Loading...
HomeMy WebLinkAboutLA171312 - 17303 Eagleview Dr Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 3 air quantity is negative, no additional makeup air will be required for ventilation, if the value is positive refer to Table 501.4.2 and size the opening. Transfer the cfm, size of opening and type (round, rectangular, flex or rigid) to the last line of section D. The ventilation make-up air supply must communicate with the exhaust appliances. Table 501.4.1, 2015 Minnesota Mechanical Code PROCEDURE TO DETERMINE MAKEUP AIR QUANITY FOR EXHAUST APPLIANCES IN DWELLING UNITS (Additional makeup air will be required for combustion appliances, see KAIR method for calculations) One or multiple power vent or direct vent appliances or no combustion appliances Column A One or multiple fan- assisted appliances and power vent or direct vent appliances Column B One atmospherically vented gas or oil appliance or one solid fuel appliance Column C Multiple atmospherically vented gas or oil appliances or solid fuel appliances Column D 1.Enter the Appropriate Column to Estimate House Infiltration a) pressure factor (cfm/sf) 0.15 0.09 0.06 0.03 b) conditioned floor area (sf) (including unfinished basements) 2398 Estimated House Infiltration (cfm): [1a x 1b] 359 2. Exhaust Capacity ERV= 0 a) clothes dryer (cfm) 135 135 135 135 b) 80% of largest exhaust rating (cfm); (not applicable if recirculating system or if powered makeup air is electrically interlocked and match to exhaust) 56 c) 80% of next largest exhaust rating (cfm); (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) NA Total Exhaust Capacity (cfm); [2a + 2b +2c] 191 3. Makeup Air Quantity (cfm) a) total exhaust capacity (from above) 191 b) estimated house infiltration (from above) 359 Makeup Air Quantity (cfm); [3a – 3b] (if value is negative, no makeup air is needed) -168 4. For makeup Air Opening Sizing, refer to Table 501.4.2 NR A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliance or if there are no combustion appliances. (Power vent and direct vent appliances may be used.) B. Use this column if there is one fan-assisted appliance per venting system. (Appliances other than atmospherically vented appliances may also be included.) C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. Be advised: 2015 Minnesota Mechanical Code, Section 505.2, Installation of exhaust hood systems capable of exhausting in excess of 400 cfm shall be provide with makeup air at a rate approximately equal to the exhaust air rate. Such makeup air systems shall be equipped with a means of closure and shall be automatically controlled to start and operate simultaneously with the exhaust system. Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 07/26/2019dmathews UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. -Min. 15" clearance to anyobstruction from center of W.C., 24" in front(typ). 07/17/19 X KP