Loading...
HomeMy WebLinkAbout10316 - 199th St Survey199TH STREETPROPOSED HOUSEW/O BASEMENTBASE=988.0DECKPORCHGARAGEFF=993.0HOUSE UNDERCONSTRUCTIONBASE FF=991.1993.0987.5995.0989.0 199TH STREETRIGHT OF WAY10.010.1EASEMENT FOR INGRESS ANDEGRESS AND FOR PUBLIC ACCESSTO PUBLIC UTILITIES (HATCHEDAREA).DOCUMENT NO. 1396744EASEMENT FOR ACCESS TO LAKE FORPARCEL A PER DOCUMENT NO. 1396746(TO BE VACATED)ROCK CONSTRUCTION ENTRANCEDOUBLE ROW SILT FENCESD Custom Homes750 Main St. Suite 223Mendota Heights, MN 55118NOTES:TOTAL AREA OF PROPERTY = 22,860 SQ. FT.EXISTING IMPERVIOUS SURFACE AREA = 225 SQ. FT. = 0.98%PROPOSED HARD SURFACE = 5,376 SQ. FT. = 23.5%GRADING NOTES1)CONSTRUCT TEMPORARY ROCK CONSTRUCTION ENTRANCE PER CITY SPECIFICATIONS.2)INSTALL SILT FENCE PRIOR TO EXCAVATION AS NEEDED TO ENSURE SEDIMENT DOES NOT ENTER LAKEMARION. SILT FENCE MUST REMAIN IN PLACE UNTIL STAFF HAS DETERMINED THE SITE TO BE STABILIZED.3)RE-VEGETATE THE SITE WITHIN 48 HOURS OF FINAL GRADING.4)THE STREET MUST BE CLEARED OF DEBRIS AT THE END OF EACH DAY. ADDITIONAL SWEEPING WILL BEREQUIRED DURING THE HAULING PROCESS. ALL STREETS MUST BE MAINTAINED TO SAFE DRIVINGCONDITIONS.5)ALL DOWNSTREAM EXISTING CATCH BASINS MUST HAVE INLET PROTECTION.6)CONTRACTOR SHALL DETERMINE STOCK PILE AREAS AND CONCRETE WASHOUT AREAS PRIOR TOEXCAVATION AND PROVIDE NECESSARY EROSION CONTROL. STOCKPILES MUST NOT BE PLACED NEARWATERBODIES.7)PROPOSED SLOPES AS SHOWN ARE NOT GREATER THAN 3:1.8)PROVIDE WEEKLY EROSION CONTROL INSPECTIONS TO ENSURE EROSION CONTROL IS EFFECTIVE ANDMAINTENANCE IS INITIATED AS NECESSARY. INSPECTIONS MUST ALSO BE COMPLETED WITHIN 24 HOURSOF A 0.5 INCH RAIN AND MAINTENANCE MUST TAKE PLACE ONCE EROSION CONTROL HAS REACHED 1/2 OFTHE DEVICES HEIGHT.9)ALL SOILS EXPOSED FOR MORE THAN 7 DAYS MUST HAVE TEMPORARY STABILIZATION IMPLEMENTED(SEEDING AND MULCH, POLY OR EQUIVALENT).DESCRIPTION OF PROPERTY:That part of Lot 8 and that part of Lot 9, Block 23, Lenihan's Lots, Antlers Park, Dakota County,Minnesota, together with that part of the vacated street adjoining thereto lying easterly of thefollowing described line: Commencing at the northwest corner of said Lot 8; thence North 67degrees 16 minutes 04 seconds East, assumed bearing, on the northerly line of said Lot 8 and Lot 9a distance of 49.00 feet to the northeast corner of said Lot 9; thence South 71 degrees 00 minutes56 seconds East along the northerly line of said vacated street a distance of 8.82 feet to the point ofbeginning of the line to be described; thence South 27 degrees 05 minutes 44 seconds West adistance of 128.17 feet; thence South 03 degrees 57 minutes 13 seconds East a distance of 91.90feet; thence South 02 degrees 25 minutes 44 seconds East a distance of 109 feet more or less tothe shore of Lake Marion and said line there terminating. Subject to a 10 foot wide public drainageand utility easement adjoining the said parcel boundary thereof.I hereby certify that this is a correct representation of a survey of theproperty shown hereon, and that this survey and certificate wasprepared by me or under my direct supervision and that I am a dulylicensed Land Surveyor under the laws of the State of Minnesota.Grant D. Jacobson, MN License No. 23189Dated this 27th Day of June, 2019