Loading...
HomeMy WebLinkAboutSurvey - 8294 200th St, LakevilleEROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements *Draintile connection required. ENGINEERING REVIEWED Date: 05/29/2019 mhughes