HomeMy WebLinkAboutLA171601 17874 Essex Lane Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Concept Approval
ONLYSubject to Field Inspection
Inspector Date
2015
MN Bldg
Code
07/31/2019dmathews
Secure door closed until deck is
constructed with a separate permit.
4' WSP4' WSP4' WSP4' WSP4' WSP4' WSP 8' LIB
8' LIB
4' WSP
4' WSP4' WSP4' WSP4' WSP4' WSP4' WSP4' WSP
4' WSP 4' WSP
UFER Ground
-Min. 15" clearance to anyobstruction from center of
W.C., 24" in front(typ).5.17' LIB5.17' LIB5.17' LIB5.17' LIBPFH PFH
5.17' LIB 5.17' LIB
4' WSP 4' WSP 5.17' LIB5.17' LIB5.17' LIB3' WSP5.17' LIB
5.17' LIB5.17' LIB5.17' LIB
4' WSP5.17' LIB5.17' LIB5.17' LIB
ROOF PLAN NOTES:
1. TRUSS IDENTIFICATION LABEL LOCATED ONBOTTOM SIDE OF BOTTOM CHORD
2. ALL DIMENSIONS ARE IN FEET- INCHES-16THS
3. END OF TRUSS WITH "X" TICK MARK ON THE LAYOUTCORRESPONDS WITH LEFT END ON TRUSS DRAWING.
4. DO NOT MODIFY, CUT, OR REPAIR ANY PORTION OF THETRUSSES WITHOUT APPROVAL FROM ABC TRUSS. WARRANTYWILL BE VOIDED WITHOUT OFFICIAL DOCUMENTATION.
5. SEE INDIVIDUAL TRUSS CALC FOR MULTI-PLY GIRDERCONNECTION AND PERMANENT BRACING INFORMATION
6. SEE HANGER INSTALLATION GUIDE OR CATALOG FOR MORE DETAIL ON HANGER ATTACHMENT.
7. TEMPORARY BRACING INFORMATION IS SHOWN ON THE
BCSI-B1 SUMMARY SHEET LOCATED IN THE JOB PACKET.
8. THE INTENT OF THIS DOCUMENT IS TO SHOW TRUSS
PLACEMENT ONLY. THE CONTRACTOR IS RESPONSIBLEFOR VERIFYING ALL DIMENSIONS AND WALL HEIGHTSWITH THE BLUEPRINT PRIOR TO SETTING THE TRUSSES.
9. BEARINGS DESIGNED FOR A FcPerp VALUE OF 425 FOR ALL BEARINGS. (UNLESS NOTED OTHERWISE BY A FcPerp ### NOTE)"TOP PLATE OF BEARING WALL DESIGN AND MATERIAL BY OTHERS."
10. SET ALL VALLEY TRUSSES AFTER MAIN ROOF HAS BEEN SHEATHED. ADJUSTMENT OF SPACING MAY BE REQUIRED.PLACE LAYDOWN GABLE "GX" HEREPLACE LAYDOWN GABLE "DX" HEREPLACE LAYDOWN GABLE "HX" HEREPLACE LAYDOWN GABLE "DX2" HERE
PLACE LAYDOWN GABLE "DX3" HERE
DROPPED BEAM(supplied by others)
VAULT ---->>
VAULT ---->>
SLOPED WALL
*** GREEN WALLS & TOP OF PORCH BEAMS *** DROPPED 2-8-8 FROM
OTHER UPPER STORY WALLS
*** ORANGE WALLS DROPPED 6-5-14 FROM ***UPPER STORY PLATE HEIGHT
SALES REP: LLC
DUE DATE: 1/24/2019
DSGNR/CHKR: DW / ABC
TC Live
TC Dead
BC Live
BC Dead
Total
35.00 psf
10.00 psf
0.00 psf
10.00 psf
55.00 psf
WO#: T87771
SCALE: 1"=6' 6"
Date: 1/24/2019 13:20
DurFac-Lbr : 1.15
DurFac-Plt : 1.15
O.C. Spacing: 2
Design Spec: IRC-2012
#Tr/#Cfg: 96 / 54
AMBER
LYMAN CHAN
17838 ESSEX LN
LAKEVILLE MN
C 1-11-4
2-0
H3
1-8-122-0
1-11-4
D 2-0-12
D1 2-0
D2 2-0
D3 2-0
D4 2-0
D5 2-0
D6 2-0
D7 2-0
D8 2-0
D9 2-0
A
A1
1-10
F3 F21-11-42-02-0VA
2-1-4
VB
2-0
VC
2-0
VD
2-0
VE
2-0
VF
2-0
VG
2-0
VH
2-0
VJ
2-0
E
H2 2-0H1 2-0H 2-0G12-02-02-02-02-02-02-0G12-0G22-0G32-0DR1-11-42-02-02-02-02-02-02-02-02-02-0GD
1-11-4
GC
2-0
GB
2-0
2-0
2-0
2-0
2-0
2-0
2-0
2-0
2-0
2-0
2-0
GB2-0
B
G
R
GE1-11-4HC
HB
HA HRXA
XB
XC
(11) DA
(4) F(9) F1
(6) G
(10) GA(4) C1(2) B1(2) FA
02: Main Level
Member Name Results Current Solution Comments
Master Bedroom Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Fopyer Garage Service Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Front Stoop Dropped Beam (V)Passed 2 Piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Garage 8' OHD Passed 3 Piece(s) 2 x 12 Spruce-Pine-Fir No. 1 / No. 2
Garage 16' OHD Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
03: Lower Level
Member Name Results Current Solution Comments
Bedroom # 5 Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bedroom # 4 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Family Room Patio Door Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Flex Room Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bedroom 4 & 5 Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Stairs Flush Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Flex Room Dropped Beam Passed 3 Piece(s) 1 3/4" x 11 7/8" 2.0E Microllam® LVL
17874 Essex Lane, Lakeville, MN.4te
JOB SUMMARY REPORT
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 1 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.03"954 1636 2590 None
2 - Trimmer - SPF 3.00"3.00"2.03"954 1636 2590 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2591 @ 1 1/2"3825 (3.00")Passed (68%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1629 @ 1' 1/4"2872 Passed (57%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)3246 @ 2' 9"3946 Passed (82%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.037 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.058 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Master Bedroom WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"17'20.0 35.0 Snow - Main
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 2 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"419 715 1134 None
2 - Trimmer - SPF 1.50"1.50"1.50"419 715 1134 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1134 @ 0 1913 (1.50")Passed (59%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)475 @ 10 3/4"2872 Passed (17%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)874 @ 1' 6 1/2"3946 Passed (22%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.003 @ 1' 6 1/2"0.103 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.005 @ 1' 6 1/2"0.154 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 3' 1" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 1" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Fopyer Garage Service DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 3' 1"N/A 7.0
1 - Uniform (PSF)0 to 3' 1"12' 3"20.0 35.0 Snow - Garage
2 - Uniform (PSF)0 to 3' 1"1'20.0 35.0 Snow - Garage
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 3 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Stud wall - SPF 5.50"5.50"1.50"508 855 1363 None
2 - Trimmer - SPF 3.00"3.00"1.50"402 683 1085 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1084 @ 6' 1 1/2"3825 (3.00")Passed (28%)--1.0 D + 1.0 S (Alt Spans)
Shear (lbs)751 @ 5' 4 3/4"2251 Passed (33%)1.15 1.0 D + 1.0 S (Alt Spans)
Moment (Ft-lbs)1373 @ 3' 5 11/16"2645 Passed (52%)1.15 1.0 D + 1.0 S (Alt Spans)
Live Load Defl. (in)0.034 @ 3' 5 3/8"0.179 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans)
Total Load Defl. (in)0.053 @ 3' 5 7/16"0.269 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans)
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
Member Pitch: 0/12
•Deflection criteria: LL (L/360) and TL (L/240).
•Overhang deflection criteria: LL (2L/360) and TL (2L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 3" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Front Stoop Dropped Beam (V)MEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 3"N/A 5.5
1 - Uniform (PSF)0 to 6' 3" (Front)7'20.0 35.0 Snow - Main
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 4 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
3 piece(s) 2 x 12 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.60"1150 1914 3064 None
2 - Trimmer - SPF 3.00"3.00"1.60"1150 1914 3064 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3064 @ 1 1/2"5738 (3.00")Passed (53%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2232 @ 1' 2 1/4"5240 Passed (43%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)6325 @ 4' 4 1/2"7960 Passed (79%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.069 @ 4' 4 1/2"0.283 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.110 @ 4' 4 1/2"0.425 Passed (L/927)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 8' 9" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 9" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Garage 8' OHDMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 8' 9"N/A 12.8
1 - Uniform (PSF)0 to 8' 9"12' 6"20.0 35.0 Snow - Garage
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 5 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"1449 879 2328 None
2 - Trimmer - SPF 3.00"3.00"1.50"1449 879 2328 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2328 @ 1 1/2"7613 (3.00")Passed (31%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1984 @ 1' 2 7/8"9878 Passed (20%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)9460 @ 8' 4 1/2"18346 Passed (52%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.244 @ 8' 4 1/2"0.550 Passed (L/811)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.646 @ 8' 4 1/2"0.825 Passed (L/306)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 11' 10" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 16' 9" o/c unless detailed otherwise.
Main Level, Garage 16' OHDMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 16' 9"N/A 13.0
1 - Uniform (PSF)0 to 16' 9"3'20.0 35.0 Snow - Garage
2 - Uniform (PSF)0 to 16' 9"1'100.0 -Wall - Gable
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 6 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.84"1733 798 1593 4124 None
2 - Trimmer - SPF 3.00"3.00"2.73"2586 798 2636 6020 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)5223 @ 5' 4 1/2"5738 (3.00")Passed (91%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2322 @ 4' 5 3/4"4308 Passed (54%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans)
Moment (Ft-lbs)4330 @ 2' 8 3/8"5919 Passed (73%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans)
Live Load Defl. (in)0.026 @ 2' 8 5/8"0.175 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans)
Total Load Defl. (in)0.051 @ 2' 8 5/8"0.262 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 5 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 10.6
1 - Uniform (PSF)0 to 5' 6"7' 3"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'80.0 --Wall - Upper Level
3 - Uniform (PLF)0 to 4' 6"N/A 442.6 -595.0 Generated from
Loading Assistant
4 - Point (lb)5' 6"N/A 1231 -1552 Generated from
Loading Assistant
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 7 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"2.62"1520 798 1636 3954 None
2 - Trimmer - SPF 3.00"3.00"2.62"1520 798 1636 3954 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3345 @ 1 1/2"3825 (3.00")Passed (87%)--1.0 D + 0.75 L + 0.75 S (All Spans)
Shear (lbs)857 @ 1' 1/4"2498 Passed (34%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1708 @ 2' 9"3431 Passed (50%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.018 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.031 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 4 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"7' 3"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'90.0 --Wall - Main Level
3 - Point (lb)0 N/A 954 -1636
Linked from: Master
Bedroom Window,
Support 1
4 - Point (lb)5' 6"N/A 954 -1636
Linked from: Master
Bedroom Window,
Support 2
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 8 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.74"1253 2080 455 3788 None
2 - Trimmer - SPF 3.00"3.00"1.74"1253 2080 455 3788 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3333 @ 1 1/2"5738 (3.00")Passed (58%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)2286 @ 1' 1/4"3746 Passed (61%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)5008 @ 3' 3"5147 Passed (97%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.053 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.085 @ 3' 3"0.313 Passed (L/885)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Family Room Patio DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.6
1 - Uniform (PSF)0 to 6' 6"9'15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 6' 6"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 6' 6"4'20.0 -35.0 Snow - Main
4 - Uniform (PSF)0 to 6' 6"7'10.0 40.0 -Floor - Deck
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 9 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.71"1212 943 341 2496 None
2 - Trimmer - SPF 3.00"3.00"1.71"1212 943 341 2496 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2174 @ 1 1/2"3825 (3.00")Passed (57%)--1.0 D + 0.75 L + 0.75 S (All Spans)
Shear (lbs)1105 @ 1' 1/4"2498 Passed (44%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)2421 @ 3' 3"3431 Passed (71%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.036 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.061 @ 3' 3"0.313 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Flex Room WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 7.0
1 - Uniform (PSF)0 to 6' 6"7' 3"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 6' 6"1'90.0 --Wall - Main Level
3 - Point (lb)0 N/A 543 -341
4 - Point (lb)6' 6"N/A 543 -341
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 10 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"420 1094 1514 None
2 - Trimmer - SPF 1.50"1.50"1.50"420 1094 1514 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1514 @ 0 1913 (1.50")Passed (79%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)584 @ 10 3/4"2498 Passed (23%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1104 @ 1' 5 1/2"3431 Passed (32%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.004 @ 1' 5 1/2"0.097 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.006 @ 1' 5 1/2"0.146 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 2' 11" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 11" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom 4 & 5 DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 2' 11"N/A 7.0
1 - Uniform (PSF)0 to 2' 11"18' 9"15.0 40.0 Floor - Main Level
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 11 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Stud wall - SPF 3.50"3.50"1.50"407 1033 1440 Blocking
2 - Stud wall - SPF 3.50"3.50"1.50"407 1033 1440 Blocking
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1440 @ 2"4463 (3.50")Passed (32%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)892 @ 1' 3/4"2498 Passed (36%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1777 @ 2' 9 1/2"3431 Passed (52%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.023 @ 2' 9 1/2"0.131 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.032 @ 2' 9 1/2"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Floor
Member Type : Flush Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/480) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 7" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 7" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Stairs Flush BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 5' 7"N/A 7.0
1 - Uniform (PSF)0 to 5' 7" (Front)9' 3"15.0 40.0 Floor - Main Level
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 12 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
3 piece(s) 1 3/4" x 11 7/8" 2.0E Microllam® LVL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.76"1909 4800 6709 None
2 - Trimmer - SPF 3.00"3.00"1.76"1909 4800 6709 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)6709 @ 1 1/2"11419 (3.00")Passed (59%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)5323 @ 1' 2 7/8"11845 Passed (45%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)19297 @ 6'26772 Passed (72%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.260 @ 6'0.392 Passed (L/543)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.363 @ 6'0.587 Passed (L/388)--1.0 D + 1.0 L (All Spans)
System : Floor
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 12' o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 12' o/c unless detailed otherwise.
Lower Level, Flex Room Dropped BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by Brandl Anderson, Plan Date; 6/25/2019
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 12'N/A 18.2
1 - Uniform (PSF)0 to 12' (Front)20'15.0 40.0 Floor - Main Level
Forte v5.5, Design Engine: V7.3.2.4
7/8/2019 9:56:00 AM
Page 13 of 13
17874 Essex Lane, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
Tirunehe Residence
17874 Essex Lane, Lakeville, MN
7/5/2019 Job# 23618
Date Certificate Post
x Passive (No Fan )
Active (With fan and monometer
or other system monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
x
R-15 x
x
R-20 x x
R-20 x x
19+5 x x
R-49 x
R-49 x
R-38 x
R-38+5 x x
X Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:44,000 Capacity in
Gallons:Other, describe:
AFUE or
HSPF%95%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
X Passive
x Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
6 " Flex
" metal duct
New Construction Energy Code Compliance Certificate
Heating System
MECHANICAL SYSTEMS
R-value R-8
Duct system air tightness:
Heating or Cooling Ducts Outside Conditioned Spaces
Cooling System
Make-up Air Select a Type
Perimeter of Slab on Grade
R10 Rigid Exterior, R10 Int closed cellRigid, IsocynurateMineral FiberboardRigid, Extruded Polystyrene Total ventilation (intermittent + continuous) rate in cfms:
Capacity continuous ventilation rate in cfms:
City Mailing Address of the Dwelling or Dwelling Unit
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
50
Location of duct or system:
Rating or Size
Efficiency
Lennox
Electric
13SEER
/EER
Output
in Tons:1.5
13ACXN018
Location of duct or system:
192
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Combustion Air Select a Type
Balanced Ventilation capacity in cfms:
High:
High:
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
34742 11356
Residential Load Calculation
Heating Loss
82
15,280
Building envelope air tightness:
Describe other insulated areas
Windows & Doors
MECHANICAL VENTILATION SYSTEM
Cooling LoadHeating Gain
17874 Essex Lane
R-5 where required
Lakeville
Type: Check All That Apply
Insulation Location
Foundation Wall
Model
Appliances
Lennox Manufacturer
Fuel Type Natural Gas
ML195UH045
0.30 Solar Heat Gain Coefficient (SHGC):
Natural Gas
Domestic Water
Heater
Ceiling, flat
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Average U-Factor (excludes skylights and one door ) U: 0.30 Foam, Closed CellTotal R-Value of all Types of Insulation Below Entire Slab
Rim Joist (2nd Floor+)
Rim Joist (1st Floor)
R10 Rigid Exterior, R10 Int closed cell
R5 Exterior, R19 Batts
Attic
Name of Residential Contractor MN License Number
RADON CONTROL SYSTEMTHERMAL ENVELOPE
Foam Open CellNon or Not ApplicableFiberglass, BlownBC604388Brandl Anderson Homes
Wall Fiberglass, Batts000000Builders Associaton of Minnesota version 101014
40,000
X
X
40,000
40,000
3000
3000
3000
40,000
40,000 13.33
13.33
2640
2640 .88
.88 .12
.12 1.6
1.4
240
375
375
NR
3352
503
503
175
88
07/18/19 X
KP