HomeMy WebLinkAbout8478 195th Street West-SURVEY (1)Zoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________05/24/2019 corlowsky
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________05/24/2019 corlowsky
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION