HomeMy WebLinkAboutLA168788 18108 Jurel Circle Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode05/07/2019dmathews
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462Guard rail must be runinside screen door alsountil deck is installedon exterior with aseparate permit.
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462UFER GROUNDProvide 20' rebar in footing and stub up nearelectrical service panel for UFER ground.
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).PFHPFHCS-PFCS-PFCS-PFCS-PF
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
1174 SQ FT LL1476 SQ FT ML2650 GT SQ FT120 SP SQ FT578 SQ FT GARAGEPLANS PREPAREDBY RICK S6035 Culligan WayMinnetonka, MN 55345Phone: 952-949-3630Fax: 952-949-3730Builder Lic. BC392462JMS Custom Homes, LLC expresslyreserves its common law copyrightand other property rights in theseplans. These plans are not to bereproduced, changed, or copied inany form or manner whatsoever, norare they to be assigned to a thirdparty without first obtaining the writtenpermission and consent of JMSCustom Homes, LLC. In the event ofunauthorized use of these plans by athird party, the third party shall holdJMS Custom Homes, LLC harmless.ã2019 JMS Custom Homes.MN Builder License #BC392462
JMS Custom Homes, LLC
Project Address: 18108 Jurel Circle - Lakeville
Date: 5/6/19
BWL Spacing (ft.)Wind Speed Calc
(Table R602.10.3(1))
Wind Adj. Factor (Table
R602.10.3(2))
Total BWL
Req.
BWP #BWP Length (in.)BWL Method
A 12 4.10 1.15 4.72
1 40 CS-WSP
2 30 CS-WSP
B 10 3.50 1.15 4.03
1 48 CS-WSP
2 48 CS-WSP
C 28 8.50 1.15 9.78
1 48 CS-WSP
2 48 CS-WSP
3 36 CS-WSP
D 12 2.30 1.30 2.99
1 36 CS-PF
2 30 CS-PF
E 10 2.00 1.30 2.60
1 24 CS-PF
2 16 CS-PF
F 28 4.70 1.30 6.11
1 42 CS-WSP
2 48 CS-WSP
3 27 CS-WSP
G 59 8.85 1.30 11.51
1 48 CS-WSP
2 48 CS-WSP
3 48 CS-WSP
H 23 3.95 1.30 5.14
1 38 PFH
2 38 PFH
I 10 2.00 1.30 2.60
1 48 CS-WSP
2 48 CS-WSP
J 18 3.20 1.30 4.16
1 36 CS-WSP
2 36 CS-WSP
K 39 5.90 1.30 7.67
1 48 CS-WSP
2 48 CS-WSP
**NOTES**
Calculations based on Section R602 of the 2015 Minnesota Residential Code
Detailed references can be found on the last page
Eave to Ridge Height 15'
Braced Wall Panel Calc Sheet
02: Main Level
Member Name Results Current Solution Comments
Screen Porch (V) Dropped Beam Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Screen Porch (H) Dropped Beam Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Dinette Patio Door Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Gathering Room Window Passed 3 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
Owners Suite Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Mudroom Service Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Garage 16' OHD Passed 2 Piece(s) 1 3/4" x 16" 2.0E Microllam® LVL
Foyer Front Door Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Flex Room Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
03: Lower Level
Member Name Results Current Solution Comments
Media Room Side Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Media Room Patio Door Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Game Room Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bedroom # 2 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bedroom # 3 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Mechanical Room Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Stairs Flush Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Hall Flush Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
18108 Jurel Circle, Lakeville, MN.4te
JOB SUMMARY REPORT
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 1 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"855 527 1382 None
2 - Trimmer - SPF 5.50"5.50"1.50"891 549 1440 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1383 @ 1 1/2"7613 (3.00")Passed (18%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1096 @ 1' 1/2"7902 Passed (14%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)3300 @ 5' 1/4"11985 Passed (28%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.062 @ 5' 1/4"0.326 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.162 @ 5' 1/4"0.490 Passed (L/727)--1.0 D + 1.0 S (All Spans)
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
Member Pitch: 0/12
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 10' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 10' 3" o/c unless detailed otherwise.
Main Level, Screen Porch (V) Dropped BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 10' 3"N/A 10.4
1 - Uniform (PSF)0 to 10' 3" (Front)3'20.0 35.0 Snow - Main
2 - Uniform (PSF)0 to 10' 3" (Front)1'100.0 -Wall - Gable
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 2 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 5.50"5.50"1.50"937 1526 2463 None
2 - Trimmer - SPF 3.00"3.00"1.50"905 1475 2380 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2381 @ 12' 1 1/2"7613 (3.00")Passed (31%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1969 @ 1' 3"7902 Passed (25%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)6872 @ 6' 2 3/4"11985 Passed (57%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.294 @ 6' 2 3/4"0.393 Passed (L/481)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.474 @ 6' 2 3/4"0.590 Passed (L/298)--1.0 D + 1.0 S (All Spans)
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
Member Pitch: 0/12
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 12' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 12' 3" o/c unless detailed otherwise.
Main Level, Screen Porch (H) Dropped BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 12' 3"N/A 10.4
1 - Uniform (PSF)0 to 12' 3" (Front)7'20.0 35.0 Snow - Main
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 3 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.17"2024 3484 5508 None
2 - Trimmer - SPF 3.00"3.00"2.17"2024 3484 5508 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)5508 @ 1 1/2"7613 (3.00")Passed (72%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)3743 @ 1' 1/2"7902 Passed (47%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)8275 @ 3' 3"11985 Passed (69%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.118 @ 3' 3"0.208 Passed (L/634)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.187 @ 3' 3"0.313 Passed (L/401)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
Main Level, Dinette Patio DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.4
1 - Uniform (PSF)0 to 6' 6"30' 7 1/2"20.0 35.0 Snow - Main
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 4 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
3 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.87"2659 4457 7116 None
2 - Trimmer - SPF 3.00"3.00"1.62"2310 3847 6157 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)7115 @ 1 1/2"11419 (3.00")Passed (62%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)5353 @ 1' 2 7/8"14817 Passed (36%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)17520 @ 5' 6 3/4"27519 Passed (64%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.247 @ 5' 8 7/16"0.375 Passed (L/546)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.396 @ 5' 8 1/2"0.563 Passed (L/341)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 11' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 11' 6" o/c unless detailed otherwise.
Main Level, Gathering Room WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 11' 6"N/A 19.5
1 - Uniform (PSF)0 to 3' 6"25' 6"20.0 35.0 Snow - Main
2 - Uniform (PSF)3' 6" to 11' 6"18' 6"20.0 35.0 Snow - Main
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 5 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.75"1237 2104 3341 None
2 - Trimmer - SPF 3.00"3.00"1.75"1237 2104 3341 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3341 @ 1 1/2"5738 (3.00")Passed (58%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2292 @ 1' 1/4"4308 Passed (53%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)5020 @ 3' 3"5919 Passed (85%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.054 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.085 @ 3' 3"0.313 Passed (L/883)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Owners Suite WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.6
1 - Uniform (PSF)0 to 6' 6"18' 6"20.0 35.0 Snow - Main
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 6 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.13"995 1721 2716 None
2 - Trimmer - SPF 3.00"3.00"2.13"995 1721 2716 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2716 @ 1 1/2"3825 (3.00")Passed (71%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1052 @ 1' 1/4"2872 Passed (37%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)1936 @ 1' 8"3946 Passed (49%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.008 @ 1' 8"0.103 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.012 @ 1' 8"0.154 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 3' 4" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 4" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Mudroom Service DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 3' 4"N/A 7.0
1 - Uniform (PSF)0 to 3' 4"29' 6"20.0 35.0 Snow - Main
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 7 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 16" 2.0E Microllam® LVL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.78"2649 4397 7046 None
2 - Trimmer - SPF 3.00"3.00"2.78"2649 4397 7046 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)7046 @ 1 1/2"7613 (3.00")Passed (93%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)5714 @ 1' 7"12236 Passed (47%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)28632 @ 8' 4 1/2"35781 Passed (80%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.403 @ 8' 4 1/2"0.550 Passed (L/491)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.646 @ 8' 4 1/2"0.825 Passed (L/306)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 16' 9" o/c unless detailed otherwise.
Main Level, Garage 16' OHDMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 16' 9"N/A 16.3
1 - Uniform (PSF)0 to 16' 9"15'20.0 35.0 Snow - Garage
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 8 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"1283 2203 3486 None
2 - Trimmer - SPF 1.50"1.50"1.50"1283 2203 3486 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3486 @ 0 3806 (1.50")Passed (92%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2141 @ 11"7902 Passed (27%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)4140 @ 2' 4 1/2"11985 Passed (35%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.039 @ 2' 4 1/2"0.158 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.062 @ 2' 4 1/2"0.237 Passed (L/921)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 4' 9" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 9" o/c unless detailed otherwise.
Main Level, Foyer Front DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 4' 9"N/A 10.4
1 - Uniform (PSF)0 to 4' 9"25' 6"20.0 35.0 Snow - Main
2 - Uniform (PSF)0 to 4' 9"1'20.0 35.0 Snow - Porch
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 9 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.93"1367 2332 3699 None
2 - Trimmer - SPF 3.00"3.00"1.93"1367 2332 3699 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3699 @ 1 1/2"5738 (3.00")Passed (64%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2537 @ 1' 1/4"4308 Passed (59%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)5557 @ 3' 3"5919 Passed (94%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.059 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.094 @ 3' 3"0.313 Passed (L/798)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Flex Room WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.6
1 - Uniform (PSF)0 to 6' 6"19' 6"20.0 35.0 Snow - Main
2 - Uniform (PSF)0 to 6' 6"1'20.0 35.0 Snow - Porch
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 10 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.95"1192 1293 289 2774 None
2 - Trimmer - SPF 3.00"3.00"1.95"1192 1293 289 2774 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2484 @ 1 1/2"3825 (3.00")Passed (65%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)1562 @ 1' 1/4"2498 Passed (63%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)3112 @ 2' 9"3431 Passed (91%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.029 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.056 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Media Room Side WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"11' 9"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 5' 6"3'20.0 -35.0 Snow - Main
4 - Uniform (PSF)0 to 5' 6"1'100.0 --Wall - Gable
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 11 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.38"2562 780 3484 6826 None
2 - Trimmer - SPF 3.00"3.00"2.38"2562 780 3484 6826 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)6046 @ 1 1/2"7613 (3.00")Passed (79%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)895 @ 1' 1/2"6872 Passed (13%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1979 @ 3' 3"10422 Passed (19%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.026 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.045 @ 3' 3"0.313 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
Lower Level, Media Room Patio DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.4
1 - Uniform (PSF)0 to 6' 6"1'15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 6' 6"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 6' 6"5'10.0 40.0 -Floor - Deck
4 - Point (lb)0 N/A 2024 -3484
Linked from: Dinette
Patio Door, Support
1
5 - Point (lb)6' 6"N/A 2024 -3484
Linked from: Dinette
Patio Door, Support
2
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 12 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"308 110 418 None
2 - Trimmer - SPF 3.00"3.00"1.50"308 110 418 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)418 @ 1 1/2"3825 (3.00")Passed (11%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)263 @ 1' 1/4"2498 Passed (11%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)524 @ 2' 9"3431 Passed (15%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.002 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.009 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Game Room WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"1'15.0 40.0 Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'90.0 -Wall - Main Level
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 13 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 4.50"4.50"3.25"1733 115 2416 4264 None
2 - Trimmer - SPF 3.00"3.00"1.50"505 110 335 950 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)4149 @ 3"5738 (4.50")Passed (72%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2371 @ 1' 1 3/4"2872 Passed (83%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)2582 @ 1'3946 Passed (65%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.019 @ 2' 6"0.175 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.037 @ 2' 7 1/16"0.262 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 8" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 8" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 2 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 7 1/2"N/A 7.0
1 - Uniform (PSF)0 to 5' 7 1/2"1'15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 7 1/2"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 1'18' 6"20.0 -35.0 Snow - Main
4 - Point (lb)1'N/A 1237 -2104
Linked from: Owners
Suite Window,
Support 1
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 14 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.86"1161 1210 289 2660 None
2 - Trimmer - SPF 3.00"3.00"1.86"1161 1210 289 2660 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2371 @ 1 1/2"3825 (3.00")Passed (62%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)1491 @ 1' 1/4"2498 Passed (60%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)2970 @ 2' 9"3431 Passed (87%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.027 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.053 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 3 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"11'15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 5' 6"3'20.0 -35.0 Snow - Main
4 - Uniform (PSF)0 to 5' 6"1'100.0 --Wall - Gable
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 15 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.81"637 1667 2304 None
2 - Trimmer - SPF 3.00"3.00"1.81"637 1667 2304 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2303 @ 1 1/2"3825 (3.00")Passed (60%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)893 @ 1' 1/4"2498 Passed (36%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1642 @ 1' 8"3431 Passed (48%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.007 @ 1' 8"0.103 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.010 @ 1' 8"0.154 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 3' 4" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 4" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Mechanical Room DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 3' 4"N/A 7.0
1 - Uniform (PSF)0 to 3' 4"25'15.0 40.0 Floor - Main Level
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 16 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Stud wall - SPF 3.50"3.50"1.50"376 965 1341 Blocking
2 - Stud wall - SPF 3.50"3.50"1.50"376 965 1341 Blocking
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1341 @ 2"4463 (3.50")Passed (30%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)632 @ 1' 3/4"2498 Passed (25%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1134 @ 2' 1/8"3431 Passed (33%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.007 @ 2' 1/8"0.092 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.010 @ 2' 1/8"0.184 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Floor
Member Type : Flush Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/480) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 4' o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Stairs Flush BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 4' 1/4"N/A 7.0
1 - Uniform (PSF)0 to 4' 1/4" (Front)9'15.0 40.0 Floor - Main Level
2 - Uniform (PSF)0 to 4' 1/4" (Front)3'15.0 40.0 Floor - Stairs
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 17 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.85"652 1700 2352 None
2 - Trimmer - SPF 3.00"3.00"1.85"652 1700 2352 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2352 @ 1 1/2"3825 (3.00")Passed (62%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)1222 @ 1' 1/4"2498 Passed (49%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)2214 @ 2' 1 1/2"3431 Passed (65%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.017 @ 2' 1 1/2"0.100 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.023 @ 2' 1 1/2"0.200 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Floor
Member Type : Flush Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/480) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 4' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 4' 3" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Hall Flush BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by JMS, Plan Date; 4/8/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 4' 3"N/A 7.0
1 - Uniform (PSF)0 to 4' 3" (Front)20'15.0 40.0 Floor - Main Level
Forte v5.4, Design Engine: V7.1.1.3
4/22/2019 11:19:06 AM
Page 18 of 18
18108 Jurel Circle, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
JMS Custom Homes
Boerboon Residence - Arronson Elev A
18108 Jurel Circle, Lakeville, MN
4/22/2019 Job # 23456
(19)T16
(2)T7
(3)T21 (7)T22
(5)T23
T25T24T8T12(2)T9
(3)T5T6
T2
T1
T3
T4
T10
PAGE NO:
1 OF 1
JOB NO:
T92087 Name: ARONSON ACustomer: Lyman Lumber/Chan Address: 18108 JULY CIRCLESalesman: LLCDesigner: DJW
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 13.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.002C 999 180
HORZ(LL):-0.001H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T16
Ply: 1
Qty:19
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/37 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 16 -40
B - C 55 -147
Chords Tens.Comp.
C - D 66 -147
D - E 41 -54
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -2
H - G 43 -11
Chords Tens.Comp.
G - F 43 -11
F - E 80 -13
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 128 -390
C - G 22 -264
Webs Tens.Comp.
F - D 128 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4 2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 13.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.002C 999 180
HORZ(LL):-0.001H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T16
Ply: 1
Qty:19
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/37 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 16 -40
B - C 55 -147
Chords Tens.Comp.
C - D 66 -147
D - E 41 -54
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -2
H - G 43 -11
Chords Tens.Comp.
G - F 43 -11
F - E 80 -13
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 128 -390
C - G 22 -264
Webs Tens.Comp.
F - D 128 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4 2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4
Lumber
Top chord 2x4 DF-L 2400f-2.0E :TC3 2x6 SPF 1650f-1.5E:
:TC5 2x4 DF-L 1800f-1.6E::TC6 2x4 SPF #1/#2:Bot chord 2x4 SPF #1/#2 :BC3 2x6 DF-L 2400f-2.0E:Webs 2x3 SPF #3 :w2, w9, w10 2x3 SPF #1/#2::w4 2x4 DF-L 2400f-2.0E:
:w8, w11, w12, w14, w15, w16, w17 2x4 SPF #1/#2::w13 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 5X8 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Bearing Block(s)
Brg blocks:0.131"x3", min. nailsbrg x-loc #blocks length/blk #nails/blk wall plate
2 32.542' 1 12" 4 SPF StandardBrg block to be same size and species as chord.Refer to drawing CNNAILSP1014 for more information.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h to 2hC&C Dist a: 5.90 ftLoc. from endwall: not in 13.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.168E 999 240
VERT(TL): 0.371E 999 180
HORZ(LL): 0.114R - -
HORZ(TL): 0.263R - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.827
Max BC CSI: 0.831
Max Web CSI: 0.944
Mfg Specified Camber:
Job Number: T92087 Truss Label:T21
Ply: 1
Qty:3
Wgt: 416.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1629 /-/-/702 /-/271
AA4679 /-/-/1902/-/-
M 1008 /-/-/494 /30 /-
Wind reactions based on MWFRS
Z Brg Width = 5.5 Min Req =2.6
AABrg Width = 5.5 Min Req =-
M Brg Width = 5.5 Min Req =1.6
Bearings Z, AA, & M Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 154-3393
C - D 7-2516
D - E 246-1684
E - F 242-1646
F - G 660 -294
G - H 1799 0
Chords Tens.Comp.
H - I 1925 0
I - J 2204 -43
J - K 884 -38
K - L 221 -1104
L - M 175 -1595
M - N 43 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
Z - Y 175 -22
X - W 3146 -389
W - U 2146 -205
V - T 57 -9
T - R 634-3821
Chords Tens.Comp.
S - Q 243 0
Q - P 657 -377
P - O 657 -377
O - M 1431 -108
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Z 106-1525
B - X 2988 -112
Z - X 229 -304
Webs Tens.Comp.
F - T 64 -1409
T - G 1331 -33
G - R 0 -2223
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
TC5
TC6
BC3
w2w4
w8
w9
w10
w11
w12
w13
w14
w15
w16
w17
BL1
(a)
(a)
(a)
(a)
(a)
(a)
(a)(a)
(a)
(a)
(a)
DT -1"12
9'1"28'7"2
A B
C
D
E
F G H I
J
K
L
M N
OPQRSTUVWXYZAA
6 12
412
4X4(R)
SS0514
2X4
3X4
3X4
1.5X4
6X8
3X6
SS0712(**)
6X8
5X6(R)SS0712(**)
SS1017
2X4
1.5X4
SS0712
4X8 4X8 3X4
1.5X4
3X6(B1)
32'9"4 26'2"12
2'5"
2'5"
8'6"13
6'1"13 14'8"12
6'1"15
20'4"8
5'7"12
26'4"8
6'
32'4"8
6'
33'2"4
9"12
40'3"1
7'0"13
47'6"
7'2"15
53'1"3
5'7"3
59'
5'10"13
2'5"
2'5"
8'4"12
5'11"12 14'7"
6'2"4
23'11"10
9'4"10
33'0"8
9'0"14
41'8"7
8'7"15
45'0"8
3'4"1
50'1"13
5'1"5 59'
8'10"31'6"1'6"
6"
1'2"8 4'4"1'6"11'10"1212'2"7Lumber
Top chord 2x4 DF-L 2400f-2.0E :TC3 2x6 SPF 1650f-1.5E:
:TC5 2x4 DF-L 1800f-1.6E::TC6 2x4 SPF #1/#2:Bot chord 2x4 SPF #1/#2 :BC3 2x6 DF-L 2400f-2.0E:Webs 2x3 SPF #3 :w2, w9, w10 2x3 SPF #1/#2::w4 2x4 DF-L 2400f-2.0E:
:w8, w11, w12, w14, w15, w16, w17 2x4 SPF #1/#2::w13 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 5X8 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Bearing Block(s)
Brg blocks:0.131"x3", min. nailsbrg x-loc #blocks length/blk #nails/blk wall plate
2 32.542' 1 12" 4 SPF StandardBrg block to be same size and species as chord.Refer to drawing CNNAILSP1014 for more information.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h to 2hC&C Dist a: 5.90 ftLoc. from endwall: not in 13.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.168E 999 240
VERT(TL): 0.371E 999 180
HORZ(LL): 0.114R - -
HORZ(TL): 0.263R - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.827
Max BC CSI: 0.831
Max Web CSI: 0.944
Mfg Specified Camber:
Job Number: T92087 Truss Label:T21
Ply: 1
Qty:3
Wgt: 416.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1629 /-/-/702 /-/271
AA4679 /-/-/1902/-/-
M 1008 /-/-/494 /30 /-
Wind reactions based on MWFRS
Z Brg Width = 5.5 Min Req =2.6
AABrg Width = 5.5 Min Req =-
M Brg Width = 5.5 Min Req =1.6
Bearings Z, AA, & M Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 154-3393
C - D 7-2516
D - E 246-1684
E - F 242-1646
F - G 660 -294
G - H 1799 0
Chords Tens.Comp.
H - I 1925 0
I - J 2204 -43
J - K 884 -38
K - L 221 -1104
L - M 175 -1595
M - N 43 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
Z - Y 175 -22
X - W 3146 -389
W - U 2146 -205
V - T 57 -9
T - R 634-3821
Chords Tens.Comp.
S - Q 243 0
Q - P 657 -377
P - O 657 -377
O - M 1431 -108
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Z 106-1525
B - X 2988 -112
Z - X 229 -304
Webs Tens.Comp.
F - T 64 -1409
T - G 1331 -33
G - R 0 -2223
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
TC5
TC6
BC3
w2w4
w8
w9
w10
w11
w12
w13
w14
w15
w16
w17
BL1
(a)
(a)
(a)
(a)
(a)
(a)
(a)(a)
(a)
(a)
(a)
DT -1"12
9'1"28'7"2
A B
C
D
E
F G H I
J
K
L
M N
OPQRSTUVWXYZAA
6 12
412
4X4(R)
SS0514
2X4
3X4
3X4
1.5X4
6X8
3X6
SS0712(**)
6X8
5X6(R)SS0712(**)
SS1017
2X4
1.5X4
SS0712
4X8 4X8 3X4
1.5X4
3X6(B1)
32'9"4 26'2"12
2'5"
2'5"
8'6"13
6'1"13 14'8"12
6'1"15
20'4"8
5'7"12
26'4"8
6'
32'4"8
6'
33'2"4
9"12
40'3"1
7'0"13
47'6"
7'2"15
53'1"3
5'7"3
59'
5'10"13
2'5"
2'5"
8'4"12
5'11"12 14'7"
6'2"4
23'11"10
9'4"10
33'0"8
9'0"14
41'8"7
8'7"15
45'0"8
3'4"1
50'1"13
5'1"5 59'
8'10"31'6"1'6"
6"
1'2"8 4'4"1'6"11'10"1212'2"7
Lumber
Top chord 2x4 SPF #1/#2 :TC3 2x6 SPF 1650f-1.5E::TC4 2x4 DF-L 2400f-2.0E:
:TC5 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2 :BC2 2x6 DF-L 2400f-2.0E:Webs 2x3 SPF #3 :w2, w6, w7, w8, w11, w13 2x4 SPF #1/#2::w4, w10, w12 2x3 SPF #1/#2:
:w9 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Bearing Block(s)
Brg blocks:0.131"x3", min. nailsbrg x-loc #blocks length/blk #nails/blk wall plate
2 32.542' 1 12" 4 SPF StandardBrg block to be same size and species as chord.Refer to drawing CNNAILSP1014 for more information.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 5.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.128D 999 240
VERT(TL): 0.274D 999 180
HORZ(LL): 0.050C - -
HORZ(TL): 0.106C - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.844
Max BC CSI: 0.683
Max Web CSI: 0.824
Mfg Specified Camber:
Job Number: T92087 Truss Label:T22
Ply: 1
Qty:7
Wgt: 387.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1743 /-/-/764 /-/270
Y 4414 /-/-/1845/-/-
L 1065 /-/-/526 /38 /-
Wind reactions based on MWFRS
X Brg Width = 5.5 Min Req =2.7
Y Brg Width = 5.5 Min Req =-
L Brg Width = 5.5 Min Req =1.7
Bearings X, Y, & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 188 -173
C - D 215-2237
D - E 207-1484
E - F 607 -483
F - G 1424 -110
Chords Tens.Comp.
G - H 1502 -90
H - I 1769 -220
I - J 474 -34
J - K 330 -1268
K - L 417 -1753
L - M 43 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
X - W 1997 -176
W - V 1521 -172
V - U 1521 -172
U - T 867 -324
T - S 867 -323
Chords Tens.Comp.
S - Q 1268 -2351
R - P 277 0
P - O 819 -101
O - N 819 -101
N - L 1580 -318
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 293 -435
X - C 9-2311
C - W 272 -410
W - D 680 -214
Webs Tens.Comp.
G - Q 0 -638
Q - R 91 0
Q - H 222 -769
Q - I 472 -1412
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
TC4
TC5
BC2
w2
w4
w6
w7
w8
w9
w10
w11
w12
w13
BL1
(a)
(a)
(a)
(a)
(a)
(a)(a)
(a)
(a)
(a)
DT -1"12
9'1"28'7"2
A B
C
D
E F G H
I
J
K
L M
NOPQRSTUVWXY
6 12
412
5X6
6X8
4X4 4X8
4X4
4X4(R)
SS0712
5X8
4X6(R)
4X6(R)SS0712(**)
8X14
2X4
SS0712
4X8 4X8
5X8
3X4
3X6(B1)
32'9"4 26'2"12
6'9"4
6'9"4
13'7"
6'9"12
20'4"8
6'9"8
26'4"8
6'
32'4"8
6'
33'2"4
9"12
40'3"1
7'0"13
47'6"
7'2"15
53'1"3
5'7"3
59'
5'10"13
8'3"2
8'3"2
12'
3'8"14
16'6"4
4'6"4 24'
7'5"12
24'9"6
9"6
33'0"8
8'3"2
41'8"7
8'7"15
45'0"8
3'4"1
50'1"13
5'1"5 59'
8'10"31'6"1'6"
6"
1'2"8 4'4"11'10"1212'2"7Lumber
Top chord 2x4 SPF #1/#2 :TC3 2x6 SPF 1650f-1.5E::TC4 2x4 DF-L 2400f-2.0E:
:TC5 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2 :BC2 2x6 DF-L 2400f-2.0E:Webs 2x3 SPF #3 :w2, w6, w7, w8, w11, w13 2x4 SPF #1/#2::w4, w10, w12 2x3 SPF #1/#2:
:w9 2x4 SPF 1650f-1.5E:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Bearing Block(s)
Brg blocks:0.131"x3", min. nailsbrg x-loc #blocks length/blk #nails/blk wall plate
2 32.542' 1 12" 4 SPF StandardBrg block to be same size and species as chord.Refer to drawing CNNAILSP1014 for more information.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 5.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.128D 999 240
VERT(TL): 0.274D 999 180
HORZ(LL): 0.050C - -
HORZ(TL): 0.106C - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.844
Max BC CSI: 0.683
Max Web CSI: 0.824
Mfg Specified Camber:
Job Number: T92087 Truss Label:T22
Ply: 1
Qty:7
Wgt: 387.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1743 /-/-/764 /-/270
Y 4414 /-/-/1845/-/-
L 1065 /-/-/526 /38 /-
Wind reactions based on MWFRS
X Brg Width = 5.5 Min Req =2.7
Y Brg Width = 5.5 Min Req =-
L Brg Width = 5.5 Min Req =1.7
Bearings X, Y, & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 188 -173
C - D 215-2237
D - E 207-1484
E - F 607 -483
F - G 1424 -110
Chords Tens.Comp.
G - H 1502 -90
H - I 1769 -220
I - J 474 -34
J - K 330 -1268
K - L 417 -1753
L - M 43 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
X - W 1997 -176
W - V 1521 -172
V - U 1521 -172
U - T 867 -324
T - S 867 -323
Chords Tens.Comp.
S - Q 1268 -2351
R - P 277 0
P - O 819 -101
O - N 819 -101
N - L 1580 -318
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 293 -435
X - C 9-2311
C - W 272 -410
W - D 680 -214
Webs Tens.Comp.
G - Q 0 -638
Q - R 91 0
Q - H 222 -769
Q - I 472 -1412
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
TC4
TC5
BC2
w2
w4
w6
w7
w8
w9
w10
w11
w12
w13
BL1
(a)
(a)
(a)
(a)
(a)
(a)(a)
(a)
(a)
(a)
DT -1"12
9'1"28'7"2
A B
C
D
E F G H
I
J
K
L M
NOPQRSTUVWXY
6 12
412
5X6
6X8
4X4 4X8
4X4
4X4(R)
SS0712
5X8
4X6(R)
4X6(R)SS0712(**)
8X14
2X4
SS0712
4X8 4X8
5X8
3X4
3X6(B1)
32'9"4 26'2"12
6'9"4
6'9"4
13'7"
6'9"12
20'4"8
6'9"8
26'4"8
6'
32'4"8
6'
33'2"4
9"12
40'3"1
7'0"13
47'6"
7'2"15
53'1"3
5'7"3
59'
5'10"13
8'3"2
8'3"2
12'
3'8"14
16'6"4
4'6"4 24'
7'5"12
24'9"6
9"6
33'0"8
8'3"2
41'8"7
8'7"15
45'0"8
3'4"1
50'1"13
5'1"5 59'
8'10"31'6"1'6"
6"
1'2"8 4'4"11'10"1212'2"7
Lumber
Top chord 2x4 SPF #1/#2 :TC2 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #1/#2 :w1, w3, w12 2x3 SPF #3::w2, w4, w7, w13, w14 2x4 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 4.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.112N 999 240
VERT(TL): 0.230N 999 180
HORZ(LL): 0.056K - -
HORZ(TL): 0.120K - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.913
Max BC CSI: 0.838
Max Web CSI: 0.830
Mfg Specified Camber:
Job Number: T92087 Truss Label:T23
Ply: 1
Qty:5
Wgt: 298.9 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 3657 /-/-/1620/-/221
K 2111 /-/-/911 /-/-
Wind reactions based on MWFRS
R Brg Width = 5.5 Min Req =5.4
K Brg Width = 5.5 Min Req =3.3
Bearings R & K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 175 -160
C - D 1500 -357
D - E 80-1580
E - F 110-1288
Chords Tens.Comp.
F - G 127 -1804
G - H 105 -2020
H - I 206 -2370
I - J 103 -133
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
S - R 398 -770
R - Q 590 -548
Q - P 590 -548
P - O 1756 0
Chords Tens.Comp.
O - N 1756 0
N - M 2021 0
M - L 2021 0
L - K 1817 -89
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 281 -427
S - C 953 -472
C - R 283 -715
R - D 320-3134D - P 1491 -8
P - E 141 -116
P - F 0-1039
Webs Tens.Comp.
F - N 304 -120
N - G 341 -8
N - H 246 -471
H - L 143 -94L - I 340 0
I - K 118 -2531
J - K 145 -231
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
w1
w2
w3
w4
w7
w12
w13
w14
(a)
(a)(a)(a)
(a)(a)
(a)
DT -1"12
9'1"2A
B
C
D
E F G
H
I
J
KLMNOPQRS
6 12
1.5X4
4X4
SS0514
5X8(R)4X8
8X8
6X8
6X6
4X8
4X4
3X8
5X6
4X8
3X4
3X4
6X8
1.5X4
5X6
10'39'
6'9"2
6'9"2
13'7"4
6'10"2
20'4"8
6'9"4
26'4"8
6'
32'4"8
6'
37'11"
5'6"8
43'5"12
5'6"12
49'
5'6"4
10'2"12
10'2"12
12'
1'9"4
19'7"3
7'7"3
24'
4'4"13
29'4"13
5'4"13
36'
6'7"3
39'2"6
3'2"6
49'
9'9"101'6"
1'2"8 3'1"11'4"12Lumber
Top chord 2x4 SPF #1/#2 :TC2 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #1/#2 :w1, w3, w12 2x3 SPF #3::w2, w4, w7, w13, w14 2x4 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 4.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.112N 999 240
VERT(TL): 0.230N 999 180
HORZ(LL): 0.056K - -
HORZ(TL): 0.120K - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.913
Max BC CSI: 0.838
Max Web CSI: 0.830
Mfg Specified Camber:
Job Number: T92087 Truss Label:T23
Ply: 1
Qty:5
Wgt: 298.9 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 3657 /-/-/1620/-/221
K 2111 /-/-/911 /-/-
Wind reactions based on MWFRS
R Brg Width = 5.5 Min Req =5.4
K Brg Width = 5.5 Min Req =3.3
Bearings R & K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 175 -160
C - D 1500 -357
D - E 80-1580
E - F 110-1288
Chords Tens.Comp.
F - G 127 -1804
G - H 105 -2020
H - I 206 -2370
I - J 103 -133
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
S - R 398 -770
R - Q 590 -548
Q - P 590 -548
P - O 1756 0
Chords Tens.Comp.
O - N 1756 0
N - M 2021 0
M - L 2021 0
L - K 1817 -89
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 281 -427
S - C 953 -472
C - R 283 -715
R - D 320-3134D - P 1491 -8
P - E 141 -116
P - F 0-1039
Webs Tens.Comp.
F - N 304 -120
N - G 341 -8
N - H 246 -471
H - L 143 -94L - I 340 0
I - K 118 -2531
J - K 145 -231
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
w1
w2
w3
w4
w7
w12
w13
w14
(a)
(a)(a)(a)
(a)(a)
(a)
DT -1"12
9'1"2A
B
C
D
E F G
H
I
J
KLMNOPQRS
6 12
1.5X4
4X4
SS0514
5X8(R)4X8
8X8
6X8
6X6
4X8
4X4
3X8
5X6
4X8
3X4
3X4
6X8
1.5X4
5X6
10'39'
6'9"2
6'9"2
13'7"4
6'10"2
20'4"8
6'9"4
26'4"8
6'
32'4"8
6'
37'11"
5'6"8
43'5"12
5'6"12
49'
5'6"4
10'2"12
10'2"12
12'
1'9"4
19'7"3
7'7"3
24'
4'4"13
29'4"13
5'4"13
36'
6'7"3
39'2"6
3'2"6
49'
9'9"101'6"
1'2"8 3'1"11'4"12
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of rigid ceiling use purlins to brace BC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.002C 999 180
HORZ(LL):-0.001H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T24
Ply: 1
Qty:1
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/36 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 15 -40
B - C 84 -147
Chords Tens.Comp.
C - D 103 -147
D - E 39 -56
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -10
H - G 43 -10
Chords Tens.Comp.
G - F 43 -10
F - E 80 -19
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 229 -390
C - G 61 -264
Webs Tens.Comp.
F - D 230 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
4X4
2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of rigid ceiling use purlins to brace BC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.002C 999 180
HORZ(LL):-0.001H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T24
Ply: 1
Qty:1
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/36 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 15 -40
B - C 84 -147
Chords Tens.Comp.
C - D 103 -147
D - E 39 -56
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -10
H - G 43 -10
Chords Tens.Comp.
G - F 43 -10
F - E 80 -19
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 229 -390
C - G 61 -264
Webs Tens.Comp.
F - D 230 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
4X4
2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4
Lumber
Top chord 2x4 SPF #1/#2 :TC2 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3 :w2, w4, w7, w13, w14 2x4 SPF #1/#2::w5, w6, w8, w9, w10, w11, gb20, gb22, gb29, gb34 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 4.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.140Y 999 240
VERT(TL): 0.282Y 999 180
HORZ(LL): 0.062J - -
HORZ(TL): 0.134J - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.817
Max BC CSI: 0.790
Max Web CSI: 0.941
Mfg Specified Camber:
Job Number: T92087 Truss Label:T8
Ply: 1
Qty:1
Wgt: 600.3 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
BP3657 /-/-/1620/-/221
AJ2111 /-/-/911 /-/-
Wind reactions based on MWFRS
BPBrg Width = 5.5 Min Req =5.4
AJBrg Width = 5.5 Min Req =3.3
Bearings BP & AJ Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 190 -148
C - D 1310 -341
D - E 1396 -342
E - F 1391 -322
F - G 1372 -294
G - H 1460 -291
H - I 35-1556
I - J 46-1475
J - K 67-1452
K - L 92-1438
L - M 117-1404
M - N 107-1287
N - O 106-1288
O - P 106-1288
P - Q 106-1288
Q - R 106-1289
Chords Tens.Comp.
R - S 127 -1807
S - T 127 -1807
T - U 127 -1807
U - V 127 -1807
V - W 128 -1807
W - X 122 -1896
X - Y 98 -1937
Y - Z 77 -1964
Z -AA 60 -2005
AA-AB 229 -2248
AB-AC 213 -2248
AC-AD 187 -2260
AD-AE 181 -2341
AE-AF 139 -17
AF-AG 91 -59
AG-AH 53 -67
AH-AI 48 -106
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
BW-BV 408 -752
BV-BU 409 -750
BU-BT 409 -749
BT-BS 409 -749
Chords Tens.Comp.
BC-BB 1756 0
BB-BA 1756 0
BA-AZ 1756 0
AZ-AY 1756 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
w2
w4
w5
w6 w7
w8
w9
w10
w11
w13
w14
gb20
gb22
gb29
gb34
(a)
(a)
(a)(a)(a)
(a)
(a)
(a)(a)
DT -1"12
9'1"2AB
C
D E F G H I J K L M
N O
P QRS T U V W X Y Z AA AB AC AD
AE
AF AG AHAI
AJAKALAMANAOAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBTBUBVBW
BX BY
BZ CA CB
CCCD CE
CFCG
CHCI
CJ
CKCL
CMCN
COCP
CQ
CRCS
CT
CU
CV
CW CXCY
CZ
DA
DB
DC
DD
DE
DF
DG
DH
DI
DJDK
DL
DMDN DO
DP DQDR DSDT
DUDV
DWDX
DY
DZ
EA
EB
ECED
EE
6 12
4X4
SS0514
5X8(R)4X8
8X81.5X4(**)
6X8
5X6
4X8
4X4
3X8
2X42X4
2X42X4
5X6
4X8
8X14(R)
7X16(R)
6X8
5X6
10'39'
1'10"1'4"
(TYP)
13'7"4
13'7"4
20'4"8
6'9"4
26'4"8
6'
32'4"8
6'
43'5"12
11'1"4
49'
5'6"4
10'2"12
10'2"12
19'7"3
9'4"7
29'4"13
9'9"10
39'2"6
9'9"10
49'
9'9"101'6"
1'2"8 3'1"11'4"12Lumber
Top chord 2x4 SPF #1/#2 :TC2 2x4 SPF 1650f-1.5E:Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3 :w2, w4, w7, w13, w14 2x4 SPF #1/#2::w5, w6, w8, w9, w10, w11, gb20, gb22, gb29, gb34 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.52 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 4.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.140Y 999 240
VERT(TL): 0.282Y 999 180
HORZ(LL): 0.062J - -
HORZ(TL): 0.134J - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.817
Max BC CSI: 0.790
Max Web CSI: 0.941
Mfg Specified Camber:
Job Number: T92087 Truss Label:T8
Ply: 1
Qty:1
Wgt: 600.3 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
BP3657 /-/-/1620/-/221
AJ2111 /-/-/911 /-/-
Wind reactions based on MWFRS
BPBrg Width = 5.5 Min Req =5.4
AJBrg Width = 5.5 Min Req =3.3
Bearings BP & AJ Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 190 -148
C - D 1310 -341
D - E 1396 -342
E - F 1391 -322
F - G 1372 -294
G - H 1460 -291
H - I 35-1556
I - J 46-1475
J - K 67-1452
K - L 92-1438
L - M 117-1404
M - N 107-1287
N - O 106-1288
O - P 106-1288
P - Q 106-1288
Q - R 106-1289
Chords Tens.Comp.
R - S 127 -1807
S - T 127 -1807
T - U 127 -1807
U - V 127 -1807
V - W 128 -1807
W - X 122 -1896
X - Y 98 -1937
Y - Z 77 -1964
Z -AA 60 -2005
AA-AB 229 -2248
AB-AC 213 -2248
AC-AD 187 -2260
AD-AE 181 -2341
AE-AF 139 -17
AF-AG 91 -59
AG-AH 53 -67
AH-AI 48 -106
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
BW-BV 408 -752
BV-BU 409 -750
BU-BT 409 -749
BT-BS 409 -749
Chords Tens.Comp.
BC-BB 1756 0
BB-BA 1756 0
BA-AZ 1756 0
AZ-AY 1756 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
w2
w4
w5
w6 w7
w8
w9
w10
w11
w13
w14
gb20
gb22
gb29
gb34
(a)
(a)
(a)(a)(a)
(a)
(a)
(a)(a)
DT -1"12
9'1"2AB
C
D E F G H I J K L M
N O
P QRS T U V W X Y Z AA AB AC AD
AE
AF AG AHAI
AJAKALAMANAOAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBTBUBVBW
BX BY
BZ CA CB
CCCD CE
CFCG
CHCI
CJ
CKCL
CMCN
COCP
CQ
CRCS
CT
CU
CV
CW CXCY
CZ
DA
DB
DC
DD
DE
DF
DG
DH
DI
DJDK
DL
DMDN DO
DP DQDR DSDT
DUDV
DWDX
DY
DZ
EA
EB
ECED
EE
6 12
4X4
SS0514
5X8(R)4X8
8X81.5X4(**)
6X8
5X6
4X8
4X4
3X8
2X42X4
2X42X4
5X6
4X8
8X14(R)
7X16(R)
6X8
5X6
10'39'
1'10"1'4"
(TYP)
13'7"4
13'7"4
20'4"8
6'9"4
26'4"8
6'
32'4"8
6'
43'5"12
11'1"4
49'
5'6"4
10'2"12
10'2"12
19'7"3
9'4"7
29'4"13
9'9"10
39'2"6
9'9"10
49'
9'9"101'6"
1'2"8 3'1"11'4"12
Job Number: T92087 Truss Label:T8
Ply: 1
Qty:1
Wgt: 600.3 lbs
CS-CT 0-1101
CU-CV 8-1055
CW-CX 12-1029
CY-CZ 15-1014
EB-EC 104 -2565
ED-EE 113 -2605
EE-AJ 109 -2570
AI-AJ 87 -194
Maximum Gable Forces Per Ply (lbs)
GablesTens.Comp.
BX-BV 20 0
BY-BU 17 0
BZ-BT 3 -10
CA-BS 44 0
BR-CB 128 0
CC- D 74 -26
BQ-CD 0 -40
CE- E 27 -120CF-BO 41 -154
F -CG 49 -169
CH-BM 103 -8
G -CI 104 -12
BL-CJ 89 -15
CK- I 46 0
BK-CL 35 0
CM- J 33 -73
BJ-CN 27 -37
CO- K 45 -97
BI-CP 60 -126
CQ- L 42 -60
M -CS 238 0
CR-BG 103 -10
CT-BF 8 -40
N -CU 0 -98
CV-BE 5 -44
O -CW 0 -75
CX-BC 4 -42
P -CY 0 -60
CZ-BB 121 0
Q -DA 135 0
Gables Tens.Comp.
DB- S 87 0
BA-DC 82 0
DD- T 0 -107
AZ-DE 0 -97
DF-DG 0 -82
U -DH 0 -138
DI-DK 2 -95
DJ-AX 0 -94V -DL 1 -89
W -DN 259 -24
DM-AW 206 -13
DO-AV 43 -14
X -DP 46 -34
DQ-AU 32 -44
Y -DR 35 -65
DS-AS 32 -41
Z -DT 30 -43
AR-AA 130 -31
AQ-AB 28 -125
DU-AP 33 -74
AC-DV 41 -99
DW-AO 35 -27
AD-DX 48 -5
DY-AN 159 -53
AM-DZ 40 0
EA-AF 83 -33
AL-EB 46 -20
EC-AG 71 -114
AK-ED 64 -54
EE-AH 52 -7
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Purlins
In lieu of rigid ceiling use purlins to brace BC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.003C 999 180
HORZ(LL):-0.000H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T25
Ply: 1
Qty:1
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/37 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 17 -40
B - C 86 -147
Chords Tens.Comp.
C - D 108 -147
D - E 42 -66
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -8
H - G 49 -12
Chords Tens.Comp.
G - F 49 -12
F - E 80 -20
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 252 -390
C - G 61 -264
Webs Tens.Comp.
F - D 252 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4 2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Purlins
In lieu of rigid ceiling use purlins to brace BC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001C 999 240
VERT(TL): 0.003C 999 180
HORZ(LL):-0.000H - -
HORZ(TL):-0.002H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.270
Max BC CSI: 0.066
Max Web CSI: 0.121
Mfg Specified Camber:
Job Number: T92087 Truss Label:T25
Ply: 1
Qty:1
Wgt: 41.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I*104 /-/-/37 /-/5
Wind reactions based on MWFRS
I Brg Width = 144 Min Req =-
Bearing I is a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 17 -40
B - C 86 -147
Chords Tens.Comp.
C - D 108 -147
D - E 42 -66
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 80 -8
H - G 49 -12
Chords Tens.Comp.
G - F 49 -12
F - E 80 -20
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 252 -390
C - G 61 -264
Webs Tens.Comp.
F - D 252 -390
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
20'5"10
A
B
C
D
E
FGH
I
6 12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4 2X4(D8R)
12'
2'
2'
6'
4'
10'
4'
12'
2'
2'
2'
6'
4'
10'
4'
12'
2'
0"43'0"4
Lumber
Top chord 2x4 DF-L 2400f-2.0E :TC3 2x4 SPF #1/#2:Bot chord 2x4 DF-L 2400f-2.0E :BC2 2x4 SPF #1/#2:
Webs 2x3 SPF #1/#2 :w1 2x4 DF-L 2400f-2.0E::gb2, gb3, gb4, gb5, gb6, gb7, gb8, gb9, gb10, gb11, gb23, gb24, gb25, gb26, gb27, gb31, gb32, gb33, gb34, gb35, gb36 2x3 SPF #3:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 5.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002P 999 240
VERT(TL): 0.004P 999 180
HORZ(LL):-0.021B - -
HORZ(TL):-0.051B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.127
Max BC CSI: 0.071
Max Web CSI: 0.207
Mfg Specified Camber:
Job Number: T92087 Truss Label:T12
Ply: 1
Qty:1
Wgt: 558.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
CU*119 /-/-/62 /9 /23
CL*113 /-/-/52 /-/-
CB*120 /-/-/98 /22 /-
BS*110 /-/-/95 /39 /-
BH*122 /-/-/53 /8 /-
Wind reactions based on MWFRS
CUBrg Width = 144 Min Req =-
CLBrg Width = 144 Min Req =-
CBBrg Width = 108 Min Req =-
BSBrg Width = 144 Min Req =-
BHBrg Width = 167 Min Req =-
Bearings CU, CL, CB, BS, & BH are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 64 0
B - C 103 -76
C - D 129 -36
D - E 169 -35
E - F 208 -32
F - G 234 -32
G - H 260 -37
H - I 286 -42
I - J 312 -47
J - K 339 -52
K - L 365 -57
L - M 391 -61
M - N 418 -67
N - O 445 -72
O - P 473 -77
P - Q 491 -83
Q - R 453 -72
R - S 453 -72
Chords Tens.Comp.
Y - Z 453 -72
Z -AA 427 -66
AA-AB 479 -83
AB-AC 495 -80
AC-AD 484 -95
AD-AE 453 -106
AE-AF 426 -117
AF-AG 400 -128
AG-AH 373 -140
AH-AI 348 -151
AI-AJ 321 -162
AJ-AK 295 -174
AK-AL 269 -185
AL-AM 243 -196
AM-AN 218 -200
AN-AO 199 -192
AO-AP 203 -199
AP-AQ 207 -206
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
BC2
w1
gb2gb3gb4
gb5gb6
gb7
gb8
gb9
gb10
gb11
gb23
gb24
gb25
gb26
gb27 gb31gb32
gb33
gb34
gb35
gb36
(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)
(a)
(a)(a)(a)
(a)(a)(a)(a)
DT -1"12
9'1"28'7"2
A B C D E F G H I J K L M N O P Q R STU VWXYZAAABACADAE AF AGAH AI AJ AK ALAMANAOAP AQAR ASAT AU AV AW
AXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBT
BUBVBWBXBYBZCACBCCCDCECFCGCHCICJCKCLCMCNCOCPCQCRCSCTCU
6 12
412
5X6
5X8
4X8(**)
6X8
4X8(**)
1.5X4(OL)6X8(OL)
3X4
3X6
6X8
4X8
5X8
3X6(B1)
12'12'9'0"8 12'13'11"8
1'6"1'4"
(TYP)
1'5"41'2"12 3"121'0"4
9"46"12
20'4"8
20'4"8
32'4"8
12'
33'2"4
9"12
47'6"
14'3"12
59'
11'6"
33'0"8
33'0"8
59'
25'11"81'6"1'6"
6"
1'2"8 4'4"11'10"1212'2"7Lumber
Top chord 2x4 DF-L 2400f-2.0E :TC3 2x4 SPF #1/#2:Bot chord 2x4 DF-L 2400f-2.0E :BC2 2x4 SPF #1/#2:
Webs 2x3 SPF #1/#2 :w1 2x4 DF-L 2400f-2.0E::gb2, gb3, gb4, gb5, gb6, gb7, gb8, gb9, gb10, gb11, gb23, gb24, gb25, gb26, gb27, gb31, gb32, gb33, gb34, gb35, gb36 2x3 SPF #3:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioningrequirements.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.04 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 5.90 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002P 999 240
VERT(TL): 0.004P 999 180
HORZ(LL):-0.021B - -
HORZ(TL):-0.051B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.127
Max BC CSI: 0.071
Max Web CSI: 0.207
Mfg Specified Camber:
Job Number: T92087 Truss Label:T12
Ply: 1
Qty:1
Wgt: 558.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
CU*119 /-/-/62 /9 /23
CL*113 /-/-/52 /-/-
CB*120 /-/-/98 /22 /-
BS*110 /-/-/95 /39 /-
BH*122 /-/-/53 /8 /-
Wind reactions based on MWFRS
CUBrg Width = 144 Min Req =-
CLBrg Width = 144 Min Req =-
CBBrg Width = 108 Min Req =-
BSBrg Width = 144 Min Req =-
BHBrg Width = 167 Min Req =-
Bearings CU, CL, CB, BS, & BH are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 64 0
B - C 103 -76
C - D 129 -36
D - E 169 -35
E - F 208 -32
F - G 234 -32
G - H 260 -37
H - I 286 -42
I - J 312 -47
J - K 339 -52
K - L 365 -57
L - M 391 -61
M - N 418 -67
N - O 445 -72
O - P 473 -77
P - Q 491 -83
Q - R 453 -72
R - S 453 -72
Chords Tens.Comp.
Y - Z 453 -72
Z -AA 427 -66
AA-AB 479 -83
AB-AC 495 -80
AC-AD 484 -95
AD-AE 453 -106
AE-AF 426 -117
AF-AG 400 -128
AG-AH 373 -140
AH-AI 348 -151
AI-AJ 321 -162
AJ-AK 295 -174
AK-AL 269 -185
AL-AM 243 -196
AM-AN 218 -200
AN-AO 199 -192
AO-AP 203 -199
AP-AQ 207 -206
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC3
BC2
w1
gb2gb3gb4
gb5gb6
gb7
gb8
gb9
gb10
gb11
gb23
gb24
gb25
gb26
gb27 gb31gb32
gb33
gb34
gb35
gb36
(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)(a)
(a)
(a)(a)(a)
(a)(a)(a)(a)
DT -1"12
9'1"28'7"2
A B C D E F G H I J K L M N O P Q R STU VWXYZAAABACADAE AF AGAH AI AJ AK ALAMANAOAP AQAR ASAT AU AV AW
AXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBT
BUBVBWBXBYBZCACBCCCDCECFCGCHCICJCKCLCMCNCOCPCQCRCSCTCU
6 12
412
5X6
5X8
4X8(**)
6X8
4X8(**)
1.5X4(OL)6X8(OL)
3X4
3X6
6X8
4X8
5X8
3X6(B1)
12'12'9'0"8 12'13'11"8
1'6"1'4"
(TYP)
1'5"41'2"12 3"121'0"4
9"46"12
20'4"8
20'4"8
32'4"8
12'
33'2"4
9"12
47'6"
14'3"12
59'
11'6"
33'0"8
33'0"8
59'
25'11"81'6"1'6"
6"
1'2"8 4'4"11'10"1212'2"7
Job Number: T92087 Truss Label:T12
Ply: 1
Qty:1
Wgt: 558.6 lbs
Maximum Gable Forces Per Ply (lbs)
GablesTens.Comp.
CU- B 202 -288
C -CT 40 -44
D -CS 77 -128
E -CR 70 -122
F -CQ 43 -123
G -CP 41 -120
H -CO 42 -123
I -CN 41 -122
J -CM 41 -123
K -CK 42 -123
L -CJ 41 -120
M -CI 42 -125
N -CH 43 -121
O -CG 47 -124
P -CF 20 -146
CE- Q 14 -209
R -CD 0 -122
S -CC 0 -124
T -CA 0 -123
U -BZ 0 -123
V -BY 0 -123
W -BX 0 -123
X -BW 0 -126
Gables Tens.Comp.
Y -BV 2 -128
Z -BU 7 -61
AA-BT 17 -137
BQ-AC 26 -73
BP-AD 50 -124
BO-AE 43 -125
BN-AF 41 -123
BM-AG 42 -125
BL-AH 40 -119
BK-AI 62 -124
BJ-AJ 81 -123
BI-AK 82 -124
BG-AL 82 -124
BF-AM 62 -90
AN-BE 48 -56
BD-AO 57 -92
BC-AP 72 -123
BB-AQ 72 -122
BA-AR 71 -121
AZ-AS 49 -121
AY-AT 55 -113
AX-AU 95 -153
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 19.25 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.012D 999 240
VERT(TL): 0.022D 999 180
HORZ(LL):-0.005D - -
HORZ(TL):-0.010D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.277
Max BC CSI: 0.171
Max Web CSI: 0.163
Mfg Specified Camber:
Job Number: T92087 Truss Label:T18
Ply: 1
Qty:1
Wgt: 27.3 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/42 /0 /5
Wind reactions based on MWFRS
C Brg Width = 94.9 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 284 -41
Chords Tens.Comp.
B - C 284 -41
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 64 -185
Chords Tens.Comp.
D - C 64 -185
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 86 -492
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
17'11"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
7'10"15
3'11"8
3'11"8
7'10"15
3'11"8
3'11"8
3'11"8
7'10"15
3'11"8
0"42'3"15Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 19.25 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.012D 999 240
VERT(TL): 0.022D 999 180
HORZ(LL):-0.005D - -
HORZ(TL):-0.010D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.277
Max BC CSI: 0.171
Max Web CSI: 0.163
Mfg Specified Camber:
Job Number: T92087 Truss Label:T18
Ply: 1
Qty:1
Wgt: 27.3 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/42 /0 /5
Wind reactions based on MWFRS
C Brg Width = 94.9 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 284 -41
Chords Tens.Comp.
B - C 284 -41
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 64 -185
Chords Tens.Comp.
D - C 64 -185
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 86 -492
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
17'11"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
7'10"15
3'11"8
3'11"8
7'10"15
3'11"8
3'11"8
3'11"8
7'10"15
3'11"8
0"42'3"15
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 18.67 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004C 999 240
VERT(TL): 0.008C 999 180
HORZ(LL): 0.003D - -
HORZ(TL): 0.005D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.290
Max BC CSI: 0.447
Max Web CSI: 0.186
Mfg Specified Camber:
Job Number: T92087 Truss Label:T17
Ply: 1
Qty:4
Wgt: 43.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 592 /-/-/258 /39 /85
F 592 /-/-/258 /39 /-
Wind reactions based on MWFRS
G Brg Width = 5.5 Min Req =1.5
F Brg Width = 5.5 Min Req =1.5
Bearings G & F Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 123 -128
Chords Tens.Comp.
C - D 122 -128
D - E 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
G - F 195 -27
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 176 -364
G - C 46 -231
Webs Tens.Comp.
C - F 46 -231
D - F 174 -364
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'7"2
A
B
C
D
E
FG
7
12
1.5X4
3X6(R)
4X4
1.5X4
3X6(R)
8'
4'
4'
8'
4'
8'
8'1'6"1'6"1'4"23'8"2Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 18.67 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004C 999 240
VERT(TL): 0.008C 999 180
HORZ(LL): 0.003D - -
HORZ(TL): 0.005D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.290
Max BC CSI: 0.447
Max Web CSI: 0.186
Mfg Specified Camber:
Job Number: T92087 Truss Label:T17
Ply: 1
Qty:4
Wgt: 43.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 592 /-/-/258 /39 /85
F 592 /-/-/258 /39 /-
Wind reactions based on MWFRS
G Brg Width = 5.5 Min Req =1.5
F Brg Width = 5.5 Min Req =1.5
Bearings G & F Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 123 -128
Chords Tens.Comp.
C - D 122 -128
D - E 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
G - F 195 -27
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 176 -364
G - C 46 -231
Webs Tens.Comp.
C - F 46 -231
D - F 174 -364
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'7"2
A
B
C
D
E
FG
7
12
1.5X4
3X6(R)
4X4
1.5X4
3X6(R)
8'
4'
4'
8'
4'
8'
8'1'6"1'6"1'4"23'8"2
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 19.75 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008 999 240
VERT(TL): 0.015 999 180
HORZ(LL):-0.003 - -
HORZ(TL):-0.006 - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.113
Max BC CSI: 0.156
Max Web CSI: 0.000
Mfg Specified Camber:
Job Number: T92087 Truss Label:T19
Ply: 1
Qty:1
Wgt: 15.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/40 /-/5
Wind reactions based on MWFRS
C Brg Width = 53.8 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 49 -261
Chords Tens.Comp.
B - C 49 -261
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - C 233 -21
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
18'11"5
A
B
C
7
12
2X4(D8R)
3X4
2X4(D8R)
4'5"13
2'2"14
2'2"14
4'5"13
2'2"14
4'5"13
4'5"13
0"41'3"15Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 19.75 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008 999 240
VERT(TL): 0.015 999 180
HORZ(LL):-0.003 - -
HORZ(TL):-0.006 - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.113
Max BC CSI: 0.156
Max Web CSI: 0.000
Mfg Specified Camber:
Job Number: T92087 Truss Label:T19
Ply: 1
Qty:1
Wgt: 15.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/40 /-/5
Wind reactions based on MWFRS
C Brg Width = 53.8 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 49 -261
Chords Tens.Comp.
B - C 49 -261
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - C 233 -21
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
18'11"5
A
B
C
7
12
2X4(D8R)
3X4
2X4(D8R)
4'5"13
2'2"14
2'2"14
4'5"13
2'2"14
4'5"13
4'5"13
0"41'3"15
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Bracing
Fasten rated sheathing to one face of this frame.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 18.67 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002C 999 240
VERT(TL):-0.005C 999 180
HORZ(LL): 0.064B - -
HORZ(TL): 0.138B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.240
Max BC CSI: 0.040
Max Web CSI: 0.113
Mfg Specified Camber:
Job Number: T92087 Truss Label:T20
Ply: 1
Qty:1
Wgt: 47.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P*118 /-/-/46 /3 /11
J 297 /-/-/108 /56 /-
Wind reactions based on MWFRS
P Brg Width = 90.5 Min Req =-
J Brg Width = 5.5 Min Req =1.5
Bearings P & J Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 72 0
B - C 90 -78
C - D 104 -34
D - E 134 -40
Chords Tens.Comp.
E - F 133 -40
F - G 104 -34
G - H 90 -78
H - I 72 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
P - O 47 -44
O - N 45 -41
N - M 44 -41
Chords Tens.Comp.
M - L 44 -41
L - K 45 -41
K - J 42 -39
Maximum Gable Forces Per Ply (lbs)
GablesTens.Comp.
P - B 156 -286
C - O 69 -48
D - N 51 -144
E - M 0 -111
Gables Tens.Comp.
L - F 52 -144
K - G 69 -48
H - J 153 -286
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'7"2
A
B
C
D
E
F
G
H
I
J
KLMNO
P
7
12
3X6(R)
4X4
3X6(R)
8'
1'4"
(TYP)
1'2"12
4'
4'
8'
4'
8'
8'1'6"1'6"1'4"23'8"2Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Bracing
Fasten rated sheathing to one face of this frame.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWGS A11530ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 18.67 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002C 999 240
VERT(TL):-0.005C 999 180
HORZ(LL): 0.064B - -
HORZ(TL): 0.138B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.240
Max BC CSI: 0.040
Max Web CSI: 0.113
Mfg Specified Camber:
Job Number: T92087 Truss Label:T20
Ply: 1
Qty:1
Wgt: 47.6 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P*118 /-/-/46 /3 /11
J 297 /-/-/108 /56 /-
Wind reactions based on MWFRS
P Brg Width = 90.5 Min Req =-
J Brg Width = 5.5 Min Req =1.5
Bearings P & J Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 72 0
B - C 90 -78
C - D 104 -34
D - E 134 -40
Chords Tens.Comp.
E - F 133 -40
F - G 104 -34
G - H 90 -78
H - I 72 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
P - O 47 -44
O - N 45 -41
N - M 44 -41
Chords Tens.Comp.
M - L 44 -41
L - K 45 -41
K - J 42 -39
Maximum Gable Forces Per Ply (lbs)
GablesTens.Comp.
P - B 156 -286
C - O 69 -48
D - N 51 -144
E - M 0 -111
Gables Tens.Comp.
L - F 52 -144
K - G 69 -48
H - J 153 -286
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'7"2
A
B
C
D
E
F
G
H
I
J
KLMNO
P
7
12
3X6(R)
4X4
3X6(R)
8'
1'4"
(TYP)
1'2"12
4'
4'
8'
4'
8'
8'1'6"1'6"1'4"23'8"2
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E :BC2 2x4 SPF #1/#2:
Webs 2x4 SPF #1/#2 :w3, w12 2x3 SPF #3::w5, w6, w8, w9, w10, w11 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be taken
during handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 0.00 ft
Enclosure: Closed Category:
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: NA
I: 1.15GCpi: 0.18
Wind Duration: 0.00
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.274P 999 240
VERT(TL): 0.519P 999 180
HORZ(LL): 0.127L - -
HORZ(TL): 0.241L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.974
Max BC CSI: 0.857
Max Web CSI: 0.989
Mfg Specified Camber:
Job Number: T92087 Truss Label:T7
Ply: 1
Qty:2
Wgt: 295.0 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2781 /-/-/-/-/-
L 2638 /-/-/-/-/-
Wind reactions based on MWFRS
S Brg Width = 5.5 Min Req =4.4
L Brg Width = 5.5 Min Req =4.1
Bearings S & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 0 -312
C - D 0-4051
D - E 0-3319
E - F 0-2794
Chords Tens.Comp.
F - G 0 -2645
G - H 0 -2844
H - I 0 -2472
I - J 0 -2628
J - K 83 -61
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
S - R 3607 0
R - Q 3353 0
Q - P 3353 0
P - O 2805 0
Chords Tens.Comp.
O - N 2355 0
N - M 2355 0
M - L 1560 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 0 -507
S - C 0-4075
C - R 0 -171
R - D 370 0D - P 0 -808
P - E 846 0
P - F 0 -28
Webs Tens.Comp.
F - O 0 -616
O - G 726 0
O - H 135 0
H - M 0 -702M - J 1122 0
J - L 0 -2907
K - L 0 -117
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
BC2
w3
w5
w6
w8
w9
w10
w11
w12
(a)
(a)
(a)
(a)(a)
(a)
(a)
DT -1"12
9'1"2AB
C
D
E F G
H
I
J
K
LMNOPQRS
6 12
2X4
6X8
8X8
3X4
4X4
SS0312 4X8
6X6
3X4
4X8 4X8
6X6
3X4
4X6(R)
3X8
6X8
1.5X4
4X8(R)
47'
6'9"12
6'9"12
13'7"
6'9"4
20'4"8
6'9"8
26'4"8
6'
32'4"8
6'
37'11"
5'6"8
39'9"1
1'10"1
43'5"8
3'8"7 47'
3'6"8
10'2"12
10'2"12
16'
5'9"4
19'7"3
3'7"3
29'4"13
9'9"10
32'
2'7"3
39'2"6
7'2"6
47'
7'9"101'6"
1'2"8 4'1"11'4"12Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E :BC2 2x4 SPF #1/#2:
Webs 2x4 SPF #1/#2 :w3, w12 2x3 SPF #3::w5, w6, w8, w9, w10, w11 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be taken
during handling, shipping and installation of trusses. See"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 0.00 ft
Enclosure: Closed Category:
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: NA
I: 1.15GCpi: 0.18
Wind Duration: 0.00
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.274P 999 240
VERT(TL): 0.519P 999 180
HORZ(LL): 0.127L - -
HORZ(TL): 0.241L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.974
Max BC CSI: 0.857
Max Web CSI: 0.989
Mfg Specified Camber:
Job Number: T92087 Truss Label:T7
Ply: 1
Qty:2
Wgt: 295.0 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2781 /-/-/-/-/-
L 2638 /-/-/-/-/-
Wind reactions based on MWFRS
S Brg Width = 5.5 Min Req =4.4
L Brg Width = 5.5 Min Req =4.1
Bearings S & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 0 -312
C - D 0-4051
D - E 0-3319
E - F 0-2794
Chords Tens.Comp.
F - G 0 -2645
G - H 0 -2844
H - I 0 -2472
I - J 0 -2628
J - K 83 -61
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
S - R 3607 0
R - Q 3353 0
Q - P 3353 0
P - O 2805 0
Chords Tens.Comp.
O - N 2355 0
N - M 2355 0
M - L 1560 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 0 -507
S - C 0-4075
C - R 0 -171
R - D 370 0D - P 0 -808
P - E 846 0
P - F 0 -28
Webs Tens.Comp.
F - O 0 -616
O - G 726 0
O - H 135 0
H - M 0 -702M - J 1122 0
J - L 0 -2907
K - L 0 -117
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
BC2
w3
w5
w6
w8
w9
w10
w11
w12
(a)
(a)
(a)
(a)(a)
(a)
(a)
DT -1"12
9'1"2AB
C
D
E F G
H
I
J
K
LMNOPQRS
6 12
2X4
6X8
8X8
3X4
4X4
SS0312 4X8
6X6
3X4
4X8 4X8
6X6
3X4
4X6(R)
3X8
6X8
1.5X4
4X8(R)
47'
6'9"12
6'9"12
13'7"
6'9"4
20'4"8
6'9"8
26'4"8
6'
32'4"8
6'
37'11"
5'6"8
39'9"1
1'10"1
43'5"8
3'8"7 47'
3'6"8
10'2"12
10'2"12
16'
5'9"4
19'7"3
3'7"3
29'4"13
9'9"10
32'
2'7"3
39'2"6
7'2"6
47'
7'9"101'6"
1'2"8 4'1"11'4"12
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 17.16 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004D 999 240
VERT(TL): 0.007D 999 180
HORZ(LL):-0.002D - -
HORZ(TL):-0.004D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.116
Max BC CSI: 0.079
Max Web CSI: 0.090
Mfg Specified Camber:
Job Number: T92087 Truss Label:T4
Ply: 1
Qty:1
Wgt: 18.9 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/41 /-/5
Wind reactions based on MWFRS
C Brg Width = 67.0 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 145 -14
Chords Tens.Comp.
B - C 145 -14
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 33 -85
Chords Tens.Comp.
D - C 33 -85
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 47 -282
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
5'7"
2'9"8
2'9"8
5'7"
2'9"8
2'9"8
2'9"8
5'7"
2'9"8
0"41'7"13Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 17.16 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004D 999 240
VERT(TL): 0.007D 999 180
HORZ(LL):-0.002D - -
HORZ(TL):-0.004D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.116
Max BC CSI: 0.079
Max Web CSI: 0.090
Mfg Specified Camber:
Job Number: T92087 Truss Label:T4
Ply: 1
Qty:1
Wgt: 18.9 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/41 /-/5
Wind reactions based on MWFRS
C Brg Width = 67.0 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 145 -14
Chords Tens.Comp.
B - C 145 -14
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 33 -85
Chords Tens.Comp.
D - C 33 -85
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 47 -282
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
16'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
5'7"
2'9"8
2'9"8
5'7"
2'9"8
2'9"8
2'9"8
5'7"
2'9"8
0"41'7"13
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 4.50 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014C 999 240
VERT(TL): 0.027C 999 180
HORZ(LL): 0.008F - -
HORZ(TL): 0.016F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.378
Max BC CSI: 0.400
Max Web CSI: 0.762
Mfg Specified Camber:
Job Number: T92087 Truss Label:T2
Ply: 1
Qty:1
Wgt: 112.7 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 968 /-/-/431 /15 /131
I 678 /-/-/268 /28 /-
H 623 /-/-/267 /-/-
Wind reactions based on MWFRS
K Brg Width = 3.5 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings K, I, & H Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 199 -105
C - D 80 -470
Chords Tens.Comp.
D - E 84 -472
E - F 173 -60
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
L - K 4 -1
K - J 453 -49
J - I 47 -32
Chords Tens.Comp.
I - H 308 0
H - G 6 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 0 -259
B - K 244 -163
K - C 38 -747
C - J 77 -201
D - J 109 -73
Webs Tens.Comp.
J - E 447 0
I - E 72 -688
E - H 30 -524
H - F 105 -94
F - G 0 -126
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E
F
GHIJKL
7 12
3X4
1.5X4 3X4
3X4
4X4
3X6 1.5X4
4X6
3X4
3X4
1.5X4
8"4 11'6'3"12 8"4
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"1'11"97'4"15Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 4.50 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014C 999 240
VERT(TL): 0.027C 999 180
HORZ(LL): 0.008F - -
HORZ(TL): 0.016F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.378
Max BC CSI: 0.400
Max Web CSI: 0.762
Mfg Specified Camber:
Job Number: T92087 Truss Label:T2
Ply: 1
Qty:1
Wgt: 112.7 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 968 /-/-/431 /15 /131
I 678 /-/-/268 /28 /-
H 623 /-/-/267 /-/-
Wind reactions based on MWFRS
K Brg Width = 3.5 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings K, I, & H Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 199 -105
C - D 80 -470
Chords Tens.Comp.
D - E 84 -472
E - F 173 -60
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
L - K 4 -1
K - J 453 -49
J - I 47 -32
Chords Tens.Comp.
I - H 308 0
H - G 6 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 0 -259
B - K 244 -163
K - C 38 -747
C - J 77 -201
D - J 109 -73
Webs Tens.Comp.
J - E 447 0
I - E 72 -688
E - H 30 -524
H - F 105 -94
F - G 0 -126
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E
F
GHIJKL
7 12
3X4
1.5X4 3X4
3X4
4X4
3X6 1.5X4
4X6
3X4
3X4
1.5X4
8"4 11'6'3"12 8"4
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"1'11"97'4"15
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014D 999 240
VERT(TL): 0.026D 999 180
HORZ(LL): 0.008F - -
HORZ(TL): 0.017F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.485
Max BC CSI: 0.400
Max Web CSI: 0.757
Mfg Specified Camber:
Job Number: T92087 Truss Label:T5
Ply: 1
Qty:3
Wgt: 115.5 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 967 /-/-/428 /17 /144
J 666 /-/-/255 /21 /-
I 788 /-/-/355 /11 /-
Wind reactions based on MWFRS
L Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
Bearings L, J, & I Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 199 -105
C - D 107 -463
Chords Tens.Comp.
D - E 106 -462
E - F 236 -45
F - G 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
M - L 4 -1
L - K 447 -70
K - J 87 -56
Chords Tens.Comp.
J - I 296 0
I - H 4 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 0 -259
B - L 247 -163
L - C 73 -745
C - K 92 -203
D - K 105 -88
Webs Tens.Comp.
K - E 471 0
J - E 91 -674
E - I 37 -573
I - F 181 -233
F - H 0 -127
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E
F
G
HIJKLM
7
12
3X4
1.5X4 3X4
3X4
4X4(R1)
3X6 1.5X4
4X6
3X4
3X4
1.5X4
8"4 11'6'3"12 8"4
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"
1'6"1'11"97'4"15Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014D 999 240
VERT(TL): 0.026D 999 180
HORZ(LL): 0.008F - -
HORZ(TL): 0.017F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.485
Max BC CSI: 0.400
Max Web CSI: 0.757
Mfg Specified Camber:
Job Number: T92087 Truss Label:T5
Ply: 1
Qty:3
Wgt: 115.5 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 967 /-/-/428 /17 /144
J 666 /-/-/255 /21 /-
I 788 /-/-/355 /11 /-
Wind reactions based on MWFRS
L Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
I Brg Width = 3.5 Min Req =1.5
Bearings L, J, & I Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 199 -105
C - D 107 -463
Chords Tens.Comp.
D - E 106 -462
E - F 236 -45
F - G 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
M - L 4 -1
L - K 447 -70
K - J 87 -56
Chords Tens.Comp.
J - I 296 0
I - H 4 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 0 -259
B - L 247 -163
L - C 73 -745
C - K 92 -203
D - K 105 -88
Webs Tens.Comp.
K - E 471 0
J - E 91 -674
E - I 37 -573
I - F 181 -233
F - H 0 -127
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E
F
G
HIJKLM
7
12
3X4
1.5X4 3X4
3X4
4X4(R1)
3X6 1.5X4
4X6
3X4
3X4
1.5X4
8"4 11'6'3"12 8"4
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"
1'6"1'11"97'4"15
Lumber
Top chord 2x4 SPF #1/#2 :TC1, TC2 2x4 DF-L 2400f-2.0E:
Bot chord 2x4 SPF #1/#2 :BC2, BC4 2x4 SPF 1650f-1.5E:Webs 2x4 SPF #1/#2 :w2 2x4 SPF 1650f-1.5E::w3, w5 2x4 SPF Stud::w6, w17 2x3 SPF #3:
:w11, w13, w14, w15, w16 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 0.00 ft
Enclosure: Closed Category:
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: NA
I: 1.15GCpi: 0.18
Wind Duration: 0.00
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.388E 999 240
VERT(TL): 0.736E 766 180
HORZ(LL): 0.254L - -
HORZ(TL): 0.480L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.830
Max BC CSI: 0.945
Max Web CSI: 0.955
Mfg Specified Camber:
Job Number: T92087 Truss Label:T9
Ply: 1
Qty:2
Wgt: 331.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 2781 /-/-/-/-/-
L 2638 /-/-/-/-/-
Wind reactions based on MWFRS
W Brg Width = 5.5 Min Req =4.4
L Brg Width = 5.5 Min Req =4.1
Bearings W & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 0-6686
C - D 0-6867
D - E 0-4813
E - F 0-4343
Chords Tens.Comp.
F - G 0 -2784
G - H 0 -2646
H - I 0 -2844
I - J 0 -2628
J - K 83 -60
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
W - V 199 0
U - T 4838 0
T - R 3820 0
S - Q 70 0
Q - P 2807 0
Chords Tens.Comp.
P - O 2807 0
O - N 2354 0
N - M 2354 0
M - L 1560 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - W 0-2664
B - U 5883 0
W - U 0 -195
C - U 0 -101
U - V 12 0
U - D 1559 0
D - T 0 -924
Webs Tens.Comp.
R - F 2071 0
Q - F 0 -422
Q - G 0 -50
G - O 0 -618
O - H 729 0
O - I 138 0
I - M 0 -701
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC1
TC2
BC2
BC4
w2
w3
w5 w6
w11
w13
w14
w15
w16
w17
(a)(a)(a)(a)
(a)
(a)
DT -1"12
9'1"2AB
C
D
E
F G H
I
J
K
LMNOPQ
R ST
UVW
6 12
6X12
5X6(R)
SS0719
6X6
4X4
4X4
SS0719
2X4
8X8
6X12
SS0312
3X4
4X8
5X6
4X8
5X6
4X6(R)
6X8
4X8(R)
47'
5"6
5"6
2'3"4
1'9"14 6'9"4
4'6"
14'7"
7'9"12
20'4"8
5'9"8
26'4"8
6'
32'4"8
6'
37'11"7
5'6"15
43'5"8
5'6"1
47'
3'6"8
2'5"
2'5"
10'2"12
7'9"12
14'7"
4'4"4
19'7"3
5'0"3
24'7"
4'11"13
29'4"13
4'9"13
34'7"
5'2"3
39'2"6
4'7"6
47'
7'9"101'6"
1'2"8 4'1"1'11'4"12Lumber
Top chord 2x4 SPF #1/#2 :TC1, TC2 2x4 DF-L 2400f-2.0E:
Bot chord 2x4 SPF #1/#2 :BC2, BC4 2x4 SPF 1650f-1.5E:Webs 2x4 SPF #1/#2 :w2 2x4 SPF 1650f-1.5E::w3, w5 2x4 SPF Stud::w6, w17 2x3 SPF #3:
:w11, w13, w14, w15, w16 2x3 SPF #1/#2:
Bracing
(a) Continuous lateral restraint equally spaced onmember.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flatTC @ 24" oc.
Additional Notes
WARNING: Furnish a copy of this DWG to theinstallation contractor. Special care must be takenduring handling, shipping and installation of trusses. See
"WARNING" note below.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 0.00 ft
Enclosure: Closed Category:
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: NA
I: 1.15GCpi: 0.18
Wind Duration: 0.00
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.388E 999 240
VERT(TL): 0.736E 766 180
HORZ(LL): 0.254L - -
HORZ(TL): 0.480L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.830
Max BC CSI: 0.945
Max Web CSI: 0.955
Mfg Specified Camber:
Job Number: T92087 Truss Label:T9
Ply: 1
Qty:2
Wgt: 331.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 2781 /-/-/-/-/-
L 2638 /-/-/-/-/-
Wind reactions based on MWFRS
W Brg Width = 5.5 Min Req =4.4
L Brg Width = 5.5 Min Req =4.1
Bearings W & L Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 62 0
B - C 0-6686
C - D 0-6867
D - E 0-4813
E - F 0-4343
Chords Tens.Comp.
F - G 0 -2784
G - H 0 -2646
H - I 0 -2844
I - J 0 -2628
J - K 83 -60
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
W - V 199 0
U - T 4838 0
T - R 3820 0
S - Q 70 0
Q - P 2807 0
Chords Tens.Comp.
P - O 2807 0
O - N 2354 0
N - M 2354 0
M - L 1560 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - W 0-2664
B - U 5883 0
W - U 0 -195
C - U 0 -101
U - V 12 0
U - D 1559 0
D - T 0 -924
Webs Tens.Comp.
R - F 2071 0
Q - F 0 -422
Q - G 0 -50
G - O 0 -618
O - H 729 0
O - I 138 0
I - M 0 -701
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC1
TC2
BC2
BC4
w2
w3
w5 w6
w11
w13
w14
w15
w16
w17
(a)(a)(a)(a)
(a)
(a)
DT -1"12
9'1"2AB
C
D
E
F G H
I
J
K
LMNOPQ
R ST
UVW
6 12
6X12
5X6(R)
SS0719
6X6
4X4
4X4
SS0719
2X4
8X8
6X12
SS0312
3X4
4X8
5X6
4X8
5X6
4X6(R)
6X8
4X8(R)
47'
5"6
5"6
2'3"4
1'9"14 6'9"4
4'6"
14'7"
7'9"12
20'4"8
5'9"8
26'4"8
6'
32'4"8
6'
37'11"7
5'6"15
43'5"8
5'6"1
47'
3'6"8
2'5"
2'5"
10'2"12
7'9"12
14'7"
4'4"4
19'7"3
5'0"3
24'7"
4'11"13
29'4"13
4'9"13
34'7"
5'2"3
39'2"6
4'7"6
47'
7'9"101'6"
1'2"8 4'1"1'11'4"12
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.68 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008F 999 240
VERT(TL): 0.015F 999 180
HORZ(LL):-0.003F - -
HORZ(TL):-0.006F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.357
Max BC CSI: 0.091
Max Web CSI: 0.197
Mfg Specified Camber:
Job Number: T92087 Truss Label:T10
Ply: 1
Qty:1
Wgt: 58.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*113 /-/-/43 /1 /5
Wind reactions based on MWFRS
E Brg Width = 189 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 115 -30
B - C 109 -83
Chords Tens.Comp.
C - D 109 -83
D - E 115 -61
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 38 -36
H - G 41 -41
Chords Tens.Comp.
G - F 41 -41
F - E 38 -40
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 90 -420
C - G 0 -334
Webs Tens.Comp.
F - D 90 -420
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13'2"11
A
B
C
D
E
FGH
7
12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4
2X4(D8R)
15'9"2
3'10"9
3'10"9
7'10"9
4'
11'10"9
4'
15'9"2
3'10"9
3'10"9
3'10"9
7'10"9
4'
11'10"9
4'
15'9"2
3'10"9
0"44'7"7Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.68 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008F 999 240
VERT(TL): 0.015F 999 180
HORZ(LL):-0.003F - -
HORZ(TL):-0.006F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.357
Max BC CSI: 0.091
Max Web CSI: 0.197
Mfg Specified Camber:
Job Number: T92087 Truss Label:T10
Ply: 1
Qty:1
Wgt: 58.8 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*113 /-/-/43 /1 /5
Wind reactions based on MWFRS
E Brg Width = 189 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 115 -30
B - C 109 -83
Chords Tens.Comp.
C - D 109 -83
D - E 115 -61
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - H 38 -36
H - G 41 -41
Chords Tens.Comp.
G - F 41 -41
F - E 38 -40
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 90 -420
C - G 0 -334
Webs Tens.Comp.
F - D 90 -420
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13'2"11
A
B
C
D
E
FGH
7
12
2X4(D8R)
1.5X4
1.5X4
4X4
1.5X4 1.5X4
1.5X4
2X4(D8R)
15'9"2
3'10"9
3'10"9
7'10"9
4'
11'10"9
4'
15'9"2
3'10"9
3'10"9
3'10"9
7'10"9
4'
11'10"9
4'
15'9"2
3'10"9
0"44'7"7
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.66 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.017D 999 240
VERT(TL): 0.033D 999 180
HORZ(LL):-0.008D - -
HORZ(TL):-0.015D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.370
Max BC CSI: 0.225
Max Web CSI: 0.209
Mfg Specified Camber:
Job Number: T92087 Truss Label:T3
Ply: 1
Qty:1
Wgt: 31.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/42 /0 /5
Wind reactions based on MWFRS
C Brg Width = 108 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 365 -52
Chords Tens.Comp.
B - C 365 -51
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 74 -246
Chords Tens.Comp.
D - C 74 -246
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 95 -606
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
15'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
9'0"2
4'6"1
4'6"1
9'0"2
4'6"1
4'6"1
4'6"1
9'0"2
4'6"1
0"42'7"13Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.66 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.017D 999 240
VERT(TL): 0.033D 999 180
HORZ(LL):-0.008D - -
HORZ(TL):-0.015D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.370
Max BC CSI: 0.225
Max Web CSI: 0.209
Mfg Specified Camber:
Job Number: T92087 Truss Label:T3
Ply: 1
Qty:1
Wgt: 31.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/42 /0 /5
Wind reactions based on MWFRS
C Brg Width = 108 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 365 -52
Chords Tens.Comp.
B - C 365 -51
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 74 -246
Chords Tens.Comp.
D - C 74 -246
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 95 -606
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
15'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
9'0"2
4'6"1
4'6"1
9'0"2
4'6"1
4'6"1
4'6"1
9'0"2
4'6"1
0"42'7"13
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.039AA 999 240
VERT(TL): 0.074AA 999 180
HORZ(LL): 0.019G - -
HORZ(TL): 0.037G - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.367
Max BC CSI: 0.225
Max Web CSI: 0.820
Mfg Specified Camber:
Job Number: T92087 Truss Label:T6
Ply: 1
Qty:1
Wgt: 171.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AE939 /-/-/419 /17 /144
W 744 /-/-/304 /22 /-
S 736 /-/-/322 /11 /-
Wind reactions based on MWFRS
AEBrg Width = 3.5 Min Req =1.5
W Brg Width = 3.5 Min Req =1.5
S Brg Width = 3.5 Min Req =1.5
Bearings AE, W, & S Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 87 -34
C - D 111 -34
D - E 187 0
E - F 68 -428
F - G 75 -338
G - H 98 -318H - I 118 -290
Chords Tens.Comp.
I - J 120 -315
J - K 97 -312
K - L 73 -333
L - M 64 -368
M - N 177 -4
N - O 109 -39
O - P 84 -40P - Q 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 2 -1
AE-AD 430 -70
AD-AC 430 -70
AC-AB 432 -69
AB-AA 432 -69
AA- Z 432 -69
Z - Y 432 -69
Chords Tens.Comp.
Y - X 80 -79
X - W 80 -79
W - V 232 -16
V - U 231 -16
U - T 229 -16
T - S 229 -16
S - R 2 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E F
G
H
I
J
K
L M
N
O
P
Q
RSTUVWXYZAAABACADAEAF
AG
AH AI
AJ AKAL
AMAN
AOAP AQAR
ASAT
AU
AV
AW AX
AYAZ
BA
7 12
3X4
3X4
3X4
4X4(R1)
3X6
4X6
3X4
3X4
8"4 11'6'3"12 8"4
1'4"2 1'4"(TYP)2'8"
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"
1'6"1'11"97'4"15Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF 1650f-1.5E
Webs 2x3 SPF #3
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Gable end supports 8" max rake overhang. Top chordmust not be cut or notched.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Left and right cantilevers are exposed to wind
Additional Notes
See DWGS A11515ENC101014, GBLLETIN0118, &GABRST101014 for gable wind bracing and otherrequirements.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 15.00 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: 0 to h/2C&C Dist a: 3.00 ftLoc. from endwall: Any
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.039AA 999 240
VERT(TL): 0.074AA 999 180
HORZ(LL): 0.019G - -
HORZ(TL): 0.037G - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.367
Max BC CSI: 0.225
Max Web CSI: 0.820
Mfg Specified Camber:
Job Number: T92087 Truss Label:T6
Ply: 1
Qty:1
Wgt: 171.1 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AE939 /-/-/419 /17 /144
W 744 /-/-/304 /22 /-
S 736 /-/-/322 /11 /-
Wind reactions based on MWFRS
AEBrg Width = 3.5 Min Req =1.5
W Brg Width = 3.5 Min Req =1.5
S Brg Width = 3.5 Min Req =1.5
Bearings AE, W, & S Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 70 0
B - C 87 -34
C - D 111 -34
D - E 187 0
E - F 68 -428
F - G 75 -338
G - H 98 -318H - I 118 -290
Chords Tens.Comp.
I - J 120 -315
J - K 97 -312
K - L 73 -333
L - M 64 -368
M - N 177 -4
N - O 109 -39
O - P 84 -40P - Q 70 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 2 -1
AE-AD 430 -70
AD-AC 430 -70
AC-AB 432 -69
AB-AA 432 -69
AA- Z 432 -69
Z - Y 432 -69
Chords Tens.Comp.
Y - X 80 -79
X - W 80 -79
W - V 232 -16
V - U 231 -16
U - T 229 -16
T - S 229 -16
S - R 2 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
10'5"2
A
B
C
D
E F
G
H
I
J
K
L M
N
O
P
Q
RSTUVWXYZAAABACADAEAF
AG
AH AI
AJ AKAL
AMAN
AOAP AQAR
ASAT
AU
AV
AW AX
AYAZ
BA
7 12
3X4
3X4
3X4
4X4(R1)
3X6
4X6
3X4
3X4
8"4 11'6'3"12 8"4
1'4"2 1'4"(TYP)2'8"
4'8"1
4'8"1
9'4"2
4'8"1
14'0"3
4'8"1
18'8"4
4'8"1
10"
10"
9'4"2
8'6"2
11'8"4
2'4"2
17'10"4
6'2"
18'8"4
10"1'6"
1'6"1'11"97'4"15
Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.16 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046D 999 240
VERT(TL): 0.089D 999 180
HORZ(LL):-0.021D - -
HORZ(TL):-0.040D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.745
Max BC CSI: 0.448
Max Web CSI: 0.436
Mfg Specified Camber:
Job Number: T92087 Truss Label:T1
Ply: 1
Qty:1
Wgt: 43.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/43 /1 /5
Wind reactions based on MWFRS
C Brg Width = 149 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 682 -93
Chords Tens.Comp.
B - C 682 -93
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 115 -490
Chords Tens.Comp.
D - C 115 -490
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 138-1026
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
14'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
12'5"4
6'2"10
6'2"10
12'5"4
6'2"10
6'2"10
6'2"10
12'5"4
6'2"10
0"43'7"13Lumber
Top chord 2x4 SPF #1/#2Bot chord 2x4 SPF #1/#2
Webs 2x3 SPF #3
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Wind
Wind loads based on MWFRS with additional C&Cmember design.
Additional Notes
See DWG VAL160101014 for valley details.
Loading Criteria (psf)
TCLL:35.00
TCDL:10.00
BCLL: 0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.15
Spacing: 24.0 "
Wind Criteria
Speed:115 mph
TCDL: 6.0 psf EXP: CBCDL: 6.0 psf
Mean Height: 16.16 ft
Enclosure: Closed Category: II
Wind Std:ASCE 7-10
MWFRS Parallel Dist: h/2 to hC&C Dist a: 3.00 ftLoc. from endwall: not in 9.00 ft
I: 1.0 GCpi: 0.18
Wind Duration: 1.60
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046D 999 240
VERT(TL): 0.089D 999 180
HORZ(LL):-0.021D - -
HORZ(TL):-0.040D - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.745
Max BC CSI: 0.448
Max Web CSI: 0.436
Mfg Specified Camber:
Job Number: T92087 Truss Label:T1
Ply: 1
Qty:1
Wgt: 43.4 lbs Dsgnr:Derek Widiker04/23/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C*113 /-/-/43 /1 /5
Wind reactions based on MWFRS
C Brg Width = 149 Min Req =-
Bearing A Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 682 -93
Chords Tens.Comp.
B - C 682 -93
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - D 115 -490
Chords Tens.Comp.
D - C 115 -490
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 138-1026
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
14'2"5
A
B
C
D
7
12
2X4(D8R)
4X4
1.5X4
2X4(D8R)
12'5"4
6'2"10
6'2"10
12'5"4
6'2"10
6'2"10
6'2"10
12'5"4
6'2"10
0"43'7"13
(6)T14(2)T1(2)T11(2)T16(3)T17T9
T7
T12
T10
T19
T22
T18
T24
T6(2)T13(7)T8(4)T5(3)T2(2)T15 PAGE NO:
1 OF 1
JOB NO:
T92087F Name: ARONSON ACustomer: Lyman Lumber/Chan Address: 18108 JULY CIRCLESalesman: LLCDesigner: DJW
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w5 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
This truss spaced @ 19.2" oc supports additionalconcentrated loads. At left end: 10.00' stud wall (10.00
PSF) supporting 8-0-0 roof spans W/2-0-0 overhang. Atright end: 10.00' stud wall (10.00 PSF) supporting 8-0-0roof spans with 2-0-0 overhang. Roof load: 35.00 psf LLand 20.00 psf DL.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.087K 999 480
VERT(TL): 0.183K 999 240
HORZ(LL): 0.014P - -
HORZ(TL): 0.027P - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.460
Max BC CSI: 0.322
Max Web CSI: 0.478
Mfg Specified Camber:
Job Number: T92087F Truss Label:T14
Ply: 1
Qty:6
Wgt: 157.5 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1099 /-/-/-/-/-
U 1553 /-/-/-/-/-
Z 1332 /-/-/-/-/-
X Brg Width = 5.5 Min Req =1.5
U Brg Width = 3.5 Min Req =1.5
Z Brg Width = 5.5 Min Req =1.5
Bearings X, U, & Z Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 275 -744
C - D 275 -744
D - E 1044 0
E - F 1451 0
F - G 1451 0
G - H 0-1087
Chords Tens.Comp.
H - I 0 -1087
I - J 0 -1087
J - K 0 -1746
K - L 0 -1746
L - M 0 -817
M - N 0 -68
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
X - W 656 -83
W - V 407 -621
V - U 0-1089
U - T 148 -253
Chords Tens.Comp.
T - S 148 -253
S - R 1600 0
R - Q 1461 0
Q - P 781 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
X - A 0 -712
X - B 142 -661
Y - X 0 -87
B - W 111 -230
C - W 0 -187
Webs Tens.Comp.
G - S 1117 0
H - S 0 -198
S - J 0 -630
J - R 211 0
K - R 0 -196
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w5
8'1"2
A B C D E F G H I J K L M NO
PQRSTUVWX
Y
Z
1.5X4(R)
3X6
1.5X4
3X6
3X6
4X6
3X4(R)2X3
3X10
4X6
W=3X10
1.5X4
3X8
W=3X10 1.5X4
4X6
4X6 1.5X4(R)
3X8
3"10
1"8 11'0"12 16'8"4 1"8
2'5"4(TYP)2'6"2'6"2'6"12
8"4
2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
28'
11'2"4
11'2"4
28'
16'9"12
1'6"710#
27'9"
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w5 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
This truss spaced @ 19.2" oc supports additionalconcentrated loads. At left end: 10.00' stud wall (10.00
PSF) supporting 8-0-0 roof spans W/2-0-0 overhang. Atright end: 10.00' stud wall (10.00 PSF) supporting 8-0-0roof spans with 2-0-0 overhang. Roof load: 35.00 psf LLand 20.00 psf DL.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.087K 999 480
VERT(TL): 0.183K 999 240
HORZ(LL): 0.014P - -
HORZ(TL): 0.027P - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.460
Max BC CSI: 0.322
Max Web CSI: 0.478
Mfg Specified Camber:
Job Number: T92087F Truss Label:T14
Ply: 1
Qty:6
Wgt: 157.5 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1099 /-/-/-/-/-
U 1553 /-/-/-/-/-
Z 1332 /-/-/-/-/-
X Brg Width = 5.5 Min Req =1.5
U Brg Width = 3.5 Min Req =1.5
Z Brg Width = 5.5 Min Req =1.5
Bearings X, U, & Z Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 275 -744
C - D 275 -744
D - E 1044 0
E - F 1451 0
F - G 1451 0
G - H 0-1087
Chords Tens.Comp.
H - I 0 -1087
I - J 0 -1087
J - K 0 -1746
K - L 0 -1746
L - M 0 -817
M - N 0 -68
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
X - W 656 -83
W - V 407 -621
V - U 0-1089
U - T 148 -253
Chords Tens.Comp.
T - S 148 -253
S - R 1600 0
R - Q 1461 0
Q - P 781 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
X - A 0 -712
X - B 142 -661
Y - X 0 -87
B - W 111 -230
C - W 0 -187
Webs Tens.Comp.
G - S 1117 0
H - S 0 -198
S - J 0 -630
J - R 211 0
K - R 0 -196
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w5
8'1"2
A B C D E F G H I J K L M NO
PQRSTUVWX
Y
Z
1.5X4(R)
3X6
1.5X4
3X6
3X6
4X6
3X4(R)2X3
3X10
4X6
W=3X10
1.5X4
3X8
W=3X10 1.5X4
4X6
4X6 1.5X4(R)
3X8
3"10
1"8 11'0"12 16'8"4 1"8
2'5"4(TYP)2'6"2'6"2'6"12
8"4
2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
28'
11'2"4
11'2"4
28'
16'9"12
1'6"710#
27'9"
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.165E 999 480
VERT(TL): 0.302E 724 240
HORZ(LL): 0.031J - -
HORZ(TL): 0.056J - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.243
Max BC CSI: 0.509
Max Web CSI: 0.593
Mfg Specified Camber:
Job Number: T92087F Truss Label:T1
Ply: 1
Qty:2
Wgt: 114.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1495 /-/-/-/-/-
J 821 /-/-/-/-/-
N Brg Width = 5.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings N & J Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-2270
C - D 0-2270
D - E 0-2663
Chords Tens.Comp.
E - F 0 -2663
F - G 0 -1467
G - H 0 -1467
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
N - M 1463 0
M - L 2652 0
Chords Tens.Comp.
L - K 2243 0
K - J 259 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - A 0 -713
N - B 0-1553
O - N 0 -87
B - M 927 0
C - M 0 -189
M - D 0 -440
D - L 55 0
E - L 0 -198
Webs Tens.Comp.
L - F 479 0
F - K 0 -886
G - K 0 -220
K - H 1388 0
H - J 0 -664
H - J 0 -166
J - I 0 -26
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w4
8'1"2
A B C D E F G H
I
JKLMN
O1.5X4(R)
3X8
4X6 1.5X4
3X8
1.5X4
3X6
1.5X4
4X8
4X14
3X10
1.5X4(R)3"10
1"8 18'4"8
2'5"4
(TYP)
2'6"2'6"2'6"2'6"2'6"
18'6"1'6"710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.165E 999 480
VERT(TL): 0.302E 724 240
HORZ(LL): 0.031J - -
HORZ(TL): 0.056J - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.243
Max BC CSI: 0.509
Max Web CSI: 0.593
Mfg Specified Camber:
Job Number: T92087F Truss Label:T1
Ply: 1
Qty:2
Wgt: 114.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1495 /-/-/-/-/-
J 821 /-/-/-/-/-
N Brg Width = 5.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings N & J Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-2270
C - D 0-2270
D - E 0-2663
Chords Tens.Comp.
E - F 0 -2663
F - G 0 -1467
G - H 0 -1467
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
N - M 1463 0
M - L 2652 0
Chords Tens.Comp.
L - K 2243 0
K - J 259 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - A 0 -713
N - B 0-1553
O - N 0 -87
B - M 927 0
C - M 0 -189
M - D 0 -440
D - L 55 0
E - L 0 -198
Webs Tens.Comp.
L - F 479 0
F - K 0 -886
G - K 0 -220
K - H 1388 0
H - J 0 -664
H - J 0 -166
J - I 0 -26
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w4
8'1"2
A B C D E F G H
I
JKLMN
O1.5X4(R)
3X8
4X6 1.5X4
3X8
1.5X4
3X6
1.5X4
4X8
4X14
3X10
1.5X4(R)3"10
1"8 18'4"8
2'5"4
(TYP)
2'6"2'6"2'6"2'6"2'6"
18'6"1'6"710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w2, w4 4x2 SPF Stud::Lt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.12" DL: 0.21". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at right end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.125D 999 480
VERT(TL): 0.302N 664 240
HORZ(LL): 0.052J - -
HORZ(TL): 0.096A - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.386
Max BC CSI: 0.429
Max Web CSI: 0.603
Mfg Specified Camber:
Job Number: T92087F Truss Label:T16
Ply: 1
Qty:2
Wgt: 94.5 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 745 /-/-/-/-/-
P 1431 /-/-/-/-/-
O Brg Width = 1.4 Min Req =1.5
P Brg Width = 5.5 Min Req =1.5
Bearing O is a rigid surface.
Bearing P Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0-1235
B - C 0-1235
C - D 0-2282
D - E 0-2282
Chords Tens.Comp.
E - F 0 -1763
F - G 0 -1763
G - H 0 -68
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
N - M 0 0
M - L 1929 0
Chords Tens.Comp.
L - K 2204 0
K - J 883 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -479
A - M 1409 0
B - M 0 -254
M - C 0 -792
C - L 403 0
D - L 0 -201
L - E 95 0
Webs Tens.Comp.
E - K 0 -509
F - K 0 -202
K - G 1014 0
G - J 0 -1053
H - J 0 -670
I - J 0 -82
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w2
w2
w2
w2
w2 w4 8'10"6
8'1"2
A B C D E F G H
I
JKLMN
O
P
4X6 1.5X4
3X10
3X4 1.5X4
3X6
3X4 1.5X4
3X8
3X6 3X4
1.5X4(R)
3X8
3"10
16'8"2 1"8
2'6"2'6"2'6"2'6"2'6"2'6"1'3"10
3"
16'9"10
16'7"12
16'7"12
1"14
16'9"10
16'9"10
9"4
8"12
1'6"16'6"10
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w2, w4 4x2 SPF Stud::Lt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.12" DL: 0.21". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at right end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.125D 999 480
VERT(TL): 0.302N 664 240
HORZ(LL): 0.052J - -
HORZ(TL): 0.096A - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.386
Max BC CSI: 0.429
Max Web CSI: 0.603
Mfg Specified Camber:
Job Number: T92087F Truss Label:T16
Ply: 1
Qty:2
Wgt: 94.5 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 745 /-/-/-/-/-
P 1431 /-/-/-/-/-
O Brg Width = 1.4 Min Req =1.5
P Brg Width = 5.5 Min Req =1.5
Bearing O is a rigid surface.
Bearing P Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0-1235
B - C 0-1235
C - D 0-2282
D - E 0-2282
Chords Tens.Comp.
E - F 0 -1763
F - G 0 -1763
G - H 0 -68
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
N - M 0 0
M - L 1929 0
Chords Tens.Comp.
L - K 2204 0
K - J 883 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -479
A - M 1409 0
B - M 0 -254
M - C 0 -792
C - L 403 0
D - L 0 -201
L - E 95 0
Webs Tens.Comp.
E - K 0 -509
F - K 0 -202
K - G 1014 0
G - J 0 -1053
H - J 0 -670
I - J 0 -82
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w2
w2
w2
w2
w2 w4 8'10"6
8'1"2
A B C D E F G H
I
JKLMN
O
P
4X6 1.5X4
3X10
3X4 1.5X4
3X6
3X4 1.5X4
3X8
3X6 3X4
1.5X4(R)
3X8
3"10
16'8"2 1"8
2'6"2'6"2'6"2'6"2'6"2'6"1'3"10
3"
16'9"10
16'7"12
16'7"12
1"14
16'9"10
16'9"10
9"4
8"12
1'6"16'6"10
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud:
Plating Notes
All plates are 3X6 except as noted.
Loading
This truss spaced @ 19.2" oc supports additionalconcentrated loads. At left end: 10.00' stud wall (10.00
PSF) supporting 8-0-0 roof spans W/2-0-0 overhang. Atright end: 10.00' stud wall (10.00 PSF) supporting 8-0-0roof spans with 2-0-0 overhang. Roof load: 35.00 psf LLand 20.00 psf DL.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.Deflection
Max JT VERT DEFL: LL: 0.19" DL: 0.27". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.189O 999 480
VERT(TL): 0.424N 612 240
HORZ(LL): 0.028U - -
HORZ(TL): 0.050U - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.779
Max BC CSI: 0.523
Max Web CSI: 0.779
Mfg Specified Camber:
Job Number: T92087F Truss Label:T17
Ply: 1
Qty:3
Wgt: 216.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF1376 /-/-/-/-/-
AA2187 /-/-/-/-/-
AH1508 /-/-/-/-/-
AFBrg Width = 5.5 Min Req =1.5
AABrg Width = 3.5 Min Req =1.5
AHBrg Width = 5.5 Min Req =1.5
Bearings AF, AA, & AH Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-1809
C - D 0-1809
D - E 469-1768
E - F 469-1768
F - G 1396 -135
G - H 1396 -135
H - I 2961 0
I - J 2961 0
Chords Tens.Comp.
J - K 2961 0
K - L 522 -1058
L - M 522 -1058
M - N 0 -2616
N - O 0 -2616
O - P 0 -2581
P - Q 0 -2581
Q - R 0 -969
R - S 0 -67
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 1219 0
AE-AD 1974 -188
AD-AC 1132 -893
AC-AB 1132 -893
AB-AA 0-2586
AA- Z 0-1075
Chords Tens.Comp.
Z - Y 0 -1075
Y - X 2019 -145
X - W 2782 0
W - V 1950 0
V - U 915 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AF- A 0 -713
Webs Tens.Comp.
K - Y 1701 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 8'1"2
A B C D E F G HI JK L M N O P Q R ST
UVWXYZAAABACADAEAF
AG
AH
1.5X4(R)
3X8
3X4 1.5X4 3X4 1.5X4
3X8W=3X10
1.5X4
4X10
4X82X3
4X14
W=SS03124X8
W=3X10
1.5X4
4X10
1.5X4 3X4 1.5X4
4X6
4X6 3X4
1.5X4(R)
4X8
3"10
1"8 18'2"12 21'6"4 1"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"
5"
2'6"2'6"2'6"2'6"2'6"2'6"2'6"12
1'1"12
3"
40'
18'4"4
18'4"4
40'
21'7"12
1'6"
710#
39'9"
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud:
Plating Notes
All plates are 3X6 except as noted.
Loading
This truss spaced @ 19.2" oc supports additionalconcentrated loads. At left end: 10.00' stud wall (10.00
PSF) supporting 8-0-0 roof spans W/2-0-0 overhang. Atright end: 10.00' stud wall (10.00 PSF) supporting 8-0-0roof spans with 2-0-0 overhang. Roof load: 35.00 psf LLand 20.00 psf DL.
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.Deflection
Max JT VERT DEFL: LL: 0.19" DL: 0.27". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.189O 999 480
VERT(TL): 0.424N 612 240
HORZ(LL): 0.028U - -
HORZ(TL): 0.050U - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.779
Max BC CSI: 0.523
Max Web CSI: 0.779
Mfg Specified Camber:
Job Number: T92087F Truss Label:T17
Ply: 1
Qty:3
Wgt: 216.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF1376 /-/-/-/-/-
AA2187 /-/-/-/-/-
AH1508 /-/-/-/-/-
AFBrg Width = 5.5 Min Req =1.5
AABrg Width = 3.5 Min Req =1.5
AHBrg Width = 5.5 Min Req =1.5
Bearings AF, AA, & AH Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-1809
C - D 0-1809
D - E 469-1768
E - F 469-1768
F - G 1396 -135
G - H 1396 -135
H - I 2961 0
I - J 2961 0
Chords Tens.Comp.
J - K 2961 0
K - L 522 -1058
L - M 522 -1058
M - N 0 -2616
N - O 0 -2616
O - P 0 -2581
P - Q 0 -2581
Q - R 0 -969
R - S 0 -67
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 1219 0
AE-AD 1974 -188
AD-AC 1132 -893
AC-AB 1132 -893
AB-AA 0-2586
AA- Z 0-1075
Chords Tens.Comp.
Z - Y 0 -1075
Y - X 2019 -145
X - W 2782 0
W - V 1950 0
V - U 915 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AF- A 0 -713
Webs Tens.Comp.
K - Y 1701 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 8'1"2
A B C D E F G HI JK L M N O P Q R ST
UVWXYZAAABACADAEAF
AG
AH
1.5X4(R)
3X8
3X4 1.5X4 3X4 1.5X4
3X8W=3X10
1.5X4
4X10
4X82X3
4X14
W=SS03124X8
W=3X10
1.5X4
4X10
1.5X4 3X4 1.5X4
4X6
4X6 3X4
1.5X4(R)
4X8
3"10
1"8 18'2"12 21'6"4 1"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"
5"
2'6"2'6"2'6"2'6"2'6"2'6"2'6"12
1'1"12
3"
40'
18'4"4
18'4"4
40'
21'7"12
1'6"
710#
39'9"
710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004B 999 480
VERT(TL): 0.008B 999 240
HORZ(LL): 0.002H - -
HORZ(TL): 0.003H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.257
Max BC CSI: 0.235
Max Web CSI: 0.102
Mfg Specified Camber:
Job Number: T92087F Truss Label:T9
Ply: 1
Qty:1
Wgt: 72.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 888 /-/-/-/-/-
M*75 /-/-/-/-/-
K Brg Width = 5.5 Min Req =1.5
M Brg Width = 137 Min Req =-
Bearings K & K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 70 0
C - D 70 0
Chords Tens.Comp.
D - E 13 0
E - F 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 226 0
J - I 148 0
Chords Tens.Comp.
I - H 3 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - A 0 -712
K - B 0 -186
L - K 0 -87
B - J 0 -330
C - J 0 -192
J - D 0 -245
Webs Tens.Comp.
D - I 0 -184
I - E 0 -172
E - H 0 -8
F - H 0 -36
H - G 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w4
8'1"2
A B C D E F
G
HIJ
K
L
M
1X3(R)
3X6
1.5X4 2X3
3X6
1X3(R)3"10
1"8 11'10"8
2'5"4
(TYP)
2'6"2'6"2'6"12 1'3"
4"8
12'1'6"710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004B 999 480
VERT(TL): 0.008B 999 240
HORZ(LL): 0.002H - -
HORZ(TL): 0.003H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.257
Max BC CSI: 0.235
Max Web CSI: 0.102
Mfg Specified Camber:
Job Number: T92087F Truss Label:T9
Ply: 1
Qty:1
Wgt: 72.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 888 /-/-/-/-/-
M*75 /-/-/-/-/-
K Brg Width = 5.5 Min Req =1.5
M Brg Width = 137 Min Req =-
Bearings K & K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 70 0
C - D 70 0
Chords Tens.Comp.
D - E 13 0
E - F 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 226 0
J - I 148 0
Chords Tens.Comp.
I - H 3 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - A 0 -712
K - B 0 -186
L - K 0 -87
B - J 0 -330
C - J 0 -192
J - D 0 -245
Webs Tens.Comp.
D - I 0 -184
I - E 0 -172
E - H 0 -8
F - H 0 -36
H - G 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w4
8'1"2
A B C D E F
G
HIJ
K
L
M
1X3(R)
3X6
1.5X4 2X3
3X6
1X3(R)3"10
1"8 11'10"8
2'5"4
(TYP)
2'6"2'6"2'6"12 1'3"
4"8
12'1'6"710#
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.41" DL: 0.35". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Maximum panel length exceeds 30". TPI allowsnon-bearing partition walls to be supported at any pointwhen panels are 30" or less.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.417G 665 480
VERT(TL): 0.742G 373 240
HORZ(LL): 0.065B - -
HORZ(TL): 0.115B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.714
Max BC CSI: 0.790
Max Web CSI: 0.929
Mfg Specified Camber:
Job Number: T92087F Truss Label:T13
Ply: 1
Qty:2
Wgt: 124.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1712 /-/-/-/-/-
T 1024 /-/-/-/-/-
R Brg Width = 5.5 Min Req =1.5
T Brg Width = 1.4 Min Req =1.5
Bearing T is a rigid surface.
Bearing R Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -73
B - C 0-3107
C - D 0-3107
D - E 0-4287
E - F 0-4287
Chords Tens.Comp.
F - G 0 -4287
G - H 0 -3873
H - I 0 -3873
I - J 0 -1924
J - K 0 -1924
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
R - Q 1905 0
Q - P 3882 0
P - O 4261 0
Chords Tens.Comp.
O - N 4261 0
N - M 3046 0
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - A 0 -713
R - B 0-2044
S - R 0 -87
B - Q 1375 0
C - Q 0 -189
Q - D 0 -888
D - P 466 0
E - P 0 -198
P - G 64 0
Webs Tens.Comp.
G - N 0 -443
H - N 0 -207
N - I 944 0
I - M 0 -1281
J - M 0 -348
M - K 2174 0
K - T 0 -494
T - K 0 -525
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2 w2
w2
w2
w2
w2
8'1"2
8'10"6
A B C D E F G H I J K
LMNOPQR
S
T
1.5X4(R)
4X10
3X4 4X8
4X8
3X4
3X6W=SS0312
W=3X103X4
3X8
3X6
4X14
4X8
3"10
1"8 23'0"10
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"2'6"2'8"8
1"14
23'2"2
23'0"4
23'0"4
1"141'6"9"4
8"12
710#
22'10"12
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.41" DL: 0.35". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Maximum panel length exceeds 30". TPI allowsnon-bearing partition walls to be supported at any pointwhen panels are 30" or less.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.417G 665 480
VERT(TL): 0.742G 373 240
HORZ(LL): 0.065B - -
HORZ(TL): 0.115B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.714
Max BC CSI: 0.790
Max Web CSI: 0.929
Mfg Specified Camber:
Job Number: T92087F Truss Label:T13
Ply: 1
Qty:2
Wgt: 124.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1712 /-/-/-/-/-
T 1024 /-/-/-/-/-
R Brg Width = 5.5 Min Req =1.5
T Brg Width = 1.4 Min Req =1.5
Bearing T is a rigid surface.
Bearing R Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -73
B - C 0-3107
C - D 0-3107
D - E 0-4287
E - F 0-4287
Chords Tens.Comp.
F - G 0 -4287
G - H 0 -3873
H - I 0 -3873
I - J 0 -1924
J - K 0 -1924
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
R - Q 1905 0
Q - P 3882 0
P - O 4261 0
Chords Tens.Comp.
O - N 4261 0
N - M 3046 0
M - L 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - A 0 -713
R - B 0-2044
S - R 0 -87
B - Q 1375 0
C - Q 0 -189
Q - D 0 -888
D - P 466 0
E - P 0 -198
P - G 64 0
Webs Tens.Comp.
G - N 0 -443
H - N 0 -207
N - I 944 0
I - M 0 -1281
J - M 0 -348
M - K 2174 0
K - T 0 -494
T - K 0 -525
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2 w2
w2
w2
w2
w2
8'1"2
8'10"6
A B C D E F G H I J K
LMNOPQR
S
T
1.5X4(R)
4X10
3X4 4X8
4X8
3X4
3X6W=SS0312
W=3X103X4
3X8
3X6
4X14
4X8
3"10
1"8 23'0"10
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"2'6"2'8"8
1"14
23'2"2
23'0"4
23'0"4
1"141'6"9"4
8"12
710#
22'10"12
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2, w4 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.149D 999 480
VERT(TL): 0.273D 770 240
HORZ(LL): 0.028L - -
HORZ(TL): 0.050L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.368
Max BC CSI: 0.482
Max Web CSI: 0.574
Mfg Specified Camber:
Job Number: T92087F Truss Label:T8
Ply: 1
Qty:7
Wgt: 98.7 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1463 /-/-/-/-/-
I 814 /-/-/-/-/-
O Brg Width = 5.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearing I is a rigid surface.
Bearing O Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-2148
C - D 0-2148
D - E 0-2424
Chords Tens.Comp.
E - F 0 -2424
F - H 0 -1119
G - H 0 0
H - I 0 -1119
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 1398 0
N - M 2471 0
Chords Tens.Comp.
M - L 1949 0
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -713
O - B 0-1482
P - O 0 -87
B - N 862 0
C - N 0 -189
N - D 0 -374
Webs Tens.Comp.
D - M 25 -54
E - M 0 -199
M - F 542 0
F - L 0 -947
H - L 0 -250
L - I 1343 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2 w2 w2 w2 w4
8'1"2
9'4"2ABCDEFGHIJ
KLMNO
P1.5X4(R)
3X8
3X4 4X6 1.5X4
3X8
3X4 1.5X4
3X6
3X4 3X6
3X10
5X6
3"10
1"8 17'9"
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'0"4
6"8
18'
17'4"
17'4"
17'10"8
6"81"8
17'10"81'6"1'3"3"
710#
17'2"8
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2, w4 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 8-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.149D 999 480
VERT(TL): 0.273D 770 240
HORZ(LL): 0.028L - -
HORZ(TL): 0.050L - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.368
Max BC CSI: 0.482
Max Web CSI: 0.574
Mfg Specified Camber:
Job Number: T92087F Truss Label:T8
Ply: 1
Qty:7
Wgt: 98.7 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1463 /-/-/-/-/-
I 814 /-/-/-/-/-
O Brg Width = 5.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearing I is a rigid surface.
Bearing O Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -72
B - C 0-2148
C - D 0-2148
D - E 0-2424
Chords Tens.Comp.
E - F 0 -2424
F - H 0 -1119
G - H 0 0
H - I 0 -1119
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 1398 0
N - M 2471 0
Chords Tens.Comp.
M - L 1949 0
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -713
O - B 0-1482
P - O 0 -87
B - N 862 0
C - N 0 -189
N - D 0 -374
Webs Tens.Comp.
D - M 25 -54
E - M 0 -199
M - F 542 0
F - L 0 -947
H - L 0 -250
L - I 1343 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2 w2 w2 w2 w4
8'1"2
9'4"2ABCDEFGHIJ
KLMNO
P1.5X4(R)
3X8
3X4 4X6 1.5X4
3X8
3X4 1.5X4
3X6
3X4 3X6
3X10
5X6
3"10
1"8 17'9"
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'0"4
6"8
18'
17'4"
17'4"
17'10"8
6"81"8
17'10"81'6"1'3"3"
710#
17'2"8
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailed
wood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004B 999 480
VERT(TL): 0.006B 999 240
HORZ(LL):-0.001I - -
HORZ(TL):-0.002I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.194
Max BC CSI: 0.202
Max Web CSI: 0.062
Mfg Specified Camber:
Job Number: T92087F Truss Label:T7
Ply: 1
Qty:1
Wgt: 60.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G*86 /-/-/-/-/-
G Brg Width = 115 Min Req =-
Bearing I Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 2 0
B - C 25 0
Chords Tens.Comp.
C - D 25 0
D - E 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
I - H 182 0
Chords Tens.Comp.
H - G 108 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - I 0 -10
A - I 0 -91
I - B 0 -212
B - H 0 -237
C - H 0 -203
Webs Tens.Comp.
H - D 0 -152
D - G 0 -151
E - G 0 -52
G - F 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w4
8'1"2
A B C D E
F
GHI
J1X3(R)
2X3
3X6
3X4 1.5X4
3X4
3X4 2X3
3X6
1X3(R)3"10
9'8"
4"8 2'5"4
(TYP)
2'6"2'6"1'5"12
4"8
1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailed
wood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004B 999 480
VERT(TL): 0.006B 999 240
HORZ(LL):-0.001I - -
HORZ(TL):-0.002I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.194
Max BC CSI: 0.202
Max Web CSI: 0.062
Mfg Specified Camber:
Job Number: T92087F Truss Label:T7
Ply: 1
Qty:1
Wgt: 60.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G*86 /-/-/-/-/-
G Brg Width = 115 Min Req =-
Bearing I Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 2 0
B - C 25 0
Chords Tens.Comp.
C - D 25 0
D - E 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
I - H 182 0
Chords Tens.Comp.
H - G 108 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - I 0 -10
A - I 0 -91
I - B 0 -212
B - H 0 -237
C - H 0 -203
Webs Tens.Comp.
H - D 0 -152
D - G 0 -151
E - G 0 -52
G - F 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w4
8'1"2
A B C D E
F
GHI
J1X3(R)
2X3
3X6
3X4 1.5X4
3X4
3X4 2X3
3X6
1X3(R)3"10
9'8"
4"8 2'5"4
(TYP)
2'6"2'6"1'5"12
4"8
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040C 999 480
VERT(TL): 0.063C 999 240
HORZ(LL): 0.010H - -
HORZ(TL): 0.015H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.189
Max BC CSI: 0.262
Max Web CSI: 0.223
Mfg Specified Camber:
Job Number: T92087F Truss Label:T5
Ply: 1
Qty:4
Wgt: 72.4 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 523 /-/-/-/-/-
M 497 /-/-/-/-/-
K Brg Width = 3.5 Min Req =1.5
M Brg Width = 5.5 Min Req =1.5
Bearings K & M Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -4
B - C 0-1084
C - D 0-1084
Chords Tens.Comp.
D - E 0 -525
E - F 0 -3
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 749 0
J - I 989 0
Chords Tens.Comp.
I - H 499 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - K 0 -9
K - A 0 -91
K - B 0 -849
B - J 382 0
C - J 0 -191
J - D 113 0
Webs Tens.Comp.
D - I 0 -536
I - E 294 0
E - H 0 -682
F - H 0 -26
G - H 0 -3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w3
8'1"2
A B C D E F
G
HIJK
L
M
1X3(R)
3X8
2X3 3X4 1.5X4
3X4
3X4
3X4
3X4 2X3
1X3(R)
4X6
3"10
11'8"8 1"8
4"8 2'5"4
(TYP)
2'6"2'6"2'6"12 1'1"
3"
11'10"1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040C 999 480
VERT(TL): 0.063C 999 240
HORZ(LL): 0.010H - -
HORZ(TL): 0.015H - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.189
Max BC CSI: 0.262
Max Web CSI: 0.223
Mfg Specified Camber:
Job Number: T92087F Truss Label:T5
Ply: 1
Qty:4
Wgt: 72.4 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 523 /-/-/-/-/-
M 497 /-/-/-/-/-
K Brg Width = 3.5 Min Req =1.5
M Brg Width = 5.5 Min Req =1.5
Bearings K & M Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -4
B - C 0-1084
C - D 0-1084
Chords Tens.Comp.
D - E 0 -525
E - F 0 -3
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 749 0
J - I 989 0
Chords Tens.Comp.
I - H 499 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - K 0 -9
K - A 0 -91
K - B 0 -849
B - J 382 0
C - J 0 -191
J - D 113 0
Webs Tens.Comp.
D - I 0 -536
I - E 294 0
E - H 0 -682
F - H 0 -26
G - H 0 -3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w3
8'1"2
A B C D E F
G
HIJK
L
M
1X3(R)
3X8
2X3 3X4 1.5X4
3X4
3X4
3X4
3X4 2X3
1X3(R)
4X6
3"10
11'8"8 1"8
4"8 2'5"4
(TYP)
2'6"2'6"2'6"12 1'1"
3"
11'10"1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud
Bracing
Sheathing is required for any longitudinal(drag) forces.All connections to be designed by the building designer.
Fasten rated sheathing to one face of this frame.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000V 999 480
VERT(TL): 0.000V 999 240
HORZ(LL): 0.000Z - -
HORZ(TL): 0.000Z - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.039
Max BC CSI: 0.009
Max Web CSI: 0.029
Mfg Specified Camber:
Job Number: T92087F Truss Label:T12
Ply: 1
Qty:1
Wgt: 144.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AW8 /-/-/-/-/-
AV*89 /-/-/-/-/-
AWBrg Width = 5.5 Min Req =1.5
AVBrg Width = 327 Min Req =-
Bearings AW & AV Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -1
B - C 0 -1
C - D 0 -1
D - E 0 -1
E - F 0 -1
F - G 0 -1
G - H 0 -1
H - I 0 -1
I - J 0 -1
J - K 0 -1K - L 0 -1
L - M 0 -1
Chords Tens.Comp.
M - N 0 -1
N - O 0 -1
O - P 0 -1
P - Q 0 -1
Q - R 0 -1
R - S 0 -1
S - T 0 -1
T - U 0 -1
U - V 0 -1
V - W 0 -1W - X 0 -1
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AW-AV 1 0
AV-AU 1 0
AU-AT 1 0
AT-AS 1 0
AS-AR 1 0
AR-AQ 1 0
AQ-AP 1 0
AP-AO 1 0
AO-AN 1 0
AN-AM 1 0
Chords Tens.Comp.
AK-AJ 1 0
AJ-AI 1 0
AI-AH 1 0
AH-AG 1 0
AG-AF 1 0
AF-AE 1 0
AE-AD 1 0
AD-AC 1 0
AC-AB 1 0
AB-AA 1 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
8'1"2
AB C D E F G H I J K L M NO P Q R S T U V WXY
ZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAW
AX
1.5X4(R)
3X4
2X3
W=3X10
W=3X10 2X31.5X4(R)
3X4
3"10
1"8 27'9"1"8
6"8 1'4"
(TYP)
28'1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud
Bracing
Sheathing is required for any longitudinal(drag) forces.All connections to be designed by the building designer.
Fasten rated sheathing to one face of this frame.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:16(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000V 999 480
VERT(TL): 0.000V 999 240
HORZ(LL): 0.000Z - -
HORZ(TL): 0.000Z - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.039
Max BC CSI: 0.009
Max Web CSI: 0.029
Mfg Specified Camber:
Job Number: T92087F Truss Label:T12
Ply: 1
Qty:1
Wgt: 144.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AW8 /-/-/-/-/-
AV*89 /-/-/-/-/-
AWBrg Width = 5.5 Min Req =1.5
AVBrg Width = 327 Min Req =-
Bearings AW & AV Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -1
B - C 0 -1
C - D 0 -1
D - E 0 -1
E - F 0 -1
F - G 0 -1
G - H 0 -1
H - I 0 -1
I - J 0 -1
J - K 0 -1K - L 0 -1
L - M 0 -1
Chords Tens.Comp.
M - N 0 -1
N - O 0 -1
O - P 0 -1
P - Q 0 -1
Q - R 0 -1
R - S 0 -1
S - T 0 -1
T - U 0 -1
U - V 0 -1
V - W 0 -1W - X 0 -1
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AW-AV 1 0
AV-AU 1 0
AU-AT 1 0
AT-AS 1 0
AS-AR 1 0
AR-AQ 1 0
AQ-AP 1 0
AP-AO 1 0
AO-AN 1 0
AN-AM 1 0
Chords Tens.Comp.
AK-AJ 1 0
AJ-AI 1 0
AI-AH 1 0
AH-AG 1 0
AG-AF 1 0
AF-AE 1 0
AE-AD 1 0
AD-AC 1 0
AC-AB 1 0
AB-AA 1 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
8'1"2
AB C D E F G H I J K L M NO P Q R S T U V WXY
ZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAW
AX
1.5X4(R)
3X4
2X3
W=3X10
W=3X10 2X31.5X4(R)
3X4
3"10
1"8 27'9"1"8
6"8 1'4"
(TYP)
28'1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud::Rt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.194E 999 480
VERT(TL): 0.302E 728 240
HORZ(LL): 0.034K - -
HORZ(TL): 0.054K - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.256
Max BC CSI: 0.458
Max Web CSI: 0.528
Mfg Specified Camber:
Job Number: T92087F Truss Label:T2
Ply: 1
Qty:3
Wgt: 107.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 797 /-/-/-/-/-
Q 818 /-/-/-/-/-
O Brg Width = 5.5 Min Req =1.5
Q Brg Width = 3.0 Min Req =3.0
Bearing Q is a rigid surface.
Bearing O Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 0-2250
C - D 0-2250
D - E 0-2683
Chords Tens.Comp.
E - F 0 -2683
F - G 0 -1525
G - H 0 -1525
H - I 0 -162
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 1421 0
N - M 2651 0
M - L 2285 0
Chords Tens.Comp.
L - K 323 0
K - J 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -79
O - B 0-1573
P - O 0 -10
B - N 945 0
C - N 0 -189
N - D 0 -459D - M 61 0
E - M 0 -198
Webs Tens.Comp.
M - F 455 0
F - L 0 -867
G - L 0 -209
L - H 1371 0
H - K 0 -1023
K - I 1033 0Q - I 0 -234
I - Q 0 -593
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w4
8'1"2
8'11"14
A B C D E F G H I
JKLMNO
P
Q1.5X4(R)
3X8
2X3 4X6 1.5X4
3X8
3X4 1.5X4
3X6
3X4 1.5X4
3X10
4X6
3X6(R)
5X6(R)
3"10
1"8 18'4"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"5"4
3"
18'6"
18'2"8
18'2"8
3"81'6"10"12
7"4
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud::Rt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.194E 999 480
VERT(TL): 0.302E 728 240
HORZ(LL): 0.034K - -
HORZ(TL): 0.054K - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.256
Max BC CSI: 0.458
Max Web CSI: 0.528
Mfg Specified Camber:
Job Number: T92087F Truss Label:T2
Ply: 1
Qty:3
Wgt: 107.8 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 797 /-/-/-/-/-
Q 818 /-/-/-/-/-
O Brg Width = 5.5 Min Req =1.5
Q Brg Width = 3.0 Min Req =3.0
Bearing Q is a rigid surface.
Bearing O Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 0-2250
C - D 0-2250
D - E 0-2683
Chords Tens.Comp.
E - F 0 -2683
F - G 0 -1525
G - H 0 -1525
H - I 0 -162
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 1421 0
N - M 2651 0
M - L 2285 0
Chords Tens.Comp.
L - K 323 0
K - J 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - A 0 -79
O - B 0-1573
P - O 0 -10
B - N 945 0
C - N 0 -189
N - D 0 -459D - M 61 0
E - M 0 -198
Webs Tens.Comp.
M - F 455 0
F - L 0 -867
G - L 0 -209
L - H 1371 0
H - K 0 -1023
K - I 1033 0Q - I 0 -234
I - Q 0 -593
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w4
8'1"2
8'11"14
A B C D E F G H I
JKLMNO
P
Q1.5X4(R)
3X8
2X3 4X6 1.5X4
3X8
3X4 1.5X4
3X6
3X4 1.5X4
3X10
4X6
3X6(R)
5X6(R)
3"10
1"8 18'4"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"5"4
3"
18'6"
18'2"8
18'2"8
3"81'6"10"12
7"4
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w2, w4, w5 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.15" DL: 0.24". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.149E 999 480
VERT(TL): 0.338R 599 240
HORZ(LL):-0.023I - -
HORZ(TL):-0.036I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.348
Max BC CSI: 0.391
Max Web CSI: 0.548
Mfg Specified Camber:
Job Number: T92087F Truss Label:T15
Ply: 1
Qty:2
Wgt: 97.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 791 /-/-/-/-/-
I 780 /-/-/-/-/-
A Brg Width = 7.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearings A & I are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0-1257
B - C 0 0
B - D 0-1256
D - E 0-2280
E - F 0-2280
Chords Tens.Comp.
F - G 0 -1729
G - H 0 -1732
H - I 0 -438
I - J 0 0
J - L 0 -5
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
R - Q 0 0
Q - P 1943 0
P - O 2187 0
Chords Tens.Comp.
O - N 890 0
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 1424 0
B - Q 0 -250
Q - D 0 -784
D - P 384 0
E - P 0 -200
P - F 106 0
Webs Tens.Comp.
F - O 0 -523
G - O 0 -153
O - H 948 0
H - N 0 -894
N - I 901 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w2
w4
w4 w5 w5
9'4"2ABCDEFGHIJL
MNOPQR
5X6
3X6
3X10
3X4 1.5X4
3X4
3X4 1.5X4
3X8
5X6
4X6(R)
6X6
17'9"
8"2'6"2'6"2'6"2'6"2'6"2'6"1'6"8
6"8
18'
8"
8"
17'2"8
16'6"8
17'9"
6"81"81'3"3"1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w2, w4, w5 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.15" DL: 0.24". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.149E 999 480
VERT(TL): 0.338R 599 240
HORZ(LL):-0.023I - -
HORZ(TL):-0.036I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.348
Max BC CSI: 0.391
Max Web CSI: 0.548
Mfg Specified Camber:
Job Number: T92087F Truss Label:T15
Ply: 1
Qty:2
Wgt: 97.6 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 791 /-/-/-/-/-
I 780 /-/-/-/-/-
A Brg Width = 7.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearings A & I are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0-1257
B - C 0 0
B - D 0-1256
D - E 0-2280
E - F 0-2280
Chords Tens.Comp.
F - G 0 -1729
G - H 0 -1732
H - I 0 -438
I - J 0 0
J - L 0 -5
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
R - Q 0 0
Q - P 1943 0
P - O 2187 0
Chords Tens.Comp.
O - N 890 0
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 1424 0
B - Q 0 -250
Q - D 0 -784
D - P 384 0
E - P 0 -200
P - F 106 0
Webs Tens.Comp.
F - O 0 -523
G - O 0 -153
O - H 948 0
H - N 0 -894
N - I 901 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w2
w4
w4 w5 w5
9'4"2ABCDEFGHIJL
MNOPQR
5X6
3X6
3X10
3X4 1.5X4
3X4
3X4 1.5X4
3X8
5X6
4X6(R)
6X6
17'9"
8"2'6"2'6"2'6"2'6"2'6"2'6"1'6"8
6"8
18'
8"
8"
17'2"8
16'6"8
17'9"
6"81"81'3"3"1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailed
wood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002B 999 480
VERT(TL): 0.004B 999 240
HORZ(LL):-0.001F - -
HORZ(TL):-0.001F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.176
Max BC CSI: 0.165
Max Web CSI: 0.046
Mfg Specified Camber:
Job Number: T92087F Truss Label:T10
Ply: 1
Qty:1
Wgt: 37.1 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*84 /-/-/-/-/-
E Brg Width = 58.2 Min Req =-
Bearing F Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 2 0
Chords Tens.Comp.
B - C 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
F - E 148 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 0 -10
A - F 0 -93
F - B 0 -172
Webs Tens.Comp.
B - E 0 -194
C - E 0 -54
E - D 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w4
8'1"2
A B C
D
EF
G1X3(R)
2X3
3X6
3X4 2X3
3X6
1X3(R)3"10
4'10"4
4"8 2'5"4 1'8"4"8
1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailed
wood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002B 999 480
VERT(TL): 0.004B 999 240
HORZ(LL):-0.001F - -
HORZ(TL):-0.001F - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.176
Max BC CSI: 0.165
Max Web CSI: 0.046
Mfg Specified Camber:
Job Number: T92087F Truss Label:T10
Ply: 1
Qty:1
Wgt: 37.1 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*84 /-/-/-/-/-
E Brg Width = 58.2 Min Req =-
Bearing F Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 2 0
Chords Tens.Comp.
B - C 2 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
F - E 148 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 0 -10
A - F 0 -93
F - B 0 -172
Webs Tens.Comp.
B - E 0 -194
C - E 0 -54
E - D 0 -9
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w4
8'1"2
A B C
D
EF
G1X3(R)
2X3
3X6
3X4 2X3
3X6
1X3(R)3"10
4'10"4
4"8 2'5"4 1'8"4"8
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Deflection
Max JT VERT DEFL: LL: 0.28" DL: 0.25". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.282E 985 480
VERT(TL): 0.514E 539 240
HORZ(LL): 0.046B - -
HORZ(TL): 0.083B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.768
Max BC CSI: 0.508
Max Web CSI: 0.888
Mfg Specified Camber:
Job Number: T92087F Truss Label:T22
Ply: 1
Qty:1
Wgt: 219.4 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF857 /-/-/-/-/-
Y 2202 /-/-/-/-/-
AH582 /-4 /-/-/-/-
AFBrg Width = 5.5 Min Req =1.5
Y Brg Width = 3.5 Min Req =1.5
AHBrg Width = 5.5 Min Req =1.5
Bearings AF, Y, & AH Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 0-2482
C - D 0-2482
D - E 0-3133
E - F 0-3133
F - G 0-2196
G - H 0-2196
H - I 0-2196
I - J 903 0
Chords Tens.Comp.
J - K 903 0
K - L 3075 0
L - M 1204 -923
M - N 1204 -923
N - O 1204 -923
O - P 391 -1621
P - Q 391 -1621
Q - R 21 -729
R - S 0 -4
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 1544 0
AE-AD 2993 0
AD-AC 2848 0
AC-AB 2848 0
AB-AA 1107 -319
AA- Z 0-2957
Chords Tens.Comp.
Z - Y 0 -2957
Y - X 0 -1797
X - W 1456 -762
W - V 1356 -165
V - U 694 -16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AF- A 0 -79
Webs Tens.Comp.
K - Y 0 -326
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w4 8'1"2
A B C D E F GH I J K L M NO P Q R ST
UVWXYZAAABACADAEAF
AG
AH
1.5X4(R)
3X8
2X3
4X6 1.5X4
3X8
1.5X4
W=SS0312
1.5X4
3X10
W=3X10
4X6 1.5X4
4X14W=3X10
4X14
3X10
3X10 1.5X4
3X10
W=3X10
1.5X4
3X6
2X3
1.5X4(R)
3X6
3"10
1"8 23'0"12 16'8"4 1"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"2'6"2'8"4 2'9"2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
40'
23'0"12
23'0"12
40'
16'11"4
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w4 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Deflection
Max JT VERT DEFL: LL: 0.28" DL: 0.25". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.282E 985 480
VERT(TL): 0.514E 539 240
HORZ(LL): 0.046B - -
HORZ(TL): 0.083B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.768
Max BC CSI: 0.508
Max Web CSI: 0.888
Mfg Specified Camber:
Job Number: T92087F Truss Label:T22
Ply: 1
Qty:1
Wgt: 219.4 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF857 /-/-/-/-/-
Y 2202 /-/-/-/-/-
AH582 /-4 /-/-/-/-
AFBrg Width = 5.5 Min Req =1.5
Y Brg Width = 3.5 Min Req =1.5
AHBrg Width = 5.5 Min Req =1.5
Bearings AF, Y, & AH Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 0-2482
C - D 0-2482
D - E 0-3133
E - F 0-3133
F - G 0-2196
G - H 0-2196
H - I 0-2196
I - J 903 0
Chords Tens.Comp.
J - K 903 0
K - L 3075 0
L - M 1204 -923
M - N 1204 -923
N - O 1204 -923
O - P 391 -1621
P - Q 391 -1621
Q - R 21 -729
R - S 0 -4
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AF-AE 1544 0
AE-AD 2993 0
AD-AC 2848 0
AC-AB 2848 0
AB-AA 1107 -319
AA- Z 0-2957
Chords Tens.Comp.
Z - Y 0 -2957
Y - X 0 -1797
X - W 1456 -762
W - V 1356 -165
V - U 694 -16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AF- A 0 -79
Webs Tens.Comp.
K - Y 0 -326
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w3 w4 8'1"2
A B C D E F GH I J K L M NO P Q R ST
UVWXYZAAABACADAEAF
AG
AH
1.5X4(R)
3X8
2X3
4X6 1.5X4
3X8
1.5X4
W=SS0312
1.5X4
3X10
W=3X10
4X6 1.5X4
4X14W=3X10
4X14
3X10
3X10 1.5X4
3X10
W=3X10
1.5X4
3X6
2X3
1.5X4(R)
3X6
3"10
1"8 23'0"12 16'8"4 1"8
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"2'6"2'8"4 2'9"2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
40'
23'0"12
23'0"12
40'
16'11"4
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w4, w6 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.034F 999 480
VERT(TL):-0.075K 999 240
HORZ(LL):-0.006O - -
HORZ(TL):-0.009O - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.176
Max BC CSI: 0.197
Max Web CSI: 0.338
Mfg Specified Camber:
Job Number: T92087F Truss Label:T18
Ply: 1
Qty:1
Wgt: 69.3 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 527 /-/-/-/-/-
I 516 /-/-/-/-/-
A Brg Width = 7.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearings A & I are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
B - C 0 -446
C - D 0 -446
D - E 0 -936
E - F 0 -930
Chords Tens.Comp.
F - G 0 -930
G - H 0 -469
H - I 0 -477
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 0 0
N - M 569 0
Chords Tens.Comp.
M - L 891 0
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 671 0
C - N 0 -158
N - D 0 -346
D - M 408 0
F - M 0 -176
Webs Tens.Comp.
M - G 82 0
G - L 0 -482
L - H 0 -225
L - I 683 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w4
w6
w6
9'4"2
A B C D E F G H I J
KLMNO
5X6 3X6
4X6
3X6(R)3X4 1.5X4
3X4
3X4
4X6
3X4 6X6
11'9"
8"
1'2"8
6"2'6"2'6"2'6"12 1'3"4
6"8
12'
8"
8"
11'2"8
10'6"8
11'9"
6"81"8 1"81'3"3"1'6"Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w4, w6 4x2 DF-L Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.034F 999 480
VERT(TL):-0.075K 999 240
HORZ(LL):-0.006O - -
HORZ(TL):-0.009O - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.176
Max BC CSI: 0.197
Max Web CSI: 0.338
Mfg Specified Camber:
Job Number: T92087F Truss Label:T18
Ply: 1
Qty:1
Wgt: 69.3 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 527 /-/-/-/-/-
I 516 /-/-/-/-/-
A Brg Width = 7.5 Min Req =1.5
I Brg Width = 6.0 Min Req =1.5
Bearings A & I are a rigid surface.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
B - C 0 -446
C - D 0 -446
D - E 0 -936
E - F 0 -930
Chords Tens.Comp.
F - G 0 -930
G - H 0 -469
H - I 0 -477
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
O - N 0 0
N - M 569 0
Chords Tens.Comp.
M - L 891 0
L - K 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 671 0
C - N 0 -158
N - D 0 -346
D - M 408 0
F - M 0 -176
Webs Tens.Comp.
M - G 82 0
G - L 0 -482
L - H 0 -225
L - I 683 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w4
w6
w6
9'4"2
A B C D E F G H I J
KLMNO
5X6 3X6
4X6
3X6(R)3X4 1.5X4
3X4
3X4
4X6
3X4 6X6
11'9"
8"
1'2"8
6"2'6"2'6"2'6"12 1'3"4
6"8
12'
8"
8"
11'2"8
10'6"8
11'9"
6"81"8 1"81'3"3"1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w5, w6 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.097P 999 480
VERT(TL): 0.175O 999 240
HORZ(LL): 0.015U - -
HORZ(TL): 0.024U - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.403
Max BC CSI: 0.285
Max Web CSI: 0.425
Mfg Specified Camber:
Job Number: T92087F Truss Label:T24
Ply: 1
Qty:1
Wgt: 221.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AG186 /-/-/-/-/-
AI*113 /-/-/-/-/-
Y 1509 /-/-/-/-/-
AJ607 /-/-/-/-/-
AGBrg Width = 5.5 Min Req =1.5
AI Brg Width = 138 Min Req =-
Y Brg Width = 3.5 Min Req =1.5
AJBrg Width = 5.5 Min Req =1.5
Bearings AG, AI, Y, & AJ Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 116 0
C - D 157 0
D - E 157 0
E - F 421 -16
F - G 421 -16G - H 211 -562
H - I 211 -562
I - J 870 0
Chords Tens.Comp.
J - K 870 0
K - L 1438 0
L - M 1438 0
M - N 0 -1077
N - O 0 -1077
O - P 0 -1709P - Q 0 -1709
Q - R 0 -753
R - S 0 -4
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AG-AF 180 0
AF-AE 0 -111
AE-AD 40 -102
AD-AC 250 -60
AC-AB 250 -60
AB-AA 449 -504
Chords Tens.Comp.
AA- Z 0 -890
Z - Y 0 -890
Y - X 149 -247
X - W 1576 0
W - V 1411 0
V - U 716 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w5 w3 w3 w3 w3 w3 w3 w6 8'1"2
A B C D E F G H I J K L M N O P Q R ST
UVWXYZAAABACADAEAFAG
AH
AI AJ
1.5X4(R)
3X6
2X3
2X3
3X6
1.5X4
3X6W=3X10
1.5X4 W=3X10
W=3X10
2X3
3X10
3X6 1.5X4
3X8
1.5X4 2X3
1.5X4(R)
4X6
3"10
1"85"8 11'6"8 11'0"12 16'8"4 1"8
2'5"4(TYP)
2'6"12
10"4
2'6"2'6"2'6"2'6"2'6"12
1'7"
2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
40'
6'4"4
6'4"4
23'2"4
16'10"
40'
16'9"12
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3, w5, w6 4x2 DF-L Stud:
Plating Notes
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section
301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.097P 999 480
VERT(TL): 0.175O 999 240
HORZ(LL): 0.015U - -
HORZ(TL): 0.024U - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.403
Max BC CSI: 0.285
Max Web CSI: 0.425
Mfg Specified Camber:
Job Number: T92087F Truss Label:T24
Ply: 1
Qty:1
Wgt: 221.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AG186 /-/-/-/-/-
AI*113 /-/-/-/-/-
Y 1509 /-/-/-/-/-
AJ607 /-/-/-/-/-
AGBrg Width = 5.5 Min Req =1.5
AI Brg Width = 138 Min Req =-
Y Brg Width = 3.5 Min Req =1.5
AJBrg Width = 5.5 Min Req =1.5
Bearings AG, AI, Y, & AJ Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -8
B - C 116 0
C - D 157 0
D - E 157 0
E - F 421 -16
F - G 421 -16G - H 211 -562
H - I 211 -562
I - J 870 0
Chords Tens.Comp.
J - K 870 0
K - L 1438 0
L - M 1438 0
M - N 0 -1077
N - O 0 -1077
O - P 0 -1709P - Q 0 -1709
Q - R 0 -753
R - S 0 -4
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AG-AF 180 0
AF-AE 0 -111
AE-AD 40 -102
AD-AC 250 -60
AC-AB 250 -60
AB-AA 449 -504
Chords Tens.Comp.
AA- Z 0 -890
Z - Y 0 -890
Y - X 149 -247
X - W 1576 0
W - V 1411 0
V - U 716 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3 w3 w3 w3 w3 w3 w3 w3 w5 w3 w3 w3 w3 w3 w3 w6 8'1"2
A B C D E F G H I J K L M N O P Q R ST
UVWXYZAAABACADAEAFAG
AH
AI AJ
1.5X4(R)
3X6
2X3
2X3
3X6
1.5X4
3X6W=3X10
1.5X4 W=3X10
W=3X10
2X3
3X10
3X6 1.5X4
3X8
1.5X4 2X3
1.5X4(R)
4X6
3"10
1"85"8 11'6"8 11'0"12 16'8"4 1"8
2'5"4(TYP)
2'6"12
10"4
2'6"2'6"2'6"2'6"2'6"12
1'7"
2'6"2'6"2'6"2'6"2'6"12
1'3"12
3"
40'
6'4"4
6'4"4
23'2"4
16'10"
40'
16'9"12
1'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6E :TC2 4x2 DF-L 2400f-2.0E:
Bot chord 4x2 DF-L 1800f-1.6E :BC2 4x2 DF-L 2400f-2.0E:Webs 4x2 DF-L Stud :w1, w2, w5 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Special Loads
------(Lumber Dur.Fac.=0.90 / Plate Dur.Fac.=0.90) TC: From 40 plf at 0.13 to 40 plf at 23.18
BC: From 4 plf at 0.00 to 4 plf at 23.02 TC: 356 lb Conc. Load at 0.13 BC: 613 lb Conc. Load at 18.42,18.58
Plating Notes
All plates are 3X6 except as noted.
Deflection
Max JT VERT DEFL: LL: 0.38" DL: 0.27". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Maximum panel length exceeds 30". TPI allowsnon-bearing partition walls to be supported at any pointwhen panels are 30" or less.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 9.6 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: No
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.388G 715 480
VERT(TL): 0.647G 428 240
HORZ(LL): 0.057B - -
HORZ(TL): 0.096B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.552
Max BC CSI: 0.851
Max Web CSI: 0.756
Mfg Specified Camber:
Job Number: T92087F Truss Label:T6
Ply: 1
Qty:1
Wgt: 150.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 1104 /-/-/-/-/-
W 1495 /-/-/-/-/-
U Brg Width = 5.5 Min Req =1.5
W Brg Width = 1.4 Min Req =1.5
Bearing W is a rigid surface.
Bearing U Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -36
B - C 0-2503
C - D 0-2503
D - E 0-3982
E - F 0-3982
F - G 0-3982
Chords Tens.Comp.
G - H 0 -5146
H - I 0 -5143
I - J 0 -5001
J - K 0 -3163
K - L 0 -3163
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
U - T 1455 0
T - S 3334 0
S - R 4519 0
R - Q 4519 0
Chords Tens.Comp.
Q - P 4993 0
P - O 5001 0
O - N 4946 0
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - A 0 -358
U - B 0-1581
V - U 0 -44
B - T 1198 0
C - T 0 -95
T - D 0 -951
D - S 741 0
Webs Tens.Comp.
H - Q 0 -281
Q - I 164 -179
I - P 304 0
O - J 1117 0
J - N 0 -2288
K - N 0 -217
N - L 3537 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
BC2
w1w2 w2 w2 w2 w5 w5 w5 w5
8'1"2
8'10"6
A B C D E F G H I J K L
MNOPQRSTU
V
W
1.5X4(R)
3X8
2X3 3X8 1.5X4
3X10
1.5X4
W=SS0312
W=3X10 5X8
5X6
3X6(R)
3X8
6X6(R)
7X16
6X12
3"10
1"8 23'0"10
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'9"12 1'6"10 1"14
23'2"2
23'0"4
23'0"4
1"14
18'3"
18'3"
18'9"
6"
20'5"14
1'8"1420'9"13
3"15
23'2"2
2'4"5
1'6"9"4
8"12
1"8
356#
18'5"
613#
2"
613#
22'10"12
4'5"4
Lumber
Top chord 4x2 DF-L 1800f-1.6E :TC2 4x2 DF-L 2400f-2.0E:
Bot chord 4x2 DF-L 1800f-1.6E :BC2 4x2 DF-L 2400f-2.0E:Webs 4x2 DF-L Stud :w1, w2, w5 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Special Loads
------(Lumber Dur.Fac.=0.90 / Plate Dur.Fac.=0.90) TC: From 40 plf at 0.13 to 40 plf at 23.18
BC: From 4 plf at 0.00 to 4 plf at 23.02 TC: 356 lb Conc. Load at 0.13 BC: 613 lb Conc. Load at 18.42,18.58
Plating Notes
All plates are 3X6 except as noted.
Deflection
Max JT VERT DEFL: LL: 0.38" DL: 0.27". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Maximum panel length exceeds 30". TPI allowsnon-bearing partition walls to be supported at any pointwhen panels are 30" or less.
Truss must be installed as shown with top chord up.
++ Anchorage req'd to prevent truss from slipping offbearing.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 9.6 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: No
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.388G 715 480
VERT(TL): 0.647G 428 240
HORZ(LL): 0.057B - -
HORZ(TL): 0.096B - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.552
Max BC CSI: 0.851
Max Web CSI: 0.756
Mfg Specified Camber:
Job Number: T92087F Truss Label:T6
Ply: 1
Qty:1
Wgt: 150.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 1104 /-/-/-/-/-
W 1495 /-/-/-/-/-
U Brg Width = 5.5 Min Req =1.5
W Brg Width = 1.4 Min Req =1.5
Bearing W is a rigid surface.
Bearing U Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -36
B - C 0-2503
C - D 0-2503
D - E 0-3982
E - F 0-3982
F - G 0-3982
Chords Tens.Comp.
G - H 0 -5146
H - I 0 -5143
I - J 0 -5001
J - K 0 -3163
K - L 0 -3163
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
U - T 1455 0
T - S 3334 0
S - R 4519 0
R - Q 4519 0
Chords Tens.Comp.
Q - P 4993 0
P - O 5001 0
O - N 4946 0
N - M 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - A 0 -358
U - B 0-1581
V - U 0 -44
B - T 1198 0
C - T 0 -95
T - D 0 -951
D - S 741 0
Webs Tens.Comp.
H - Q 0 -281
Q - I 164 -179
I - P 304 0
O - J 1117 0
J - N 0 -2288
K - N 0 -217
N - L 3537 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
TC2
BC2
w1w2 w2 w2 w2 w5 w5 w5 w5
8'1"2
8'10"6
A B C D E F G H I J K L
MNOPQRSTU
V
W
1.5X4(R)
3X8
2X3 3X8 1.5X4
3X10
1.5X4
W=SS0312
W=3X10 5X8
5X6
3X6(R)
3X8
6X6(R)
7X16
6X12
3"10
1"8 23'0"10
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'9"12 1'6"10 1"14
23'2"2
23'0"4
23'0"4
1"14
18'3"
18'3"
18'9"
6"
20'5"14
1'8"1420'9"13
3"15
23'2"2
2'4"5
1'6"9"4
8"12
1"8
356#
18'5"
613#
2"
613#
22'10"12
4'5"4
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2, w4, w5 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Plating Notes
All plates are 3X6 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.19" DL: 0.26". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 27-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.187N 999 480
VERT(TL): 0.406N 631 240
HORZ(LL): 0.027V - -
HORZ(TL): 0.047V - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.770
Max BC CSI: 0.502
Max Web CSI: 0.781
Mfg Specified Camber:
Job Number: T92087F Truss Label:T11
Ply: 1
Qty:2
Wgt: 212.1 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AE2191 /-/-/-/-/-
AA2173 /-/-/-/-/-
AG824 /-/-/-/-/-
AEBrg Width = 5.5 Min Req =1.5
AABrg Width = 3.5 Min Req =1.5
AGBrg Width = 3.0 Min Req =3.0
Bearing AG is a rigid surface.
Bearings AE & AA Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -147
B - C 0-1865
C - D 0-1865
D - E 428-1807
E - F 428-1807
F - G 1343 -152
G - H 1343 -152H - I 2915 0
I - J 2915 0
J - K 2915 0
Chords Tens.Comp.
K - L 538 -1052
L - M 538 -1052
M - N 0 -2545
N - O 0 -2545
O - P 0 -2445
P - Q 0 -2445
Q - R 0 -744R - S 0 -744
S - T 0 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AE-AD 1284 0
AD-AC 2021 -151
AC-AB 1162 -848
AB-AA 0-2539
AA- Z 0-1060
Chords Tens.Comp.
Z - Y 0 -1060
Y - X 1981 -170
X - W 2678 0
W - V 1775 0
V - U 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2
w2
w2 w2 w2 w4
w2
w2
w2 w2 w2 w2
w5 8'1"2
8'10"6
A B C D E F G HI J K L M N O P Q R ST
UVWXYZAAABACADAE
AF
AG
1.5X4(R)
3X8
6X6 1.5X4 3X4 1.5X4
3X8
1.5X4
4X10
4X82X3
4X14W=3X10
W=SS03124X8 1.5X4
4X10
1.5X4 3X4 1.5X4 1.5X4
5X8
5X6
3"10
1"8 18'2"12 21'6"4
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"
5"
2'6"2'6"2'6"2'6"2'6"2'6"2'6"
1'2"8
3"
40'
39'10"8
39'10"8
1"8
18'4"4
18'4"4
39'10"8
21'6"4
1'6"9"4
8"12
1530#
39'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 DF-L Stud :w1, w2, w4, w5 4x2 SPF Stud::Rt Bearing Leg 4x2 SPF Stud:
Plating Notes
All plates are 3X6 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section301.5.
Deflection
Max JT VERT DEFL: LL: 0.19" DL: 0.26". See detailDEFLCAMB1014 for camber recommendations.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
This truss spaced @ 19.2" oc supports additionalconcentrated load at left end from 10.00' stud wall(10.00 PSF) supporting 27-0-0 roof spans with 2-0-0overhang. Roof load: 35.00 psf LL and 20.00 psf DL.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE, 18SS
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.187N 999 480
VERT(TL): 0.406N 631 240
HORZ(LL): 0.027V - -
HORZ(TL): 0.047V - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.770
Max BC CSI: 0.502
Max Web CSI: 0.781
Mfg Specified Camber:
Job Number: T92087F Truss Label:T11
Ply: 1
Qty:2
Wgt: 212.1 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AE2191 /-/-/-/-/-
AA2173 /-/-/-/-/-
AG824 /-/-/-/-/-
AEBrg Width = 5.5 Min Req =1.5
AABrg Width = 3.5 Min Req =1.5
AGBrg Width = 3.0 Min Req =3.0
Bearing AG is a rigid surface.
Bearings AE & AA Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -147
B - C 0-1865
C - D 0-1865
D - E 428-1807
E - F 428-1807
F - G 1343 -152
G - H 1343 -152H - I 2915 0
I - J 2915 0
J - K 2915 0
Chords Tens.Comp.
K - L 538 -1052
L - M 538 -1052
M - N 0 -2545
N - O 0 -2545
O - P 0 -2445
P - Q 0 -2445
Q - R 0 -744R - S 0 -744
S - T 0 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
AE-AD 1284 0
AD-AC 2021 -151
AC-AB 1162 -848
AB-AA 0-2539
AA- Z 0-1060
Chords Tens.Comp.
Z - Y 0 -1060
Y - X 1981 -170
X - W 2678 0
W - V 1775 0
V - U 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.Webs Tens.Comp.
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w1w2
w2
w2 w2 w2 w4
w2
w2
w2 w2 w2 w2
w5 8'1"2
8'10"6
A B C D E F G HI J K L M N O P Q R ST
UVWXYZAAABACADAE
AF
AG
1.5X4(R)
3X8
6X6 1.5X4 3X4 1.5X4
3X8
1.5X4
4X10
4X82X3
4X14W=3X10
W=SS03124X8 1.5X4
4X10
1.5X4 3X4 1.5X4 1.5X4
5X8
5X6
3"10
1"8 18'2"12 21'6"4
2'5"4(TYP)2'6"2'6"2'6"2'6"2'6"2'6"
5"
2'6"2'6"2'6"2'6"2'6"2'6"2'6"
1'2"8
3"
40'
39'10"8
39'10"8
1"8
18'4"4
18'4"4
39'10"8
21'6"4
1'6"9"4
8"12
1530#
39'6"
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud::Rt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.039C 999 480
VERT(TL): 0.061C 999 240
HORZ(LL): 0.009I - -
HORZ(TL): 0.013I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.188
Max BC CSI: 0.273
Max Web CSI: 0.331
Mfg Specified Camber:
Job Number: T92087F Truss Label:T19
Ply: 1
Qty:1
Wgt: 67.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 511 /-/-/-/-/-
M 516 /-/-/-/-/-
K Brg Width = 3.5 Min Req =1.5
M Brg Width = 3.0 Min Req =3.0
Bearing M is a rigid surface.
Bearing K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -4
B - C 0-1041
C - D 0-1041
Chords Tens.Comp.
D - E 0 -428
E - F 0 -428
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 727 0
J - I 920 0
Chords Tens.Comp.
I - H 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - K 0 -9
K - A 0 -91
K - B 0 -824
B - J 358 0
C - J 0 -192
J - D 138 0
Webs Tens.Comp.
D - I 0 -561
E - I 0 -218
I - F 669 0
M - F 0 -158
F - M 0 -363
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w3
8'1"2
8'10"6
A B C D E FG
HIJK
L
M
1X3(R)
3X8
2X3 3X4 1.5X4
3X4
3X4 1.5X4
4X6
4X6
3"10
11'8"8
4"8 2'5"4
(TYP)
2'6"2'6"2'6"1'1"12
3"
11'10"
1"81'6"9"4
8"12
Lumber
Top chord 4x2 DF-L 1800f-1.6EBot chord 4x2 DF-L 1800f-1.6E
Webs 4x2 SPF Stud :w3 4x2 DF-L Stud::Rt Bearing Leg 4x2 SPF Stud:
Loading
Bottom chord checked for 10.00 psf non-concurrentbottom chord live load applied per IRC-12 section301.5.
Additional Notes
See detail STRBRIBR1014 for bracing and bridgingrecommendations.
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:10.00
BCLL: 0.00
BCDL: 5.00
Des Ld:55.00
NCBCLL:10.00 Soffit: 0.00
Load Duration: 1.00
Spacing: 19.2 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NABCDL: NA psf
Mean Height: NA ft
Enclosure: NA Category: NA
Wind Std:NA
MWFRS Parallel Dist: NAC&C Dist a: NA ftLoc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:IRC 2012
TPI Std:2007
Rep Factors Used: Yes
FT/RT:6(0)/10(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.039C 999 480
VERT(TL): 0.061C 999 240
HORZ(LL): 0.009I - -
HORZ(TL): 0.013I - -
VIEW Ver: 18.02.00A.1126.20
Creep Factor: 1.5
Max TC CSI: 0.188
Max BC CSI: 0.273
Max Web CSI: 0.331
Mfg Specified Camber:
Job Number: T92087F Truss Label:T19
Ply: 1
Qty:1
Wgt: 67.9 lbs Dsgnr:Derek Widiker04/22/2019
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 511 /-/-/-/-/-
M 516 /-/-/-/-/-
K Brg Width = 3.5 Min Req =1.5
M Brg Width = 3.0 Min Req =3.0
Bearing M is a rigid surface.
Bearing K Fcperp = 425psi.
Maximum Top Chord Forces Per Ply (lbs)
ChordsTens.Comp.
A - B 0 -4
B - C 0-1041
C - D 0-1041
Chords Tens.Comp.
D - E 0 -428
E - F 0 -428
F - G 0 0
Maximum Bot Chord Forces Per Ply (lbs)
ChordsTens.Comp.
K - J 727 0
J - I 920 0
Chords Tens.Comp.
I - H 0 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - K 0 -9
K - A 0 -91
K - B 0 -824
B - J 358 0
C - J 0 -192
J - D 138 0
Webs Tens.Comp.
D - I 0 -561
E - I 0 -218
I - F 669 0
M - F 0 -158
F - M 0 -363
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
w3
w3
w3
w3
8'1"2
8'10"6
A B C D E FG
HIJK
L
M
1X3(R)
3X8
2X3 3X4 1.5X4
3X4
3X4 1.5X4
4X6
4X6
3"10
11'8"8
4"8 2'5"4
(TYP)
2'6"2'6"2'6"1'1"12
3"
11'10"
1"81'6"9"4
8"12
1
Ventilation, Makeup and Combustion Air
Calculations Submittal Form For New
Dwellings
Site address Date
Contractor Completed By
Section A
Ventilation Quantity
(Determine quantity by using Table N1104.2 or Equation 11‐1)
Square feet (Conditioned area including basement –
finished or unfinished)
Number of bedrooms
Total required ventilation
Continuous ventilation
Directions ‐ Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11‐1.
The table and equation are below.
Table N1104.2
Total and Continuous Ventilation Rates (in cfm)
Number of Bedrooms
1 2 3 4 5 6
Conditioned space
(in sq. ft.)
Total/
continuous
Total/
continuous
Total/
continuous
Total/
continuous
Total/
continuous
Total/
continuous
1000‐1500 60/40 75/40 90/45 105/53 120/60 135/68
1501‐2000 70/40 85/43 100/50 115/58 130/65 145/73
2001‐2500 80/40 95/48 110/55 125/63 140/70 155/78
2501‐3000 90/45 105/53 120/60 135/68 150/75 165/83
3001‐3500 100/50 115/58 130/65 145/73 160/80 175/88
3501‐4000 110/55 125/63 140/70 155/78 170/85 185/93
4001‐4500 120/60 135/68 150/75 165/83 180/90 195/98
4501‐5000 130/65 145/73 160/80 175/88 190/95 205/103
5001‐5500 140/70 155/78 170/85 185/93 200/100 215/108
5501‐6000 150/75 165/83 180/90 195/98 210/105 225/113
Equation 11‐1
(0.02 x square feet of conditioned space) + [15 x (number of bedrooms + 1)] = Total ventilation rate (cfm)
Total ventilation – The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate
average, for each one‐hour period according to the above table or equation. For heat recovery ventilators (HRV) and
energy recovery ventila‐ tors (ERV) the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor air intake, or both, for defrost or other equipment cycling.
Continuous ventilation ‐ A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided,
on a con‐ tinuous rate average for each one‐hour period. The portion of the mechanical ventilation system intended to be
continuous may have automatic cycling controls providing the average flow rate for each hour is met.
16411 ABERDEEN ST NE,HAM LAKE, MN 55304
2
Section B
Ventilation Method
(Choose either balanced or exhaust) Balanced, HRV (Heat Recovery Ventilator) or ERV (Energy
Recov‐ ery Ventilator) – cfm of unit in low must not exceed
continuous venti‐ lation rating by more than 100%.
Exhaust only (Continuous fan rating in cfm)
Low cfm: High cfm: Continuous fan rating in cfm (capacity must not exceed continuous ventilation rating by more than 100%)
Directions ‐ Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or
ERV’s. Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous ventilation rate and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation
fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. Section C
Ventilation Fan
Description Location Continuous Intermittent
Directions ‐ The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for
continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the low cfm air rating and less than 100% greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the
continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a percentage of each hour.
Section D
Ventilation Controls
Directions ‐ Describe operation and control of the continuous and intermittent ventilation. There should be adequate detail for plan
reviewers and inspectors to verify design and installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any controls, indicators and legends. If an ERV or HRV is to be installed, describe how it will be installed. If it will be connected and interfaced
with the air handling equipment, please describe such connections as detailed in the manufactures’ installation instructions. If the installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such interconnection shall be made and described.
3
Section E
Make‐up air
Passive (determined from calculations from Table 501.3.1)
Powered (determined from calculations from Table 501.3.1)
Interlocked with exhaust device (determined from calculation from Table 501.3.1)
Other, describe:
Location of duct or system ventilation make‐up air: Determined from make‐up air opening table
Cfm Size and type (round, rectangular, flex or rigid)
Directions ‐ In order to determine the makeup air, Table 501.3.1 must be filled out (see below). For most new installations, column A will be appropriate, however, if atmospherically vented appliances or solid fuel appliances are
installed, use the appropriate column. For existing dwellings, see IMC 501.3.3. Please note, if the makeup air quantity
is negative, no additional makeup air will be re‐ quired for ventilation, if the value is positive refer to Table 501.3.2 and
size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D.
The make‐up air supply must be installed per IMC 501.3.2.3.
Table 501.3.1
PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST EQUIPMENT IN DWELLINGS (Additional combustion air will be required for combustion appliances, see KAIR method for calculations)
One or multiple power vent or direct vent appliances or no combustion appliances Column A
One or multiple fan‐ assisted appliances and power vent or direct vent appliances Column B
One atmospherically vent gas or oil appliance or one solid fuel appliance Column C
Multiple atmospherically vented gas or oil appliances
or solid fuel appliances Column D 1. a) pressure factor (cfm/sf) 0.15 0.09 0.06 0.03
b) conditioned floor area (sf) (including unfinished basements)
Estimated House Infiltration (cfm): [1a x 1b]
2. Exhaust Capacity a) continuous exhaust‐only ventilation system (cfm); (not applicable to balanced ventilation systems such as HRV)
b) clothes dryer (cfm) 135 135 135 135
c) 80% of largest exhaust rating (cfm); Kitchen hood typically (not applicable if recirculating system or if powered makeup air is electrically interlocked and match to exhaust)
d) 80% of next largest exhaust rating (cfm); bath fan typically (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust)
Not
Applicable
Total Exhaust Capacity (cfm);
[2a + 2b +2c + 2d]
3. Makeup Air Quantity (cfm) a) total exhaust capacity (from above)
b) estimated house infiltration (from above)
Makeup Air Quantity (cfm); [3a – 3b] (if value is negative, no makeup air is needed)
4. For makeup Air Opening Sizing,
refer to Table 501.4.2
A. Use this column if there are other than fan‐assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances. (Power
vent and direct vent appliances may be used.)
B. Use this column if there is one fan‐assisted appliance per venting system. (Appliances other than atmospherically vented appliances may be included.) C. Use this column if there is one atmospherically vented (other than fan‐assisted) gas or oil appliance per venting system or one solid fuel appliance.
D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances.
4
Makeup Air Opening Table for New and Existing Dwelling Table 501.3.2
One or multiple power vent, direct vent
appliances, or no combustion appliances Column A
One or multiple fan‐ assisted appliances and
power vent or direct vent appliances Column B
One atmospherically vented gas or oil appliance or one solid fuel appliance Column C
Multiple atmospherically vented gas or oil appliances or solid fuel appliances Column D
Duct diameter
Passive opening 1 – 36 1 – 22 1 – 15 1 – 9 3
Passive opening 37 – 66 23 – 41 16 – 28 10 – 17 4
Passive opening 67 – 109 42 – 66 29 – 46 18 – 28 5
Passive opening 110 ‐ 163 67 – 100 47 – 69 29 – 42 6
Passive opening 164 – 232 101 – 143 70 – 99 43 – 61 7
Passive opening 233 – 317 144 – 195 100 – 135 62 – 83 8
Passive opening w/motorized damper 318 – 419 196 – 258 136 – 179 84 – 110 9
Passive opening w/motorized damper 420 – 539 259 – 332 180 – 230 111 – 142 10
Passive opening w/motorized damper 540 – 679 333 – 419 231 – 290 143 – 179 11
Powered makeup air >679 >419 >290 >179 NA
Notes: A. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90‐ degree elbow to determine the remaining length of straight duct allowable. B. If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. Compressed duct shall
not be accepted. C. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. D. Powered makeup air shall be electrically interlocked with the largest exhaust system.
Section F
Combustion
Not required per mechanical code (No atmospheric or power vented appliances)
Passive (see IFGC Appendix E, Worksheet E‐1) Size and type
Other, describe:
Explanation ‐ If no atmospheric or power vented appliances are installed, check the appropriate box, not required. If a
power vented or atmospherically vented appliance installed, use IFGC Appendix E, Worksheet E‐1 (see below). Please
enter size and type. Combustion air vent supplies must communicate with the appliance or appliances that require the
combustion air.
Section F calculations follow on the next 2 pages.
5
Directions ‐ The Minnesota Fuel Gas Code method to calculate to size of a required combustion air opening, is called the Known Air Infiltration Rate Method. For new construction, 4b of step 4 is required to be filled out.
IFGC Appendix E, Worksheet E‐1--Residential Combustion Air Calculation Method (for Furnace, Boiler, and/or Water Heater in the Same Space)
Step 1: Complete vented combustion appliance information.
Furnace/Boiler:
Draft Hood Fan Assisted Direct Vent Input: ______________________Btu/hr
or Power Vent Water Heater:
Draft Hood Fan Assisted Direct Vent Input: ______________________Btu/hr or Power Vent
Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS includes all
spaces connected to one another by code compliant openings.
CAS volume: ft3 L x W x H L W H
Step 3: Determine Air Changes per Hour (ACH)1 Default ACH values have been incorporated into Table E‐1 for use with Method 4b (KAIR Method). If the year of construction or ACH is not known, use method 4a (Standard Method).
Step 4: Determine Required Volume for Combustion Air. (DO NOT COUNT DIRECT VENT APPLIANCES)
4a. Standard Method Total Btu/hr input of all combustion appliances Input: Btu/hr
Use Standard Method column in Table E‐1 to find Total Required TRV: ft3 Volume (TRV) If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP 5.
4b. Known Air Infiltration Rate (KAIR) Method (DO NOT COUNT DIRECT VENT APPLIANCES)
Total Btu/hr input of all fan‐assisted and power vent appliances Input: Btu/hr
Use Fan‐Assisted Appliances column in Table E‐1 to find RVFA: ft3 Required Volume Fan Assisted (RVFA)
Total Btu/hr input of all Natural draft appliances Input: Btu/hr
Use Natural draft Appliances column in Table E‐1 to find RVNFA: ft3 Required Volume Natural draft appliances (RVNDA)
Total Required Volume (TRV) = RVFA + RVNDA TRV = + = TRV ft3 If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP 5.
Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b)
Ratio =______ /_______ =_______________
Step 6: Calculate Reduction Factor (RF). RF = 1 minus Ratio
RF = 1 ‐ __________________=__________________
Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS
Input: Btu/hr (EXCEPT DIRECT VENT) Combustion Air Opening Area (CAOA): Total Btu/hr divided by 3000 Btu/hr per in2
CAOA =___________________/ 3000 Btu/hr per in2 =_____________________in2
Step 8: Calculate Minimum CAOA: Minimum CAOA = CAOA multiplied by RF
Minimum CAOA =________________ x____________________ =__________ in2
Step 9: Calculate Combustion Air Opening Diameter (CAOD): CAOD = 1.13 multiplied by the square root of Minimum CAOA
CAOD = 1.13 √ Minimum CAOA = in. diameter go up one inch in size if using flex duct
1 If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section G304.
6
IFGC Appendix E, Table E‐1 Residential Combustion air (Required Interior Volume Based on Input Rating of Appliance)
Input Rating
(Btu/hr)
Standard Method Known Air Infiltration Rate (KAIR) Method (cu ft)
Fan Assisted or Power Vent Natural Draft
1994 to present Pre‐1994 1994 to present Pre‐1994
5,000 250 375 188 525 263
10,000 500 750 375 1,050 525
15,000 750 1,125 563 1,575 788
20,000 1,000 1,500 750 2,100 1,050
25,000 1,250 1,875 938 2,625 1,313
30,000 1,500 2,250 1,125 3,150 1,575
35,000 1,750 2,625 1,313 3,675 1,838
40,000 2,000 3,000 1,500 4,200 2,100
45,000 2,250 3,375 1,688 4,725 2,363
50,000 2,500 3,750 1,675 5,250 2,625
55,000 2,750 4,125 2,063 5,775 2,888
60,000 3,000 4,500 2,250 6,300 3,150
65,000 3,250 4,875 2,438 6,825 3,413
70,000 3,500 5,250 2,625 7,350 3,675
75,000 3,750 5,625 2,813 7,875 3,938
80,000 4,000 6,000 3,000 8,400 4,200
85,000 4,250 6,375 3,188 8,925 4,463
90,000 4,500 6,750 3,375 9,450 4,725
95,000 4,750 7,125 3,563 9,975 4,988
100,000 5,000 7,500 3,750 10,500 5,250
105,000 5,250 7,875 3,938 11,025 5,513
110,000 5,500 8,250 4,125 11,550 5,775
115,000 5,750 8.625 4,313 12,075 6,038
120,000 6,000 9,000 4,500 12,600 6,300
125,000 6,250 9,375 4,688 13,125 6,563
130,000 6,500 9,750 4,875 13,650 6,825
135,000 6,750 10,125 5,063 14,175 7,088
140,000 7,000 10,500 5,250 14,700 7,350
145,000 7,250 10,875 5,438 15,225 7,613
150,000 7,500 11,250 5,625 15,750 7,875
155,000 7,750 11,625 5,813 16,275 8,138
160,000 8,000 12,000 6,000 16,800 8,400
165,000 8,250 12,375 6,188 17,325 8,663
170,000 8,500 12,750 6,375 17,850 8,925
175,000 8,750 13,125 6,563 18,375 9,188
180,000 9,000 13,500 6,750 18,900 9,450
185,000 9,250 13,875 6,938 19,425 9,713
190,000 9,500 14,250 7,125 19,950 9,975
195,000 9,750 14,625 7,313 20,475 10,238
200,000 10,000 15,000 7,500 21,000 10,500
205,000 10,250 15,375 7,688 21,525 10,783
210,000 10,500 15,750 7,875 22,050 11,025
215,000 10,750 16,125 8,063 22,575 11,288
220,000 11,000 16,500 8,250 23,100 11,550
225,000 11,250 16,875 8,438 23,625 11,813
230,000 11,500 17,250 8,625 24,150 12,075
1. The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section of the table is 0.20 ACH.
2. This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the table is 0.40 ACH.
HVAC Load Calculations
for
JMS Custom Homes
18108 Jurel Cir
Lakeville, MN
Prepared By:
Samantha Lykke
Air Mechanical
16411 Aberdeen St NE
Ham Lake, MN 55304
Tuesday, April 23, 2019
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 2
Project Report
General Project Information
Project Title:
Project Date:Tuesday, April 23, 2019
Client Name:JMS Custom Homes
Client Address:18108 Jurel Cir
Client City:Lakeville, MN
Company Name:Air Mechanical
Company Representative:Samantha Lykke
Company Address:16411 Aberdeen St NE
Company City:Ham Lake, MN 55304
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces Northeast
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -12.38 n/a 30%72 29.40
Summer:88 73 50%50%74 37
Check Figures
Total Building Supply CFM:916 CFM Per Square ft.:0.310
Square ft. of Room Area:2,952 Square ft. Per Ton:1,412
Volume (ft³):17,578
Building Loads
Total Heating Required Including Ventilation Air:50,991 Btuh 50.991 MBH
Total Sensible Gain:20,379 Btuh 81 %
Total Latent Gain:4,707 Btuh 19 %
Total Cooling Required Including Ventilation Air:25,086 Btuh 2.09 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 3
Miscellaneous Report
System 1
Input Data
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Outdoor
Rel.Hum
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Difference
Winter:-15 -12.38 100%30%72 29.40
Summer:88 73 50%50%74 37.40
Duct Sizing Inputs
Main Trunk Runouts
Calculate:Yes Yes
Use Schedule:Yes Yes
Roughness Factor:0.00300 0.01000
Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft.
Minimum Velocity:0 ft./min 0 ft./min
Maximum Velocity:900 ft./min 750 ft./min
Minimum Height:0 in.0 in.
Maximum Height:0 in.0 in.
Outside Air Data
Winter Summer
Infiltration Specified:0.320 AC/hr 0.160 AC/hr
94 CFM 47 CFM
Infiltration Actual:0.260 AC/hr 0.000 AC/hr
Above Grade Volume:Cu.ft.Cu.ft.X 17,578 X 17,578
4,570 Cu.ft./hr 0 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration:76 CFM 0 CFM
Total Building Ventilation:55 CFM 55 CFM
---System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 14.94 = (1.10 X 0.970 X 14.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 24.67 = (0.68 X 0.970 X 37.40 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified:0.320 AC/hr (94 CFM), Construction: Average
Summer Infiltration Specified:0.160 AC/hr (47 CFM), Construction: Average
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 4
Duct Size Preview
Room or
Duct Name Source Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Lower Level Built-In 0 750 0.01 0.1 426.7 218 251 251 3--6
2-Main Level Built-In 0 750 0.01 0.1 483.7 368 665 665 7--6
Other Ducts in System 1
Supply Main Trunk Built-In 0 900 0.003 0.1 776.1 587 916 916 10x17
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:587
Cooling Flow:916
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 5
Detailed Room Loads - Room 1 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:n/a System Number:1
Room Width:n/a Zone Number:1
Area:1,476.0 sq.ft.Supply Air:251 CFM
Ceiling Height:8.0 ft.Supply Air Changes:1.3 AC/hr
Volume:11,808 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:3 Actual Winter Vent.:20 CFM
Runout Air:84 CFM Percent of Supply.:8 %
Runout Duct Size:6 in.Actual Summer Vent.:15 CFM
Runout Air Velocity:427 ft./min.Percent of Supply:6 %
Runout Air Velocity:427 ft./min.Actual Winter Infil.:19 CFM
Actual Loss:0.114 in.wg./100 ft.Actual Summer Infil.:0 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-15B0-10sf-8 40 X 8 320 0.050 4.4 1,392 0.0 0 0
E -Wall-15B0-10sf-4 48 X 4 192 0.054 4.7 902 0.0 0 0
S -Wall-12F-0bw 40 X 8 228 0.065 5.7 1,289 0.6 0 142
W -Wall-15B0-10sf-8 48 X 8 384 0.050 4.4 1,670 0.0 0 0
N -Wall-12F-0bw 48 X 4 174.5 0.065 5.7 987 0.6 0 109
N -Gls-4a shgc-0.34 100%S 17.5 0.320 27.8 487 10.9 0 191
S -Gls-4agdoor shgc-0.34 0%S 42 0.320 27.8 1,169 20.0 0 838
S -Gls-4a shgc-0.34 0%S (2)50 0.320 27.8 1,392 20.0 0 998
Floor-21A-20 1 X 1476 1476 0.027 2.3 3,467 0.0 0 0
Subtotals for Structure:12,755 0 2,278
Infil.: Win.: 18.6, Sum.: 0.0 512 3.375 1,728 0.000 0 0
Ductwork:759 0
AED Excursion:104
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,050 1,500
Lighting:300 1,023
Room Totals:15,242 1,450 5,365
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 6
Detailed Room Loads - Room 2 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:n/a System Number:1
Room Width:n/a Zone Number:1
Area:1,476.0 sq.ft.Supply Air:665 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.0 AC/hr
Volume:13,284 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:35 CFM
Runout Air:95 CFM Percent of Supply.:5 %
Runout Duct Size:6 in.Actual Summer Vent.:40 CFM
Runout Air Velocity:484 ft./min.Percent of Supply:6 %
Runout Air Velocity:484 ft./min.Actual Winter Infil.:58 CFM
Actual Loss:0.146 in.wg./100 ft.Actual Summer Infil.:0 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0bw 40 X 9 281 0.065 5.7 1,589 0.6 0 175
E -Wall-12F-0bw 48 X 9 350 0.065 5.7 1,979 0.6 0 218
S -Wall-12F-0bw 40 X 9 216 0.065 5.7 1,221 0.6 0 135
W -Wall-12F-0bw 48 X 9 428 0.065 5.7 2,420 0.6 0 267
N -Door-11N 3 X 7 21 0.350 30.5 639 8.8 0 184
N -Door-11G 3 X 7 21 0.540 47.0 987 13.5 0 284
N -Gls-4a shgc-0.34 100%S (2)30 0.320 27.8 836 10.9 0 328
N -Gls-4a shgc-0.34 100%S 7 0.320 27.8 195 10.9 0 76
E -Gls-4a shgc-0.34 0%S 8 0.320 27.8 223 36.3 0 290
E -Gls-4a shgc-0.34 0%S 14 0.320 27.8 390 36.3 0 508
E -Gls-4a shgc-0.34 0%S (2)24 0.320 27.8 668 36.3 0 870
E -Gls-4a shgc-0.34 0%S (2)36 0.320 27.8 1,002 36.3 0 1,306
S -Gls-4agdoor shgc-0.34 0%S 42 0.320 27.8 1,169 20.0 0 838
S -Gls-4a shgc-0.34 0%S (4)72 0.320 27.8 2,004 19.9 0 1,436
S -Gls-4a shgc-0.34 0%S 30 0.320 27.8 835 20.0 0 599
W -Gls-4a shgc-0.34 0%S 4 0.320 27.8 111 36.3 0 145
UP-Ceil-16B-44 1476 X 1 1476 0.022 1.9 2,825 1.1 0 1,591
Subtotals for Structure:19,093 0 9,250
Infil.: Win.: 57.6, Sum.: 0.0 1,584 3.374 5,345 0.000 0 0
Ductwork:1,281 0
AED Excursion:276
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,500 2,500
Lighting:500 1,705
Room Totals:25,719 1,900 14,191
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Air Mechanical Inc.
Ham Lake, MN 55304 Page 7
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Lower Level 1,476 15,242 218 3-6 427 5,365 1,450 251 251
2 Main Level 1,476 25,719 368 7-6 484 14,191 1,900 665 665
Ventilation 5,107 822 1,357
Humidification 2,884
Return Duct 2,040 0 0
System 1 total 2,952 50,991 587 20,379 4,707 916 916
System 1 Main Trunk Size:10x17 in.
Velocity:776 ft./min
Loss per 100 ft.:0.098 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.09 81% / 19%20,379 4,707 25,086
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:
Indoor Model:
Brand:
Efficiency:0 AFUE 0 SEER
Sound:0 0
Capacity:0 Btuh 0 Btuh
Sensible Capacity:n/a 0 Btuh
Latent Capacity:n/a 0 Btuh
C:\Users\slykke\Desktop\18108 Jurel Cir.rh9 Tuesday, April 23, 2019, 1:55 PM
05/17/19 X
KP