HomeMy WebLinkAbout19717 Highview Avenue-SURVEYZoning = RS-3
P
r
o
p
o
s
e
d
c
l
e
a
n
o
u
t
a
r
e
a
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod*No structures in easements ENGINEERING REVIEWEDDate: 07/11/2019 mhughes