Loading...
HomeMy WebLinkAboutItem 4 ESTIMATED COST $7,500,000 $11,900,000 $2,000,000 $6,900,000 $315,150 $28,615,150 PARK BOND REFERENDUMPROPOSED PROJECTS PROJECT Antlers Park TOTAL Ames Arena East Community Park Bonding Costs Avonlea Park C:\Users\seskelson\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1HAL6VJ1\PROPOSED PROJECTS May 14, 2019Council Action by February 28, 2019 (council meeting on Feb 19, 2019)Construction likely in 2020, unless plans and specs developed before referendumNovember 5, 2019Council Action by August 23, 2019 (council meeting on August 19, 2019)Likely to be at same time as ISD 194 electionConstruction could begin in 2020February 11 or April 14 2020Council Action by November 29, 2019 or January 31, 2020Construction possible in 2020May 12, 2020Council Action by February 28, 2020Construction unlikely in 2020, unless plans and specs developed before referendumAugust 11, 2020Council Action by May 29, 2020Primary election date (State and Federal Offices)Construction likely in 2021November 3, 2020Council Action by August 21, 2020General Election (Presidential, State and Federal Offices)Construction likely in 2021Park Bond Referendum Scenarios ANTLERS PARK Preliminary Master Plan 50 SCALE IN FEET 250 100Lakeville, Minnesota 10/19/17 | 02686-040 K:\02686-040\Cad\Exhibits\02686-040 Prelim MP113 STALLS 58 STALLS FOCAL ELEMENTS 129 STALLS PARK SIGNRINSE-OFF SHOWERS VOLLEYBALL (5)VOLLEYBALL (2) 202nd ST W 201st ST W IPAVA AVEKEY LEGEND SWIMMING AREA FISHING PIER BOAT BEACHING AREA SHORELINE PROTECTION OPEN LAWN FUTURE LAKE MARION GREENWAY TRAIL REALIGNED PARKING ENTRANCE / EXITA PARKING (300 TOTAL STALLS)B B B B O A MOTORCYCLE PARKINGC TRAILSD REGIONAL TRAIL HEAD • Kiosk/Maps • Monument Sign • Fix-it Station • Water Fountain E BIKE RACKF REGIONAL CROSSWALK / TRAIL CONNECTIONG HISTORIC GRAND PROMENADE DRIVE & DROP OFFH FOOD TRUCK AND EXHIBIT SPACEI STORMWATER & NATURALIZED AREAS J CENTRAL PLAZA • Historic Location of Dance Pavilion • Historical Displays • Restroom/Changing Room Building • Concessions/Meeting Room/Storage • Framed View of Lake • Seating Patio • Community Fire Pit • Arbors with Seating K CHILDREN’S PLAYGROUND WITH SEATINGL ORNAMENTAL SPLASH PAD WITH FOUNTAIN • Ground Sprays • Lighted at Night • Or namental Fence M ARBORSN SHADE SAILS & TABLESO PAD FOR RENTALSP S PAVILION STRUCTUREQ STANDARD PICNIC SHELTERR SMALL GROUP SHELTERS ADVENTURE / CHALLENGE AREA T LARGE GROUP SHELTERU LAWN GAMESV P T Q SR R R V O L M N L K J J J J J I F F F U H G E D D D D D C ANTLERS PARK Lakeville, Minnesota 10/19/17 | 02686-040 The master plan images on this board are meant to illustrate general proposed layout showing how the amenities relate to one another and to provide examples of the types of amenities to consider during implementation. The actual designs for the buildings, playground equipment and other site amenities have not been determined at this point and would take place during the final design process to ensure the materials, colors and textures fit with the site appropriately. • Central plaza is approximately 3 feet higher than the playground and splash fountain • Plaza buildings would frame the view of the lake and illustrate historical images • Or namental fence, plantings and arbors separate the patio and lower area • Pavilion and lawn area is located to the north of the plaza • Plaza buildings frame the view of the fountain and lake • Fire pit provides year-round use of park • Fountain sprays provide ornamental interest and interactive play The images below provide a range of examples of multi-generational play features that could be incorporated into the adventure / challenge area meant to provide more interest for a broad range of user groups. VIEW FROM THE CENTRAL PLAZA TOWARDS THE LAKE PERSPECTIVE OF THE CENTRAL PLAZA AREA AND BEACH K:\012393-000\Cad\Exhibits\012393-00 Concept BoardsLakeville, Minnesota November 1, 2018 | WSB Project number: 012393-000 East Community Park Phase 2 MASTER PLAN 165th St W Pilot Knob RdEagl Evi EW dRE l a KE d REquEStRian tRailEnvoy WaynatuRal tRail MoWEd tRail ovERlooK oPEn laWn: 2-PRacticE laX FiEldS oR 1- youth SoccER FiEld East LakE FiShing PiER EXiSting boaRdWalK iMPRovEd ovERlooKS ShEltER natuRE Play ovERlooK With StonE ShoRElinE FiShing StonE ovERlooK PRaiRiE Pollination gaRdEnS PRaiRiE Pollination gaRdEnS EXiSting tRail EXiSting tRail EXiSting tRail EXiSting tRail EXiSting PaRK tRail hEad & ShEltER: • Picnic aREa • REStRooMS • KioSK/MaPS • biKE FiX-it Station • WatER Fountain **tRail lightS PRoPoSEd tRail canoE/KayaK boaRding docK & RacKS canoE/KayaK accESS tRail & RacKS PaRKing (40 StallS) SEE EnlaRgEMEnt Scale in Feet 100’50’0’200’ K:\012393-000\Cad\Exhibits\012393-00 Concept BoardsLakeville, Minnesota November 1, 2018 | WSB Project number: 012393-000 East Community Park Phase 2 ENLARGEMENT oPEn laWn laWn gaMES EXiSting tRail tRail lightS PRoPoSEd WalKWay canoE/KayaK RacKS REtaining Wall boaRding docK StEPS to boaRding docK dRoP-oFF aREa Graphic Scale 10’5’0’20’ tRail hEad & ShEltER: • Picnic aREa • REStRooMS • KioSK/MaPS • biKE FiX-it Station • WatER Fountain • gRill