HomeMy WebLinkAbout19-074CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 19-74
RESOLUTION APPROVING THE PRELIMINARY PLAT AND
PUD DEVELOPMENT STAGE PLANS OF SPRINGS AT LAKEVILLE
WHEREAS, Continental 476 Fund LLC has requested approval of the preliminary plat and PUD
development stage plans of 260 multiple family dwelling units to be known as Springs at
Lakeville, legally described as Outlot C and Outlot D, Cherry Highlands Third; and
WHEREAS, the Planning Commission held a public hearing at their June 20, 2019 meeting,
preceded by notice as required by the Subdivision Ordinance; and
WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources
Committee unanimously recommended approval of the preliminary plat; and
WHEREAS, the preliminary plat and PUD development stage plans are acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
The Springs at Lakeville preliminary plat and PUD development stage plans are approved subject
to the following conditions:
1. The following principal and accessory building setbacks shall be established within the
PUD District:
2. Building elevation plans for exterior finish materials shall comply with the following:
a. Principal buildings:
Minimum Setback
Yard
North
Cedar Ave.
Dodd Blvd.
West
Apartment Buildings and
Clubhouse
30ft.
30ft.
30ft
30ft.
Accessory buildings
loft.
30ft.
15ft.
loft.
2. Building elevation plans for exterior finish materials shall comply with the following:
a. Principal buildings:
(1) A minimum of 50 percent of elevations facing outward at the perimeter
shall be surfaced with brick, stucco, or stone materials.
(2) A minimum of 25 percent of the area of each internal elevation of a
structure shall have an exterior finish of brick, stucco and/or natural or
artificial stone.
(3) Except for brick, stucco, and/or natural or artificial stone, no single
interior elevation shall have more than 75 percent of one type of exterior
finish.
(4) Except for brick, stucco, and/or natural or artificial stone, no more than 60
percent of all interior elevations shall be of one type of exterior finish.
b. The exterior materials for accessory buildings shall be the same as used for the
principal buildings in accordance with Section 11-18-9.E of the Zoning
Ordinance.
3. Landscaping shall be installed according to the approved landscape plan. The developer
shall provide a cost estimate for the landscaping prior to City Council consideration of
the final plat.
4. The cost of the proposed trail abutting Dodd Boulevard (CSAH 9) extended to 175t'
Street shall be divided between the developer and the City in accordance with the
provisions of Section 10-4-3.H.4 of the Subdivision Ordinance, except that the City will
reimburse the developer for the segment of trail west of the subject property.
5. Vehicle access for fire protection and control of proposed emergency access gates shall be
subject to review and approval of the Fire Chief.
6. Two retaining wall mounted signs not to exceed 100 square feet in area shall be allowed
consistent with the provisions of Section 11-23-15.X.1 of the Zoning Ordinance and one
wall sign not to exceed 100 square feet in area shall be allowed on the north elevation of
the club house building.
7. Park dedication requirements shall be satisfied by payment of a cash fee in lieu of land at
the time of final plat approval as provided for by Section 10-4-8.J of the Subdivision
Ordinance.
E
8. All grading, drainage, and erosion control plans are subject to review and approval by the
City Engineer.
9. All utility plans are subject to review and approval of the City Engineer.
10. All drainage and utility easements are subject to review and approval of City staff.
11. The developer shall execute a development agreement with the City as drafted by City
Attorney and subject to approval of the City Council.
ADOPTED by the Lakeville City Council this ls` day of July 2019
ATTEST:
Charlene Friedges, City Cle
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
3
CITY OF LAKEVILLE
Douglas rAnderson, Mayor