PARK BOND REFERENDUMPROPOSED PROJECTS
PROJECT
Antlers Park
TOTAL
Ames Arena
East Community Park
Bonding Costs
Avonlea Park
C:\Users\seskelson\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\1HAL6VJ1\PROPOSED
PROJECTS
May 14, 2019Council Action by February 28, 2019 (council meeting on Feb 19, 2019)Construction likely in 2020, unless plans and specs developed before referendumNovember 5, 2019Council Action by August 23, 2019 (council meeting on August 19, 2019)Likely to be at same time as ISD 194 electionConstruction could begin in 2020February 11 or April 14 2020Council Action by November 29, 2019 or January 31, 2020Construction possible in 2020May 12, 2020Council Action by February 28, 2020Construction unlikely in 2020, unless plans and specs developed before referendumAugust 11, 2020Council Action by May 29, 2020Primary election date (State and Federal Offices)Construction likely in 2021November 3, 2020Council Action by August 21, 2020General Election (Presidential, State and Federal Offices)Construction likely in 2021Park Bond Referendum Scenarios
ANTLERS PARK
Preliminary Master Plan 50
SCALE IN FEET
250 100Lakeville, Minnesota
10/19/17 | 02686-040
K:\02686-040\Cad\Exhibits\02686-040 Prelim MP113 STALLS
58 STALLS
FOCAL ELEMENTS
129 STALLS
PARK SIGNRINSE-OFF
SHOWERS
VOLLEYBALL (5)VOLLEYBALL (2)
202nd ST W
201st ST W
IPAVA AVEKEY
LEGEND
SWIMMING
AREA
FISHING
PIER
BOAT BEACHING
AREA
SHORELINE
PROTECTION
OPEN LAWN
FUTURE LAKE MARION
GREENWAY TRAIL
REALIGNED PARKING
ENTRANCE / EXITA
PARKING (300 TOTAL STALLS)B
B
B
B
O
A
MOTORCYCLE PARKINGC
TRAILSD
REGIONAL TRAIL HEAD
• Kiosk/Maps
• Monument Sign
• Fix-it Station
• Water Fountain
E
BIKE RACKF
REGIONAL CROSSWALK /
TRAIL CONNECTIONG
HISTORIC GRAND PROMENADE
DRIVE & DROP OFFH
FOOD TRUCK AND EXHIBIT SPACEI
STORMWATER &
NATURALIZED AREAS
J
CENTRAL PLAZA
• Historic Location of Dance
Pavilion
• Historical Displays
• Restroom/Changing Room
Building
• Concessions/Meeting
Room/Storage
• Framed View of Lake
• Seating Patio
• Community Fire Pit
• Arbors with Seating
K
CHILDREN’S PLAYGROUND
WITH SEATINGL
ORNAMENTAL SPLASH PAD WITH
FOUNTAIN
• Ground Sprays
• Lighted at Night
• Or namental Fence
M
ARBORSN
SHADE SAILS & TABLESO
PAD FOR RENTALSP
S
PAVILION STRUCTUREQ
STANDARD PICNIC SHELTERR
SMALL GROUP SHELTERS
ADVENTURE / CHALLENGE
AREA
T
LARGE GROUP SHELTERU
LAWN GAMESV
P
T
Q
SR
R
R
V
O
L
M
N
L
K
J
J
J
J
J
I
F
F
F
U
H
G
E
D
D
D
D
D
C
ANTLERS PARK
Lakeville, Minnesota
10/19/17 | 02686-040
The master plan images on this board are meant to illustrate general proposed layout showing how the amenities relate to one another and to provide examples
of the types of amenities to consider during implementation. The actual designs for the buildings, playground equipment and other site amenities have not
been determined at this point and would take place during the final design process to ensure the materials, colors and textures fit with the site appropriately.
• Central plaza is approximately 3 feet higher than the playground and splash fountain
• Plaza buildings would frame the view of the lake and illustrate historical images
• Or namental fence, plantings and arbors separate the patio and lower area
• Pavilion and lawn area is located to the north of the plaza
• Plaza buildings frame the view of the fountain and lake
• Fire pit provides year-round use of park
• Fountain sprays provide ornamental interest and interactive play
The images below provide a range of examples of multi-generational play features that could be incorporated
into the adventure / challenge area meant to provide more interest for a broad range of user groups.
VIEW FROM THE CENTRAL PLAZA TOWARDS THE LAKE PERSPECTIVE OF THE CENTRAL PLAZA AREA AND BEACH
K:\012393-000\Cad\Exhibits\012393-00 Concept BoardsLakeville, Minnesota
November 1, 2018 | WSB Project number: 012393-000
East Community Park Phase 2
MASTER PLAN
165th St W
Pilot Knob RdEagl
Evi
EW dRE l a KE d REquEStRian tRailEnvoy WaynatuRal
tRail
MoWEd
tRail
ovERlooK
oPEn laWn:
2-PRacticE
laX FiEldS
oR
1- youth
SoccER FiEld
East LakE
FiShing
PiER
EXiSting
boaRdWalK
iMPRovEd
ovERlooKS
ShEltER
natuRE Play
ovERlooK With StonE
ShoRElinE FiShing
StonE ovERlooK
PRaiRiE
Pollination
gaRdEnS
PRaiRiE
Pollination
gaRdEnS
EXiSting
tRail
EXiSting
tRail
EXiSting
tRail
EXiSting tRail
EXiSting
PaRK
tRail hEad & ShEltER:
• Picnic aREa
• REStRooMS
• KioSK/MaPS
• biKE FiX-it Station
• WatER Fountain **tRail lightS
PRoPoSEd
tRail
canoE/KayaK boaRding
docK & RacKS
canoE/KayaK accESS
tRail & RacKS
PaRKing
(40 StallS)
SEE EnlaRgEMEnt
Scale in Feet
100’50’0’200’
K:\012393-000\Cad\Exhibits\012393-00 Concept BoardsLakeville, Minnesota
November 1, 2018 | WSB Project number: 012393-000
East Community Park Phase 2
ENLARGEMENT
oPEn laWn
laWn
gaMES
EXiSting
tRail
tRail lightS
PRoPoSEd
WalKWay
canoE/KayaK
RacKS
REtaining Wall
boaRding
docK
StEPS to
boaRding docK
dRoP-oFF aREa
Graphic Scale
10’5’0’20’
tRail hEad & ShEltER:
• Picnic aREa
• REStRooMS
• KioSK/MaPS
• biKE FiX-it Station
• WatER Fountain
• gRill