Loading...
HomeMy WebLinkAboutItem 4 Facility Solutions  Efficiency Solutions  Arena Solutions Work Description Location Cost Guaranteed Utility Savings One Time Operational Savings Annual O&M Savings Potential Incentives Net Cost Simple Payback Building & City Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Arts Center $26,642 $1,630 $0 $344 $1,941 $24,702 12.5 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Arts Center $2,368 $200 $0 $0 $0 $2,368 11.8 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Heritage Center $34,006 $1,700 $0 $358 $1,987 $32,019 15.6 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Heritage Center $1,616 $100 $0 $0 $0 $1,616 16.2 Lighting Upgrade - Replace existing lighting with LED Fixtures technology. Park Buildings and Trails $86,312 $6,070 $0 $1,278 $3,000 $83,312 11.3 IT Solutions - Computer Power Management Software All Buildings $8,759 $3,610 $0 $0 $0 $8,759 2.4 City - Sub Total $159,704 $13,310 $0 $1,980 $6,928 $152,777 10.0 City Hall - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) City Hall - No Council Chambers $164,104 $7,900 $0 $1,664 $8,925 $155,179 16.2 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. City Hall $2,556 $160 $0 $0 $0 $2,556 16.0 Window Film - Install new window film on the exterior windows City Hall $17,051 $1,420 $0 $0 $0 $17,051 12.0 Lighting Upgrade - Council Chambers Lighting Upgrade City Hall - Council Chambers Only $82,055 $220 $0 $47 $1,000 $81,055 Capita l Project s City Hall - Sub Total $265,766 $9,700 $0 $1,711 $9,925 $255,841 22.4 Fire Stations - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 1 $24,857 $1,890 $0 $377 $1,494 $23,363 10.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 1 $11,014 $600 $0 $0 $0 $11,014 18.4 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 2 $11,076 $1,140 $0 $228 $1,054 $10,022 7.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 2 $9,210 $470 $0 $0 $0 $9,210 19.6 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 3 $15,374 $1,490 $0 $300 $1,108 $14,266 8.0 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 3 $6,315 $310 $0 $0 $0 $6,315 20.4 Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Fire Station 4 $21,115 $2,390 $0 $492 $2,022 $19,093 6.6 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Fire Station 4 $2,970 $250 $0 $0 $0 $2,970 11.9 FS - Sub Total $101,931 $8,540 $0 $1,397 $5,678 $96,253 9.7 Liquor Stores - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Kenrick Liquor Stores $18,930 $1,340 $0 $281 $1,278 $17,652 10.9 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Kenrick Liquor Stores $3,029 $230 $0 $0 $0 $3,029 13.2 Water Savings - Provide new water savings flushing and sinks for low flow systems Kenrick Liquor Stores $1,339 $110 $0 $9 $0 $1,339 11.2 Lighting Upgrade - Replace existing lighting with LED retrofit technology. Galaxie Liquor Stores $59,780 $4,050 $0 $854 $3,267 $56,513 11.5 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Galaxie Liquor Stores $5,657 $290 $0 $0 $0 $5,657 19.5 Liquor - Sub Total $88,734 $6,020 $0 $1,144 $4,545 $84,189 11.8 Police Department - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Police $128,542 $8,000 $0 $1,684 $9,876 $118,666 12.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Police $7,299 $580 $0 $0 $0 $7,299 12.6 Chilled Water Plant Tanks - Expand the system for a larger chilled water ability Police $123,866 $5,200 $0 $0 $0 $123,866 23.8 Radiant Panels for Offices - Add radiant Panels for the offices - Individual Controls Office Area - Police $60,885 $0 $0 $0 $0 $60,885 N/A PD - Sub Total $320,591 $13,780 $0 $1,684 $9,876 $310,715 20.1 Water Treatment Plant - Improvements Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Water Treatment Plant $73,420 $2,730 $0 $575 $6,492 $66,928 20.3 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Water Treatment Plant $6,496 $350 $0 $0 $0 $6,496 18.6 Boiler Plant Replacement - Replace one boiler with one new 3MMBTU condensing boiler - & Control Valves Water Treatment Plant $198,118 $9,090 $0 $0 $10,500 $187,618 20.6 Air Compressor Replacement and Leak Detection - Install new air compressors and fix leaks in the system Water Treatment Plant $53,782 $3,590 $0 $0 $0 $53,782 15.0 WTP Improvements - Sub Total $331,818 $15,760 $0 $575 $16,992 $314,826 19.3 Central Maintenance Lighting Upgrade - Replace existing lighting with LED retrofit technology. (TUBES) Central Maintenance $117,095 $10,220 $0 $2,151 $16,310 $100,785 8.1 Building Envelope Improvements - seal envelope wall/ceiling, doors and windows. Central Maintenance $47,704 $3,040 $0 $0 $0 $47,704 15.7 Conference Room Heating - Add Finned Tube Radiation Central Maintenance $10,448 $0 $0 $0 $0 $10,448 N/A CMF Improvements - Sub Total $175,247 $13,260 $0 $2,151 $16,310 $158,936 10.3 Other Contingency - Funds for additional scope to be determined later by the owner City Projects $100,000 $0 $0 $0 $0 $100,000 N/A Totals – Option 3 $1,543,791 $80,370 $0 $10,642 $70,254 $1,473,536 16.2 Totals – Option 2 (Shaded) $1,347,832 $72,260 $10,633 $70,254 $1,277,578 15.4