Loading...
HomeMy WebLinkAboutsurvey - 17303 Eagleview DrZoning = RM-1 The curb box, drain tile cleanout and catch basin (if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 07/11/2019 mhughes