HomeMy WebLinkAbout18872 Houston Way SurveyA. 4/23/19: ClientJames R. Hill, Inc.
2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FORDRAWN BYDATEREVISIONSSHP4/19/2019CAD FILEPRO-ECT NO.SHEET 1 OF 1390410.dwg390410Lot 12, Block 3, CHOKECHERRY HILL
4TH ADDITION,
Dakota County, MinnesotaDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevation1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by PIONEER engineering.6.Grading plan date/revision date: June 19, 20187.Plan No. 5490-A 'GRANT'NOTESLot= 11,050 sq. ft.House/Garage= 1,998 sq. ft.Porch= 140 sq. ft.Driveway= 810 sq. ft.Sidewalk= 87 sq. ft.Patio= 18 sq. ft.Total Impervious= 3,053 sq. ft. or 27.63% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 1093.1Garage Top of Foundation= 1093.5House Top of Foundation= 1093.5Lowest Floor= 1085.5Lot 12, Block 3, CHOKECHERRY HILL 4TH ADDITION, Dakota County, MinnesotaPROPERTY DESCRIPTION18872 Houston Way, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 19th day of April, 2019Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 7 and 8, Block 5 = 1093.11BENCHMARKZoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'ENGINEERING REVIEWEDDate:__________________05/24/2019corlowsky*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.