Loading...
HomeMy WebLinkAbout18197 Glenbridge Ave SurveyPlanning DepartmentApprovedDate:__________________05/22/2019 dmorey EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection.*Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 05/28/2019 mhughes