensing boiler - & Control Valves Water Treatment Plant $198,118 $9,090 $0 $0 $10,500 $187,618 20.6 Air Compressor Replacement and Leak Detection - Install new air compressors and fix leaks in the system Water Treatment Plant $53,782 $3,590 $0 $0 $0 $53,782 15.0 WTP Improvements - Sub Total $331,818 $15,760 $0 $575 $16,992 $314,826 19.3 Central Maintenance Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Central Maintenance $117,095 $10,220 $0 $2,151 $16,310 $100,785 8.1 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Central Maintenance $47,704 $3,040 $0 $0 $0 $47,704 15.7 Conference Room Heating - Add Finned Tube Radiation Central Maintenance $10,448 $0 $0 $0 $0 $10,448 N/A CMF Improvements - Sub Total $175,247 $13,260 $0 $2,151 $16,310 $158,936 10.3 Other Contingency - Funds for additional scope to be determined later by the owner City Projects $100,000 $0 $0 $0 $0 $100,000 N/A Totals - City Buildings Only $1,543,791 $80,370 $0 $10,642 $70,254 $1,473,536 16.2