HomeMy WebLinkAboutSurvey - 8294 200th St, LakevilleEROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
*Draintile connection required.
ENGINEERING REVIEWED
Date: 05/29/2019 mhughes