Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19210 Indora Trail Survey
c Pioneer Engineering Revisions: 1.) 06-06-19 Stake house 2.) 06-12-19 Add wall Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 Zoning = RM-1 FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30' SY Buffer - 50'RY Buffer - 50' The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements *Draintile connection required.ENGINEERING REVIEWED Date: 07/01/2019 mhughes