HomeMy WebLinkAbout18333 Gleed Rd Surveyf:\jobs\7561 - 7580\7563 - avonlea 3rd addition\cad c3d\survey\7563.006.dwgSave Date:07/12/19
H
o
u
s
e
A
d
d
r
e
s
s
:
C
e
r
t
i
f
i
c
a
t
e
o
f
S
u
r
v
e
y
f
o
r
:
M
/
I
H
O
M
E
S
O
F
M
I
N
N
E
A
P
O
L
I
S
,
L
L
C
1
8
3
3
3
G
l
e
e
d
R
o
a
d
,
L
a
k
e
v
i
l
l
e
,
M
N
H
o
u
s
e
M
o
d
e
l
:
B
l
o
o
m
i
n
g
t
o
n
(
C
)
3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449Phone: 763-489-7900 Fax: 763-489-7959 ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYING The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easements *Draintile connection required.
E
N
G
I
N
E
E
R
I
N
G
R
E
V
I
E
W
E
D
D
a
t
e
:
0
7
/
2
4
/
2
0
1
9
m
h
u
g
h
e
s
P
l
a
n
n
i
n
g
D
e
p
a
r
t
m
e
n
t
A
p
p
r
o
v
e
d
D
a
t
e
:
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
0
7
/
2
5
/
2
0
1
9
d
m
o
r
e
y