Loading...
HomeMy WebLinkAboutItem 09 Date: Item No. NORTH CREEK PRELIMINARY PLAT Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution approving the North Creek preliminary plat. Overview KJ Walk, Inc. has submitted a preliminary plat application for 80 single family lots, 42 detached townhome lots, and four outlots on 87.78 acres of land located south of 173rd Street and east of Pilot Knob Road (CSAH 31). The property is zoned RM-1, Medium Density Residential District. The Planning Commission held a public hearing at their June 6, 2019 meeting to consider the preliminary plat. There was one public comment inquiring about future park land in the area. The Planning Commission unanimously recommended approval of the preliminary plat. The Parks, Recreation, and Natural Resources Committee unanimously recommended approval of the preliminary plat at their June 5, 2019 meeting. Primary Issue to Consider Why is the developer constructing a trail on the Dakota County property east of the development site? Dakota County has prepared the North Creek Greenway Master Plan, which identifies a greenway to connect Lebanon Hills Regional Park in Eagan with downtown Farmington and the Vermillion River. The county acquired land for the greenway trail in this area several years ago. Construction of the trail will not only narrow the existing trail gap between 173rd Street and the city boundary with Farmington but also provide access to the future neighborhood park within the North Creek development (Outlot B) and East Community Park to the north. Supporting Information • Preliminary plat resolution • June 6, 2019 draft Planning Commission meeting minutes • June 5, 2019 draft Parks, Recreation & Natural Resources Committee meeting minutes • May 30, 2019 Planning and Engineering Reports Financial Impact: $ Budgeted: Y☐ N☐ Source: Related Documents: Zoning & Subdivision Ordinances Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Kris Jenson, Associate Planner June 17, 2019 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 19-_____ RESOLUTION APPROVING THE PRELIMINARY PLAT OF NORTH CREEK WHEREAS, KJ Walk, Inc. has requested approval of the preliminary plat of 80 single family lots and 42 detached townhome lots to be known as NORTH CREEK, legally described in Exhibit A; and WHEREAS, the Planning Commission held a public hearing at their June 6, 2019 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources Committee unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: NORTH CREEK preliminary plat is approved subject to the following conditions: 1. Implementation of the recommendations listed in the May 30, 2019 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct 5-foot-wide concrete sidewalks along one side of all streets. The developer shall construct a bituminous trail within the Dakota County greenway property east of the development and provide a cash escrow for the future construction of a trail along the east side of Pilot Knob Road. 4. Outlots A, B, and C shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting Pilot Knob Road must install sod to the rear property line and a $1,000 per lot security will be required with the building permit. At the time of final plat submittal, the landscape plan must be modified to supplement the overstory trees with shrubs such that the buffer yard contains a continuous band of plants. 6. The following lots shall have restricted driveway access: • Lot 1, Block 1 and Lot 1, Block 2 shall have driveway access from Encina Path. 2 • Lots 3-10, Block 2 shall have driveway access from Ely Avenue. 7. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 8. The existing house, accessory structures, fence, well, and septic system must be removed with the development of this property. 9. A homeowner’s association must be established for ownership and maintenance of Lot 15, Block 5, Lot 22, Block 6, and Lot 8, Block 7. 10. Detached townhomes must meet the exterior materials requirements of Section 11-58- 21c.4 of the Zoning Ordinance. 11. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. 12. Each detached townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21D of the Zoning Ordinance. 13. Each detached townhome unit shall provide storm protection as required in Section 11-17-27 of the Zoning Ordinance. 14. The developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21K of the Zoning Ordinance. ADOPTED by the Lakeville City Council this 17th day of June 2019. CITY OF LAKEVILLE Douglas P. Anderson, Mayor ATTEST: _______________________ Charlene Friedges, City Clerk Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 3 EXHIBIT A Outlot D, WILD WINGS, Dakota County, Minnesota. And That part of the West 1532.10 feet of the South Half of the Northwest Quarter of Section 12, Township 114, Range 20, Dakota County, Minnesota lying northerly of the north line of the South 486.00 feet thereof, lying westerly of the northwesterly extension of the east line of Outlot D, WILD WINGS and lying southerly of CORNERSTONE LAKE 4TH ADDITION. And The South 485 feet of the West 898.20 feet of the South Half of the Northwest Quarter of Section 12, Township 114, Range 20, Dakota County, Minnesota. And That part of the Northeast Quarter of the Southwest Quarter of Section 12, Township 114 North, Range 20 West, Dakota County, Minnesota described as follows: Beginning at the southeast corner of Outlot D, WILD WINGS; thence South 1 degree 12 minutes 08 seconds West, along the southerly extension of the east line of said Outlot D, a distance of 83.01 feet; thence South 21 degrees 28 minutes 53 seconds West a distance of 192.55 feet to a hereinafter described "Line A"; thence westerly along said "Line A" to the north line of said Northeast Quarter of the Southwest Quarter; thence easterly, along said north line to the point of beginning. The hereinbefore referenced "Line A" is described as follows: Commencing at the southwest corner of said South Half of the Northwest Quarter; thence North 00 degrees 15 minutes 17 seconds East along the west line thereof, a distance of 373.14 feet to the point of beginning of said "Line A"; thence East a distance of 85.39 feet; thence South 00 degrees 33 minutes 42 seconds West a distance of 102.00 feet; thence South 76 degrees 45 minutes 34 seconds East a distance of 87.32 feet; thence South 53 degrees 07 minutes 48 seconds East a distance of 170.00 feet; thence South 75 degrees 30 minutes 37 seconds East a distance of 91.92 feet; thence South 87 degrees 24 minutes 08 seconds East a distance of 529.54 feet; thence South 75 degrees 54 minutes 14 seconds East a distance of 463.97 feet; thence East a distance of 145.00 feet; thence South 35 degrees 34 minutes 05 seconds East a distance of 220.06 feet; thence South 71 degrees 33 minutes 54 seconds East a distance of 512.29 feet; thence East a distance of 109.00 feet; thence North, a distance of 339.57 feet to a point on the north line of the North Half of the Southwest Quarter of said Section 12; 4 thence South 89 degrees 41 minutes 10 seconds East 396.37 feet to the northeast corner thereof and said "Line A" there terminating. And That part of the North Half of the Southwest Quarter of Section 12, Township 114 North, Range 20 West, Dakota County, Minnesota described as follows: Beginning at the southwest corner of Outlot C, WILD WINGS; thence South 1 degree 12 minutes 08 seconds West, along the southerly extension of the west line of said Outlot C, a distance of 96.74 feet; thence South 53 degrees 58 minutes 40 seconds East a distance of 73.04 feet; thence South 24 degrees 56 minutes 22 seconds East a distance of 135.07 feet thence South 20 degrees 03 minutes 52 seconds West a distance of 83.44 feet to a hereinafter described "Line A"; thence easterly and northerly along said "Line A" to the north line of said Northeast Quarter of the Southwest Quarter; thence westerly, along said north line to the point of beginning. The hereinbefore referenced "Line A" is described as follows: Commencing at the southwest corner of the South Half of the Northwest Quarter of said Section 12; thence North 00 degrees 15 minutes 17 seconds East along the west line thereof, a distance of 373.14 feet to the point of beginning of said "Line A"; thence East a distance of 85.39 feet; thence South 00 degrees 33 minutes 42 seconds West a distance of 102.00 feet; thence South 76 degrees 45 minutes 34 seconds East a distance of 87.32 feet; thence South 53 degrees 07 minutes 48 seconds East a distance of 170.00 feet; thence South 75 degrees 30 minutes 37 seconds East a distance of 91.92 feet; thence South 87 degrees 24 minutes 08 seconds East a distance of 529.54 feet; thence South 75 degrees 54 minutes 14 seconds East a distance of 463.97 feet; thence East a distance of 145.00 feet; thence South 35 degrees 34 minutes 05 seconds East a distance of 220.06 feet; thence South 71 degrees 33 minutes 54 seconds East a distance of 512.29 feet; thence East a distance of 109.00 feet; thence North, a distance of 339.57 feet to a point on the north line of the North Half of the Southwest Quarter of said Section 12; thence South 89 degrees 41 minutes 10 seconds East 396.37 feet to the northeast corner thereof and said "Line A" there terminating. CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES June 6, 2019 Chair Kaluza called the meeting to order at 6:00 p.m. in the Council Chambers at City Hall. The pledge of allegiance to the flag was given. Members Present: Chair Pat Kaluza, Brooks Lillehei, Karl Drotning, Jason Swenson, Jeff Witte, Jason Kelvie Members Absent: Jenna Majorowicz, Scott Einck, Ex-officio Mike Lamm Others Present: Daryl Morey, Planning Director; Kris Jenson, Associate Planner; Alex Jordan, Assistant City Engineer; Penny Brevig, Recording Secretary 3. Approval of the Meeting Minutes The May 23, 2019 Planning Commission meeting minutes were approved as presented. 4. Announcements Mr. Morey stated that the June 5, 2019 Parks, Recreation and Natural Resources Committee meeting motion regarding the North Creek preliminary plat was distributed to the Planning Commission at tonight’s meeting. Mr. Morey informed the Planning Commission that July 23rd at 5:00 p.m. has been set for the bus tour of several mixed use developments in Twin Cities suburbs in preparation for work session discussions about the new Corridor Mixed Use (CMU) District in the 2040 Comprehensive Plan. More information will be e-mailed out in the coming weeks for people to RSVP. Mr. Morey stated that there will be a work session immediately following tonight’s meeting to include a discussion of the 2019 Zoning Ordinance Update. 5. North Creek Chair Kaluza opened the public hearing to consider the application of KJ Walk, Inc. for a preliminary plat of 80 single family residential lots and 42 detached townhome lots to be known as North Creek, located east of Pilot Knob Road (CSAH 31) and south of 173rd Street. Warren Israelson, owner of KJ Walk, presented an overview of the request. Mr. Israelson indicated that D. R. Horton is proposing to purchase the North Creek lots which will include split level, single family homes and slab on grade townhomes for empty nesters. Planning Commission Meeting Minutes, June 6, 2019 Page 2 Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that the development site consists of five parcels on approximately 88 acres. The North Creek preliminary plat area is zoned RM-1 and is proposing single family homes and detached townhomes, which are both permitted in this zoning district. Ms. Jenson indicated that all of the single family lots meet the lot area, width and depth requirements, along with the setback requirements of the RM-1 District. The proposed townhouse unit lots have sufficient area to accommodate the detached townhome units. The builder will offer multiple house plans for the detached townhome dwellings, which are shown in Exhibit Q of the May 30, 2019 planning report. Ms. Jenson reviewed the exterior material options that will be available. The options all meet Zoning Ordinance requirements. Due to the proposed detached townhomes being slab on grade units, provisions will be made to provide storm protection internally to the unit by the builders as required by the Zoning Ordinance. Each detached townhome unit must provide landscaping at the immediate perimeter of the unit and include inground irrigation systems with an automatic controller. North Creek will be developed in two phases. The first phase will include the detached townhomes and 33 single family lots. The second phase will include the remaining 47 single family lots. The May 30, 2019 planning report gives a summary of proposed streets for the North Creek preliminary plat. The tree preservation plan, wetlands, park dedication and sidewalks/trails are also reviewed in the May 30, 2019 planning report. Ms. Jenson stated that Planning Department staff recommends approval of the North Creek preliminary plat, subject to the 14 stipulations listed in the May 30, 2019 planning report. Chair Kaluza opened the hearing to the public for comment. Rhett Zabel, 17857 Element Avenue Mr. Zabel indicated that 179th Street runs along their backyard. He was curious about the potential plans for the green space shown on the location map (Exhibit A) immediately north of his property. He also wanted to know if there is a plan for a park in the area. Motion was made by Kelvie, seconded by Lillehei to close the public hearing at 6:10 p.m. Voice vote was taken on the motion. Ayes - unanimous Planning Commission Meeting Minutes, June 6, 2019 Page 3 Chair Kaluza asked for comments from the Planning Commission. Discussion points included: • Mr. Israelson addressed the public comment. He stated that KJ Walk owns the property to the north of Mr. Zabel’s home. It was originally a sewage treatment facility and subsequently a yard waste compost facility. It is being shown as a ghost plat currently because they are doing Phase II environmental testing on the site. He is anticipating the development of detached townhomes similar to North Creek on this property. • Staff addressed the future neighborhood park, greenway corridor trail and park dedication requirements for this area and the North Creek plat. • There was a discussion regarding the Pilot Knob Road (CSAH 31) and 173rd Street intersection and spacing guidelines. • Mr. Israelson confirmed that he understands the Zoning Ordinance requirement for slab on grade buildings to provide a storm shelter. Motion was made by Swenson, seconded by Lillehei to recommend to City Council approval of the North Creek preliminary plat of 80 single family residential lots and 42 detached townhome lots located east of Pilot Knob Road (CSAH 31) and south of 173rd Street, subject to the following 14 stipulations: 1. Implementation of the recommendations listed in the May 30, 2019 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct 5 foot wide concrete sidewalks along one side of all streets. The developer shall construct a bituminous trail within the Dakota County greenway property east of the development and provide a security for the future construction of a trail along the east side of Pilot Knob Road. 4. Outlots A, B, and C shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting Pilot Knob Road must install sod to the rear property line and a $1,000 per lot security will be required with the building permit. Prior to City Council consideration of the preliminary plat, the landscape plan must be modified to supplement the overstory trees with shrubs such that the buffer yard contains a continuous band of plants. 6. The following lots shall have restricted driveway access: • Lot 1, Block 1 and Lot 1, Block 2 shall have driveway access from Encina Path. • Lots 3-10, Block 2 shall have driveway access from Ely Avenue. 7. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 8. The existing house, accessory structures, fence, well, and septic system must be removed with the development of this property. 9. A homeowner’s association must be established for ownership and maintenance of Lot 15, Block 5, Lot 22, Block 6, and Lot 8, Block 7. Planning Commission Meeting Minutes, June 6, 2019 Page 4 10. Detached townhomes must meet the exterior materials requirements of Section 11-58-21c.4 of the Zoning Ordinance. 11. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. 12. Each detached townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21D of the Zoning Ordinance. 13. Each detached townhome unit shall provide storm protection as required in Section 11-17-27 of the Zoning Ordinance. 14. The developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21K of the Zoning Ordinance. Ayes: Swenson, Kelvie, Lillehei, Kaluza, Witte, Drotning Nays: 0 There being no further business, the meeting was adjourned at 6:20 pm. The Planning Commission immediately went into their scheduled work session. Respectfully submitted, Penny Brevig, Recording Secretary Parks, Recreation & Natural Resources Committee Meeting Minutes, June 5, 2019 Page 2 4. North Creek Preliminary Plat The plat consists of 80 single family residential lots on approximately 88 acres east of Pilot Knob and south of 173rd Street. A Tree Preservation Plan has been submitted, of the 367 trees located on the site, 132 will remain intact and removals will be primarily along the perimeter of the homestead. There will be no impact to wetlands with this development. The Park Dedication fee will include a 3.06-acre land dedication for a neighborhood park in addition to a cash contribution. A segment of the North Creek Regional Greenway will also be constructed on a corridor owned by Dakota County. Motion made by Nick Thompson, seconded by Lindsay Haneman to recommend to City Council approval of the North Creek Preliminary Plat subject to the recommendations as presented by City staff. Ayes: unanimous 5. Other Business None. 6. Announcements Next meeting would be set for June 19. 7. Adjourn: Meeting adjourned at 6:26 p.m. Respectfully submitted, Stella Eskelson, Recording Secretary City of Lakeville Planning Department Memorandum To: Planning Commission From: Kris Jenson, Associate Planner Date: May 30, 2019 Subject: Packet Material for the June 6, 2019 Planning Commission Meeting Agenda Item: North Creek preliminary plat. Action Deadline: August 24, 2019 BACKGROUND KJ Walk, Inc. has applied for a preliminary plat to allow the development plat of 80 single family residential lots and 42 detached townhome lots on 87.78 acres to be known as North Creek. The North Creek preliminary plat is located east of Pilot Knob Road (CSAH 31) and south of 173rd Street. The North Creek preliminary plat plans have been distributed to Engineering Division and Parks and Recreation Department staff, and the Parks, Recreation and Natural Resources Committee. EXHIBITS A. Aerial Photo Map B. Existing Zoning Map C. Cover Sheet D. Preliminary Plat West E. Preliminary Plat East F. Preliminary Plat South G. Preliminary Grading (Overall) H. Preliminary Grading West I. Preliminary Grading East J. Erosion Control West K. Erosion Control East L. Landscape Plan M. Tree Preservation Plan N. Preliminary Utilities West O. Preliminary Utilities East P. Phasing Plan Q. Exterior Elevation Examples (5 pages) 2 R. Foundation Planting Plans (2 pages) S. Plat Commission Letter PLANNING ANALYSIS PRELIMINARY PLAT Existing Conditions. The development site consists of five parcels. The use on the property has been primarily undeveloped agricultural land as well as a house, fence, sheds, well, and septic on the property, which must be removed with the development of the site. (Exhibit A). Consistency with the Comprehensive Plan. The North Creek property is located in Planning District 11 of the 2008 Comprehensive Plan, which guides the subject property for medium density residential development where city sewer is available. The subject property is located in Planning District 3 of the proposed 2040 Comprehensive Plan. Planning District 3 guides the subject property for low/medium density residential development where city sewer is available. Zoning and Adjacent Land Uses. The North Creek preliminary plat area is currently zoned RM-1 (Exhibit B). The developer proposes to construct single-family homes and detached townhomes, both of which are a permitted use within the RM-1 District. Adjacent land uses and zoning are as follows: North – 173rd St, townhomes (RM-2 District) East – Dakota County Greenway, Tributary No. 1 to North Creek, single family homes (RM-1 District) South –Single Family Homes (RM-1) West – Pilot Knob Road, Manufactured Home Park (RSMH) Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer and water improvements for the area of North Creek will be financed and constructed by the developer. The development costs associated with the North Creek development are not programmed in the 2019– 2023 CIP. Premature Subdivision Criteria. A preliminary plat may be deemed premature if any of the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans (discussed above). Staff review of the North Creek preliminary plat against these criteria finds that it is not a premature subdivision. Density/Average Lot Size. The North Creek preliminary plat consists of 80 single family lots and 42 detached townhome lots on 87.78 acres. This results in a gross density of 1.39 units per acre. Excluding arterial street right-of-way, wetland/park area, stormwater management ponds, and future development outlots, the net density is 2.96 units per acre. 3 SINGLE FAMILY LOT REQUIREMENTS Lots/Blocks. The following minimum single-family lot size requirements of the RM-1, Multiple Family Residential District pertain to the North Creek preliminary plat: Lot Area (Interior) Lot Area (Corner) Lot Width (Interior) Lot Width (Corner) Lot Dept (Abutting Pilot Knob Rd) RM-1 8,400 s.f. 10,200 s.f. 70 feet 85 feet 150 feet Single family lot sizes within the North Creek preliminary plat range from 8,750 square feet to 21,881 square feet in area. All of the single family lots meet the lot area, width and depth requirements of the RM-1 District. Setbacks. The following minimum requirements for single family building setbacks in the RM-1 District pertain to the North Creek preliminary plat: Front Yard Side Yard (Interior) Side Yard (Corner) Rear Yard Rear Yard (Buffer) RM-1 20 feet (house) 25 feet (garage) 7 feet 20 feet 30 feet 50 feet The proposed house pads shown on the North Creek grading, drainage and erosion control plan indicate that all 80 single-family lots have adequate building pad areas that meet setback requirements for principal structures. DETACHED TOWNHOME DEVELOPMENT STANDARDS Lot Requirements. The following minimum requirements for detached townhome building setbacks in the RM-1 District pertain to the North Creek preliminary plat: Base Lot Between Buildings (Detached Units) Front Yard (to ROW) RM-1 30 feet 14 feet 20 feet (front) 25 feet (garage) The proposed unit lots shown on the North Creek preliminary plat have sufficient area to accommodate detached units. A homeowner’s association will be required to be established for ownership and maintenance of Lot 15, Block 5, Lot 22, Block 6, and Lot 8, Block 7. The RM-1 District requires at least 5,000 square feet per unit. The North Creek Preliminary plat has an average of 11,676 square feet per unit for the detached 4 townhomes area, which exceeds the minimum lot area per unit requirements of the RM-1 District. Building Design. The proposed builder will offer multiple house plans for the detached townhome dwellings, as shown in Exhibit Q. Exterior Materials. Each house plan includes several options for the front elevation, which provides the opportunity for variety within the neighborhood (Exhibit Q). Each unit must meet the requirements of Section 11-58-21c.4, which requires that a minimum of 25% of the area of each elevation of the unit must have an exterior finish of brick, stucco, and/or natural or artificial stone. Except for brick, stucco, and/or natural or artificial stone, no single elevation may have more than 75% of one type of finish or have more than 60% of all elevation of one type of finish. The City has deemed the use of cement fiberboard material as satisfying the minimum masonry material requirement and is therefore also allowed to exceed the maximum area limit for non-masonry materials. Floor Area. The developer must submit dimensioned floor plans for the detached townhome units, to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. Garage Area. The submitted building elevations indicate that there will be options for a three stall attached garage, provided the unit lot has the necessary width. Because the proposed detached townhome units are proposed to be slab on grade, the minimum are of each garage must be at least 540 square feet. Each garage must have a minimum width of 20 feet. Storm Shelters. Because all of the proposed detached townhomes will be slab on grade units, provisions shall be made to provide storm protection internally to the unit. Landscaping. Each detached townhome unit must provide landscaping at the immediate perimeter of the unit. Exhibit R illustrates the proposed foundation planting plans for the detached units. All landscaped areas including common open space and public right of way, must have an inground irrigation system with an automatic controller. With the final plat, the Developer must provide information that the landscaping of the detached townhome units meets the requirements of Section 11-58-21K. Residential Buffer Yard Requirements. Twelve (12) lots abutting Pilot Knob Road require increased buffer yard lot sizes and setbacks in the North Creek preliminary plat. Pilot Knob Road is classified as a minor arterial in the Comprehensive Transportation Plan. The buffer yard screening must provide an effective minimal visual screen to a height of 10 feet. The landscape plan includes the installation of 51 eight-foot tall coniferous trees and seven 2 ½ inch caliper overstory trees on a two-foot berm along the Pilot Knob Road buffer yard areas. (Exhibit L). The landscape plan must be modified to supplement the overstory trees with shrubs such that the buffer yard contains a continuous band of plants. The lots abutting Pilot Knob Road must install sod to the rear property line. A $1,000/lot security will be required with the building permit. 5 Outlots. There are four outlots totaling 46.55 acres in the North Creek preliminary plat. The use of the proposed outlots will be as follows: Outlot A – 1.90 acre outlot consisting of a stormwater management basin that will be deeded to the City with the final plat. Outlot B – 7.52 acre outlot consisting of a creek, wetland, wetland buffer areas, and a future neighborhood park that will be deeded to the City with the final plat. Outlot C – 0.91 acre outlot consisting of wetlands and buffer areas that will be deeded to the City. Outlot D – 36.22 acre outlot for future residential development to be retained by the developer. Phasing. North Creek will be developed in two phases. The first phase of development includes all of the detached townhomes and 33 single family lots and will be the areas along Ely Avenue and Elkwood Avenue, and 175th Street east of Ely Avenue. The second phase of development will be the remaining 47 single family homes along Encina Path, 174th Street, and 175th Street west of Ely Avenue. The phasing plan is shown on Exhibit P. Signs. No subdivision identification monument signs are proposed with the North Creek preliminary plat. Streets. The following is a summary of streets proposed with the North Creek preliminary plat. Additional detailed information is outlined in the Engineering Division memorandum dated May 30, 2019. Pilot Knob Road (CSAH 31) – Pilot Knob Road is west of and adjacent to the property and is classified as a minor arterial in the Comprehensive Transportation Plan. Pilot Knob Road adjacent to the plat requires a 142-foot half right-of-way, which is being dedicated by the developer. This complies with the Dakota County Plat Needs Map. 173rd Street – 173rd Street is a minor collector along the north boundary of the site. 173rd Street is a 40-foot wide street within an 80-foot-wide right of way. No additional right of way is required to be platted for 173rd Street. The preliminary plat plans must be modified to include a five-foot sidewalk to be constructed on the south side of 173rd Street to connect to the five-foot sidewalk to be constructed with the Wild Wings development. 174th Street – 174th Street will be a residential street constructed within a 60-foot right- of-way and a 32-foot-wide street with a 5-foot-wide concrete sidewalk along the north side of the street. 175th Street – 175th Street will be a residential street constructed within a 60-foot-wide right-of-way and a 32-foot-wide street. East of Elkwood Avenue it will end in a permanent cul-de-sac. Between Encina Path and Elkwood Avenue a 5-foot-wide concrete sidewalk will be located on the north side of the street. Elkwood Avenue – Elkwood Avenue will be a residential street constructed within a 60- foot-wide right-of-way and a 32-foot-wide street with a 5-foot-wide concrete sidewalk along the west side of the street. 6 Ely Avenue – Ely Avenue will be a residential street constructed within a 60-foot-wide right-of-way and a 32-foot-wide street with a 5-foot-wide concrete sidewalk along the south and west sides of the street. Lots 3-10, Block 2 shall have driveway access from Ely Avenue. Encina Path – Encina Path will be a residential street constructed within a 60-foot-wide right-of-way and a 32-foot-wide street with a 5-foot wide concrete sidewalk along the east side of the street. Lot 1, Block 1 and Lot 1, Block 2 shall have driveway access from Encina Path. All streets meet the minimum width and design requirements of the Subdivision Ordinance. Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage, erosion control, and utilities for the North Creek preliminary plat is shown on the grading, drainage and erosion control and utility plans. All existing and new local utilities shall be placed underground. Grading, drainage, erosion control, and utilities details are outlined in the May 30, 2019 engineering report prepared by Christina Orlowsky, Civil Engineer and Mac Cafferty, Environmental Resources Manager. The Engineering Division recommends approval of the preliminary plat. Tree Preservation. There are 367 significant trees located within the North Creek preliminary plat boundaries. The tree preservation plan proposes to save 132 (35.96%) of the significant trees on site. A tree preservation plan (Exhibit M) was submitted by the developer. Mac Cafferty, Environmental Resources Manager has reviewed the tree preservation plan. His comments are included in the May 30, 2019 engineering report. Wetlands. A wetland delineation has been completed and the information and data has been incorporated into the preliminary plat plans. There are no wetland impacts proposed with this development. Mac Cafferty has reviewed the wetland delineation report. His comments are included in the May 30, 2019 engineering report. Park Dedication. The City’s 2015 Parks, Trails, and Open Space Plan designates the area south of 170th Street and east of Pilot Knob Road as the location of a future neighborhood park in close proximity to or integrated with the North Creek Regional Greenway. A portion of Outlot B (3.06 acres) is being dedicated as park land for a future neighborhood park adjacent to the North Creek Greenway corridor trail along the east property line of the preliminary plat. The trail will be constructed on Dakota County property with the final plat by the Developer. The Parks, Recreation and Natural Resources Committee will review the preliminary plat at their June 2, 2019 meeting. Their comments will be forwarded to the Planning Commission at the public hearing. Sidewalks/Trails. The developer will construct 5-foot-wide concrete sidewalks along one side of all streets in the development. The City’s 2015 Parks, Trail and Open Space Plan identifies bituminous trails along Pilot Knob Road and within the future greenway corridor. A bituminous trail will be constructed by the developer within the North Creek Greenway property owned by Dakota County and a cash escrow provided by the developer for the future trail along the east side of Pilot Knob Road. 7 MUSA. The North Creek preliminary plat area is located within the current MUSA. Ghost Plat. A ghost plat for the future development parcel (Outlot D) has not been submitted at this time as the developer has prepared a preliminary plat for the property. That preliminary plat is on hold as the developer focuses on the North Creek preliminary plat process. Overhead Utilities. A private overhead electric line and pole are located along the west property boundary. The developer will be required to place these utilities underground as a part of the improvements on the site. A security will be required to guarantee that the work is completed. Plat Commission. The Dakota County Plat Commission reviewed and approved the preliminary plat at their October 15, 2018 meeting. The Plat Commission letter is included as Exhibit S. RECOMMENDATION Planning Department staff recommends approval of the North Creek preliminary plat subject to the following stipulations: 1. Implementation of the recommendations listed in the May 30, 2019 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct 5-foot-wide concrete sidewalks along one side of all streets. The developer shall construct a bituminous trail within the Dakota County greenway property east of the development and provide a cash escrow for the future construction of a trail along the east side of Pilot Knob Road. 4. Outlots A, B, and C shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting Pilot Knob Road must install sod to the rear property line and a $1,000 per lot security will be required with the building permit. At the time of final plat submittal, the landscape plan must be modified to supplement the overstory trees with shrubs such that the buffer yard contains a continuous band of plants. 6. The following lots shall have restricted driveway access: • Lot 1, Block 1, and Lot 1, Block 2 shall have driveway access from Encina Path. • Lots 3-10, Block 2 shall have driveway access from Ely Avenue. 7. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 8. The existing house, accessory structures, fence, well, and septic system must be removed with the development of this property. 8 9. A homeowner’s association must be established for ownership and maintenance of Lot 15, Block 5, Lot 22, Block 6, and Lot 8, Block 7. 10. Detached townhomes must meet the exterior materials requirements of Section 11-58-21c.4 of the Zoning Ordinance. 11. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. 12. Each detached townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21D of the Zoning Ordinance. 13. Each detached townhome unit shall provide storm protection as required in Section 11-17-27 of the Zoning Ordinance. 14. The developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21K of the Zoning Ordinance. ± North Creek Preliminary Plat area 179TH ST 173RD ST 172ND ST 173RD ST PILOTKNOBRD(CSAH31)EAGLEVIEW DR City of LakevilleLocation Map North Creek Preliminary Plat LocationEXHIBIT A ± Preliminary Plat area 179TH ST 173RD ST 172ND ST PILOTKNOBRD(CSAH31)EAGLEVIEW DR RM-2 RSMH RM-1 RM-1 RM-1 RM-1 RM-2 RS-3 RS-2 P/OS P/OS City of LakevilleZoning Map North Creek Preliminary PlatEXHIBIT B I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetCoverRegistration #: 51362SHEET 1 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg02/05/19OriginalOWNER / DEVELOPER / DESIGNER:KJ Walk, Inc.Luke Israelson, PEReg #: 513626001 Egan Drive, Suite 100Savage, MN 55378(952) 226-3200luke@kjwalk.comwarren@kjwalk.comNORTH CREEKSHEET INDEX1 - Cover2 - Preliminary Plat Northwest3 - Preliminary Plat Northeast4 - Preliminary Plat South5 - Preliminary Grading6 - Preliminary Grading West7 - Preliminary Grading East8 - Erosion Control West9 - Erosion Control East10 - SWPPP11 - Landscaping12 - Tree Preservation Plan13 - Preliminary Utilities West14 - Preliminary Utilities East0150300450Legend Existing watermainProposed watermainExisting sanitaryProposed sanitaryExisting stormProposed stormExisting hydrantProposed hydrantExisting gate valveProposed gate valveExisting manholeProposed manholeProposed catchbasinSilt fence5' SidewalkBituminous pathExisting treeGOPHER STATE ONE CALL: 651.454.0002 - CALL 48 HRS BEFORE EXCAVATIONContactsDeveloper/KJ Walk, Inc.Luke IsraelsonEngineer/6001 Egan Drive, Ste 100952.826.9068ContractorSavage, MN 55378CityCity of LakevilleZachary Johnson20195 Holyoke Avenue952.985.4400Lakeville, MN 55044Charter16900 Cedar Ave. SouthTyler NelsonCommunicationsRosemount, MN 55068651.318.8975Dakota Electric4300 220th Street WestRick SiebenalerFarmington, MN 55024651.463.6373Frontier14450 Burnhaven DriveJames LancasterCommunicationsBurnsville, MN 55306952.435.4661MN Energy2665 145th Street WestAlan BraithResources Corp.PO Box 455651.322.8932Rosemount, MN 55068Gigabit 656 Mendelssohn Ave NMinnesotaGolden Valley, MN 55427651.888.4444Revised09/28/1805/07/19Revised Per City CommentsMay 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Plat (West)Registration #: 51362SHEET 2 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg5'7'10' 30'25' 10'ROWTYPICAL SINGLE FAMILY LOTSETBACKS AND EASEMENTSROW20'HOUSE SETBACK GARAGE SETBACK20'10'10' 30'25' 10' 20'HOUSE SETBACK GARAGE SETBACK ROWSITE DATATOTAL SITE AREA3,823,871.04 SQ FT87.784 AC.RIGHT OF WAY AREA (PILOT KNOB)6.699 AC.OUTLOT D36.221 AC.GROSS DEVELOPMENT AREA(TOTAL - PILOT KNOB - OUTLOT D)44.894 AC.RIGHT OF WAY AREA (LOCAL STREET)7.171 AC.WETLAND AREA3.768 AC.WETLAND/CREEK BUFFER AREA1.497 AC.NET DEVELOPABLE AREA(GROSS DEV. AREA - ROW - WETLAND - BUFFER)32.458 AC.SINGLE FAMILY LOTS80 LOTSDETACHED TOWNHOMES42 LOTSUNIT DENSITYGROSS2.72 UNITS PER AC.NET3.76 UNITS PER AC.SINGLE FAMILY LOT REQUIREMENTS (RS-4)MIN. LOT AREA - INTERIOR LOTS8,400 S.F.MIN. LOT WIDTH AT SETBACK - INTERIOR LOTS70 FEETMIN. LOT AREA - CORNER LOTS10,200 S.F.MIN. LOT WIDTH AT SETBACK - CORNER LOTS85 FEETMIN. LOT DEPTH - DOUBLE FRONTAGE150 FEETZONING CLASSIFICATION RM1SINGLE FAMILY MINIMUM SETBACKS (RS-4)FRONT25 FEETSIDE (HOUSE/GARAGE) 7 FEETSIDE (STREET)20 FEETREAR30 FEETREAR (Pilot Knob Road)50 FEETTOWNHOMES MINIMUM SETBACKS (RM-1)ROW TO FRONT 25 FEETBETWEEN BLDGS14 FEETSIDE (STREET)20 FEETREAR30 FEET30'25' 10'ROWTYPICAL DETACHED TOWNHOME LOTSETBACKS AND EASEMENTSROW20'10'10' 30'25'ROW14'50'40'0501001505'7'5'7'SEE SHEET 3 OF 13 OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Plat (East)Registration #: 51362SHEET 3 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150SEE SHEET 2 OF 13OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Plat (West)Registration #: 51362SHEET 4 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary GradingRegistration #: 51362SHEET 5 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg0100200300OriginalRevised09/28/1802/05/19Revised Ponding and Outlet03/26/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Grading (West)Registration #: 51362SHEET 6 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150OriginalRevised09/28/1802/05/19Revised Ponding and Outlet03/26/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Grading (East)Registration #: 51362SHEET 7 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150OriginalRevised09/28/1802/05/19Revised Ponding and Outlet03/26/19Revised Per City CommentsMay 20, 201905/07/19Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetErosion Control (West)Registration #: 51362SHEET 8 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150CB & DROP IN INLET PROTECTORSSEED & BLANKETLEGEND RIP RAPSILT FENCENOTES:MAXIMUM ALLOWABLE SLOPE 3:1PONDS MAY BE USED AS TEMPORARY SEDIMENTATIONBASINS DURING CONSTRUCTION, IF A POND IS USED AS ATEMP. SED. BASIN IT MUST BE CLEANED OUT PRIOR TOBEING PUT INTO SERVICE.DRAINAGE TO THE TEMPORARY SEDIMENTATION BASINSMUST BE MAINTAINED THROUGHOUT THE CONSTRUCTIONPROCESS.- MN DOT MIX 250(70LBS/AC) USED IN RIGHT OF WAY- MN DOT MIX 325(84LBS/AC) USED ON PONDS BELOW HWL- MN DOT MIX 328(88LBS/AC) USED ON PONDS ABOVE HWLSTOCKPILES TO BE STABILIZED IF NOT UTILIZED FOR MORETHAN 7 DAYS.Silt Fence to be installed along perimeter ofconstruction area prior to the start of work.OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetErosion Control (East)Registration #: 51362SHEET 9 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150CB & DROP IN INLET PROTECTORSSEED & BLANKETLEGEND RIP RAPSILT FENCEOriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetLandscape PlanRegistration #: 51362SHEET 11 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150Evergreen TreesLEGEND NOTES:* TREES MINIMUM 5' FROM PROPERTY LINE* TREES STAGGERED WITH 15' SPACING* TREES ON A 2' MINIMUM BERM1/3 TREE HEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALLTREE HEIGHT IS MEASUREDFROM THE TOP OF THE ROOTBALL TO THE BOTTOM OFTHE LEADERID#COMMON NAMESIZE#BHSBLACK HILLS SPUCE8'-0"29ATARBORVITAE"TECHNY"8'-0"22ASBAUTUMN SPLENDERBUCKEYE2 1/2"7TOTAL581/3 TREEHEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALLDeciduous Trees1-8' ASB3-8' BHS2-8' AT1-8' ASB4-8' BHS3-8' AT1-8' ASB4-8' BHS3-8' AT1-8' ASB4-8' BHS3-8' AT1-8' ASB4-8' BHS3-8' AT1-8' ASB4-8' BHS3-8' AT1-8' ASB4-8' BHS3-8' AT2-8' BHS2-8' ATOriginalRevised09/28/1802/05/19ShrubsRevised Per City CommentsSHRUBSSHRUBS05/07/19May 20, 2019Revised Per City Comments05/20/19 6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetTree Preservation PlanSHEET 12 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg01002003004010ELM224010ELM22EXISTING TREE TO BE SAVEDEXISTING TREE TO BE REMOVEDLEGENDI hereby certify that this plan was prepared by me,or under my direct supervision, and that I am acertified forester.Lawrence Westerberg CF1011TOTAL # TREES306TREES SAVED132TREES REMOVED235OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Utilities (West)Registration #: 51362SHEET 13 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:Revision:Preliminary Plat SetPreliminary Utilities (East)Registration #: 51362SHEET 14 of 14Date: 5/20/2019FILE PATH: D:\Projects\Lakeville\North Creek\Engineering\CAD\DWGs\North Creek Pre-Plat new.dwg050100150OriginalRevised09/28/1802/05/19Revised Per City Comments05/07/19May 20, 2019Revised Per City Comments05/20/19 WWW.DRHORTON.COM | WWW.FACEBOOK.COM/DRHORTON.MINNESOTA THE BAYPORT LOWER LEVEL PLANSLAB PLAN AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE ONE-LEVEL LIVING ONE-LEVEL LIVING WWW.DRHORTON.COM | WWW.FACEBOOK.COM/DRHORTON.MINNESOTA THE BRISTOL LOWER LEVEL PLANSLAB PLAN AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE WWW.DRHORTON.COM | WWW.FACEBOOK.COM/DRHORTON.MINNESOTA THE CLIFTON ONE-LEVEL LIVING LOWER LEVEL PLANSLAB PLAN AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE WWW.DRHORTON.COM | WWW.FACEBOOK.COM/DRHORTON.MINNESOTA THE DOVER ONE-LEVEL LIVING LOWER LEVEL PLANSLAB PLAN AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE WWW.DRHORTON.COM | WWW.FACEBOOK.COM/DRHORTON.MINNESOTA THE MORGAN LOWER LEVEL PLANSLAB PLAN AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE AMERICAN CLASSIC NORTHERN CRAFTSMAN HEARTLAND COTTAGE ONE-LEVEL LIVING D.R. Horton - Freedom Series (North/East) D.R. Horton - Freedom Series (South & West) Dakota County Surveyor’s Office Western Service Center  14955 Galaxie Avenue  Apple Valley, MN 55124 952.891-7087  Fax 952.891-7127  www.co.dakota.mn.us October 16, 2018 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: NORTH CREEK The Dakota County Plat Commission met on October 15, 2018, to consider the preliminary plat of the above referenced plat. The plat is adjacent to CSAH 31 (Pilot Knob Rd.), and is therefore subject to the Dakota County Contiguous Plat Ordinance. The property is located in the southeast corner of CSAH 31 and 173rd Street West (city street). The proposed development includes residential lots consisting of single-family and townhome lots. The right-of-way needs for a 6-lane divided roadway for CSAH 31 are 100 feet of half right of way from existing centerline. Access to this site is via 173rd Street West. No access is shown along CSAH 31; therefore, restricted access should be shown along all of CSAH 31. The Plat Commission mentioned the concern with Lot 1, Block 1 and access to the site. A driveway access to 173rd Street West would be too close to CSAH 31. The Plat Commission recommended reconfiguring the lots to remove the Lot 1 driveway from 173th Street West. The Plat Commission has approved the preliminary plat provided that the described conditions are met. The Ordinance requires submittal of a final plat for review by the Plat Commission before a recommendation is made to the County Board of Commissioners. Traffic volumes on CSAH 31 are 23,200 ADT and are anticipated to be 39,000 ADT by the year 2030. These traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded for the proposed plat. Residential developments along County highways commonly result in noise complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this development. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process which reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson Secretary, Plat Commission c: City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Associate Planner From: Christina Orlowsky, Civil Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Date: May 30, 2019 Subject: North Creek • Preliminary Plat Review • Preliminary Erosion and Sediment Control Plan Review • Preliminary Grading and Drainage Plan • Preliminary Utility Plan Review • Preliminary Tree Preservation Plan Review BBAACCKKGGRROOUUNNDD KJ Walk, Inc. has submitted a preliminary plat named North Creek. The proposed subdivision is located south of and adjacent to 173rd Street, east of and adjacent to Pilot Knob Road (CSAH 31), north and west of and adjacent to two Vermillion River Watershed Joint Powers Organization (VRWJPO) principal connectors (Tributary No. 1 to North Creek and North Creek). The parent parcel consists of PID Nos. 220120050032, 220120025032, 228415000040, 220120050013 and 220120050019 all zoned RM-1. The preliminary plat consists of eighty (80) single family lots, forty-two (42) detached townhome lots, and three (3) Homeowners Association (HOA) common lots within seven (7) blocks and four (4) outlots on 87.78 acres. The outlots created with the preliminary plat shall have the following uses: Outlot A: Stormwater management basin; to be deeded to City (1.90 acres) NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 22 OOFF 77 Outlot B: Creek, wetland and buffer areas, and future neighborhood park; to be deeded to the City (7.52 acres) Outlot C: Wetlands and buffer areas; to be deeded to the City (0.91 acres) Outlot D: Retained by the property owner for future development (36.22 acres) The proposed development will be completed by: Developer: KJ Walk, Inc. Engineer/Surveyor: KJ Walk, Inc. SSIITTEE CCOONNDDIITTIIOONNSS The North Creek site consists of five metes and bounds parcels totaling 87.78 acres and is roughly bisected by North Creek, which runs through the property from the northwest to the southeast. The parcel primarily consists of undeveloped, cultivated agricultural land. There is an existing house and farmstead, fence, sheds, well and septic on the property that must be removed with the development of the site. EEAASSEEMMEENNTTSS A Permanent Drainage, Utility and Stormwater Ponding Easement exists over and along the North Creek drainageway (Document No. 1629250). The area of the easement will be deeded as Outlot B to the City. The existing Sanitary Sewer Metropolitan Council Easement (Document No. 425283) will not be impacted and will remain with the development. The Developer is responsible for coordinating improvements in the easement with the Metropolitan Council. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Pilot Knob Road (CSAH 31) North Creek is located east of and adjacent to Pilot Knob Road, a minor arterial County highway, as identified in the City’s Transportation Plan. Pilot Knob Road adjacent to the site is a four-lane divided rural roadway. The current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and designates it as a future six-lane divided urban roadway over its entire length adjacent to the plat. The expansion of Pilot Knob Road to a six-lane roadway is not identified in the City’s or County’s current Capital Improvement Plans. The Developer is dedicating 142 feet of right-of-way along Pilot Knob Road with the plat. The preliminary plat was reviewed and recommended for approval by the Dakota County Plat Commission at its October 15, 2018 meeting. There will be no access to the development from Pilot Knob Road. Existing driveways and farm access from Pilot Knob Road will be removed with the plat. NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 33 OOFF 77 173rd Street North Creek is located south of and adjacent to 173rd Street, a minor collector as identified in the City’s Transportation Plan. The City of Lakeville Transportation Plan identifies 40-foot ½ right-of-way needs along the entire length of the plat. The necessary right-of-way was previously dedicated with the Cornerstone Lake 4th Addition Subdivision. No additional right- of-way is required. A 5-foot concrete sidewalk shall be constructed by the Developer on the south side of 173rd Street and connect to the sidewalk to be constructed with Wild Wings, the development to the east. 174th Street The development of North Creek includes the construction of 174th Street, a local street. 174th Street is designed as a 32-foot wide, two-lane urban roadway with a 5-foot concrete sidewalk along the north side of the street. The Developer is dedicating 60-feet of right-of-way in compliance with City ordinance requirements. 175th Street The development of North Creek includes the construction of 175th Street, a local street. 175th Street is designed as a 32-foot wide, two-lane urban roadway terminating in a permanent cul- de-sac with a 5-foot concrete sidewalk along the north side of the street. The Developer is dedicating 60-feet of right-of-way in compliance with City ordinance requirements. Encina Path Development of North Creek includes the construction of Encina Path, a local street which will be extended south from 173rd Street. Encina Path is designed as a 32-foot wide, two-lane urban roadway with a 5-foot concrete sidewalk along the east side of the street. The Developer is dedicating 60-feet of right-of-way in compliance with City ordinance requirements. Ely Avenue The development of North Creek includes the construction of Ely Avenue, a local street. Ely Avenue is designed as a 32-foot wide, two-lane urban roadway with a 5-foot concrete sidewalk along the east and south side of the street. The Developer is dedicating 60-feet of right-of-way in compliance with City ordinance requirements. Elkwood Avenue Development of North Creek includes the construction of Elkwood Avenue, a local street which will be extended south from 173rd Street. Elkwood Avenue is designed as a 32-foot wide, two-lane urban roadway with a 5-foot concrete sidewalk along the west side of the street. The Developer is dedicating 60-feet of right-of-way in compliance with City ordinance requirements. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility, and street construction shall be through a rock construction entrance on Encina Path south of 173rd Street. NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 44 OOFF 77 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS Development of North Creek includes the construction of public sidewalks along the east side of Encina Path, south and west sides of Ely Avenue, north side of 174th Street, north side of 175th Street, and the west side of Elkwood Avenue. A 5-foot concrete sidewalk shall be constructed by the Developer on the south side of 173rd Street and connect to the sidewalk to be constructed with Wild Wings, the development to the east. The Developer will be reimbursed for the cost of the sidewalk within the County parcel. The parks and trails within North Creek are to be developed to allow for connection to other local and regional facilities as part of the City’s overall Parks, Trails and Open Space System Plan. Pilot Knob Road adjacent to the plat is currently a rural roadway section, therefore a cash escrow for the future construction of a ten-foot trail along the east side of Pilot Knob Road adjacent to the plat will be required with the final plat. The North Creek preliminary plat identifies 3.06 acres of park area to be dedicated to the City and a ten-foot trail along the east side of the plat. The park dedication requirement for the parent parcels has not been collected and will be satisfied through a combination of land dedication and cash. The total park area required with the preliminary plat is 4.93 acres, which is calculated as 12% of the net area of the property (excluding arterial right-of-way and wetlands to remain) estimated as follows: Gross Area of Preliminary Plat 87.78 Acres Less Pilot Knob Road Right-of-way 6.70 Acres Less Wetland Area 3.77 Acres Less Outlot D 36.22 Acres Total Buildable Area 41.09 Acres Land Dedication Requirement (12%) 4.93 Acres The total park area estimated to be dedicated within the preliminary plat is 3.06 acres. This satisfies an estimated 62.07% or 75.73 lots of the required park dedication for the preliminary plat. The park dedication requirement for the remaining 37.93% or 46.27 lots will be required to be paid with cash with the final plat. Only the area outside of wetlands, wetland buffers, VRWJPO corridors and buffers, stormwater basins, and arterial road right-of-way is to be credited or compensated for park dedication purposes. The final amount of park land to be dedicated will be calculated with the final plat. Development of North Creek includes the construction of a ten-foot trail along the east side of the plat consistent with the Dakota County North Creek Greenway Master Plan. The trail is to be constructed with the final plat by the Developer on Dakota County property east of the plat. Design of the trail must be reviewed and approved by the City and Dakota County. The cost of trail construction will be reimbursed by the City with the final plat. NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 55 OOFF 77 UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR North Creek is located within subdistricts NC-20010, NC-200020, NC-200021 and NC-200030 of the North Creek sanitary sewer district as identified in the City’s Comprehensive Sewer Plan. The Developer is proposing to direct all wastewater from the preliminary plat through the NC-20010 subdistrict; the City has reviewed this proposal and determined that the downstream facilities have sufficient capacity to serve the proposed subdivision. The Developer will make a direct sanitary sewer connection to the existing Metropolitan Council trunk sanitary sewer manhole. Sanitary sewer will be extended from the existing 42- inch Metropolitan Council trunk sanitary sewer within the subdivision to provide sewer service to the development. Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall be paid with the final plat. The fee will be based on the current rate in effect at the time of final plat approval. WWAATTEERRMMAAIINN Development of North Creek includes the extension of 8-inch watermain within the subdivision. Watermain to serve the lots within North Creek will be extended from the existing 12-inch trunk watermain in 173rd Street along both Encina Path and Elkwood Avenue. The Lateral Watermain Access Charge is due for the portion of 12-inch watermain within Pilot Knob Road right-of-way and shall be paid with the final plat. The Lateral Watermain Access Charge will be based on the rate in effect at the time of final plat approval. OOVVEERRHHEEAADD LLIINNEESS An overhead electric transmission line and poles are located along the east side of Pilot Knob Road on the parent parcels servicing the existing house and farmstead. The Developer is required to remove the poles and place the utilities underground with the final plat, consistent with the City’s Public Ways and Property Ordinance. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG North Creek is located within subdistricts NC-1, NC-18, NC-8, and NC-20 of the North Creek stormwater district as identified in the City’s Water Resources Management Plan. Development of North Creek includes the construction of a public stormwater management basin within Outlot A, which will be deeded to the City with the final plat. The basin will provide water quality treatment, volume and rate control of the stormwater runoff generated from the North Creek subdivision. The stormwater basin design is consistent with City requirements. The stormwater basins will discharge to Tributary No.1 to North Creek, which is east of and adjacent to the preliminary plat. NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 66 OOFF 77 The development of North Creek includes lots adjacent to the VRWJPO principal connector North Creek. The 100-yr Flood elevation as determined by the City’s stormwater model will be contained within the rear-yard drainage and utility easements. Lots 12-25 of Block 1 and Block 7 are the areas impacted by the 100-yr Flood elevations. Natural Area signs will be placed along easement lines impacted by the 100-yr Flood elevations. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. North Creek contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR Development of North Creek includes the construction of public storm sewer systems. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basin located within Outlot A and convey runoff from rear yard lots to the VRWJPO principal connector North Creek. Draintile construction is required in areas of non-granular soils within North Creek for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the developer’s responsibility to install and finance. The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must be paid with the North Creek final plat. The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlots A, B and C to the City, consistent with City policy, excluding areas already encumbered by a Drainage and Utility easement . Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. FEMA FLOODPLAIN ANALYSIS A portion of the North Creek preliminary plat (proposed to be platted as Outlot B) is shown on the Flood Insurance Rate Map (FIRM) as Zone AE by the Federal Emergency Management Agency (FEMA). Based on this designation, a portion of the plat is located within a Special NNOORRTTHH CCRREEEEKK –– PPRREELLIIMMIINNAARRYY PPLLAATT MMAAYY 3300,, 22001199 PPAAGGEE 77 OOFF 77 Flood Hazard Area (SFHA), as determined by FEMA. The remainder of the plat is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). WWEETTLLAANNDDSS The wetland delineation for the site was approved on 04/11/2018 the delineation was completed by Kjolhaug Environmental Services. No wetland impacts are proposed with the development. The Developer will be responsible for the installation of the required Natural Area signs. Sign locations will be identified on the final plat plans. All buffer areas that were previously disturbed must be seeded with a native seed mix at is approved by the City and maintained and managed by the developer for 3 years or until established. All required wetlands, creeks and buffers will be placed in City owned outlots with final plat. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan has been submitted. The plan shows a total of 367 significant trees within the site. The plan proposes to save 132 trees (35.96%). EERROOSSIIOONN CCOONNTTRROOLL The Developer is responsible for obtaining an MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to construction. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction should be documented in the SWPPP. The SWPPP for the site must be updated to reflect the new MPCA Construction Permit. The SWPPP must be reviewed and approved prior to any land disturbance. The developer is responsible for the establishment/maintenance of native vegetation within outlots that contain ponding or buffer areas per the 2014 MnDOT Seeding Manual. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the developer. RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the North Creek preliminary plat, grading and erosion control plan, utility plan and tree preservation plan, subject to the requirements and stipulations within this report.