Loading...
HomeMy WebLinkAbout19717 Highview Avenue-SURVEYZoning = RS-3 P r o p o s e d c l e a n o u t a r e a The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod*No structures in easements ENGINEERING REVIEWEDDate: 07/11/2019 mhughes