HomeMy WebLinkAbout16247 Dutch Barn Dr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/28/17.7.Plan No. SBF18.03.03-THE STIRLING-B ELEVATIONNOTESLot= 5,000 sq. ft.House/Garage= 2,209 sq. ft.Porch= 135 sq. ft.Driveway= 260 sq. ft.Total Impervious= 2,604 sq. ft. or 52.1 % of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 936.8Garage Top of Block= 937.5House Top of Block= 937.5Lowest Floor= 929.5Top of Block at Egress Window= 932.7*Front wall is 9 ft.Lot 3, Block 3, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County,MinnesotaPROPERTY DESCRIPTION16247 Dutch Barn Drive, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 5th day of June, 2019Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 4 and 5, Block 4 = 939.39BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc.
2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FOR
ROBERT THOMAS HOMESDRAWN BYDATEREVISIONS6/5/2019CAD FILEPROJECT NO.SHEET 1 OF 1390536.dwg390536Lot 3, Block 3, SPIRIT OF BRANDTJEN FARM
18TH ADDITION, Dakota County, MinnesotaJCB The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate: 06/11/2019 mhughesPlanning DepartmentApprovedDate:__________________06/21/2019dmorey