Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA161635 Helical Report
Installer's Name:Tyler/Noah Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:6/14/19 Name of Customer or Contractor:Bartylla Description of customer project:Deck Porch Project Address:9153 163rd St N, Lakeville Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7')Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:2000 500 2 3/8”9”10’915 4575 2287 Pile 2:2000 500 2 3/8”9”10’1150 5750 2875 Pile 3:2000 500 2 3/8”9”10’750 3750 1875 Pile 4:2000 500 2 3/8”9”720 3600 1800 Pile 5:2000 500 2 3/8”9”10’1100 5500 2750 Pile 6: Pile 7: Pile 8: Pile 9: Pile 10: Pile 11: Pile 12: Pile 13: Pile 14: Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15: Pile 16: Pile 17: 5 4 3 2 1 HOUSE 1 Pile 18: Pile 19: Pile 20: Pile 21: Pile 22: Pile 23: Pile 24: Pile 25: Pile 26: Pile 27: Pile 28: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2