HomeMy WebLinkAboutItem 06.h
Date: Item No.
SPIRIT OF BRANDTJEN FARM 22ND ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution
approving the Spirit of Brandtjen Farm 22nd Addition final plat, and 2) a resolution establishing
no parking areas.
Overview
Tradition Development (a/k/a SBF Development Corp.) representatives are requesting approval
of the Spirit of Brandtjen Farm (SBF) 22nd Addition final plat of 29 single family lots located
north of 165th Street and east of Eagleview Drive. This is the fourth and final phase of the SBF
18th Addition preliminary plat of 190 single family lots and 63 detached townhome lots approved
by the City Council on May 15, 2017. The SBF 18th Addition final plat of 55 single family lots
and 63 detached townhome lots was approved by the City Council on July 24, 2017; the SBF 19th
Addition final plat of 44 single family lots was approved by the City Council on May 7, 2018; and
the SBF 20th Addition final plat of 62 single family lots was approved by the City Council on July
16, 2018.
The layout of the SBF 22nd Addition final plat is consistent with the approved SBF 18th Addition
preliminary plat. In conjunction with the SBF 22nd Addition final plat, a no parking resolution is
required consistent with the street designs approved with the SBF PUD.
Primary Issue to Consider
Why is an easement needed for access to the trails within Outlots A and B, SBF 22nd Addition?
A publicly accessible, privately maintained trail is proposed within Outlots A and B, which are
being retained by the developer (HOA). The easement spells out the SBF homeowners association
maintenance responsibilities for this trail in addition to allowing the public to access the trail.
Supporting Information
• Final plat and no parking resolutions
• Signed development contract and public trail access easement
• July 26, 2019 planning and engineering reports
Financial Impact: $ None Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
August 19, 2019
Subdivision Ordinance, SBF PUD Booklet
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 22ND ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 22nd
Addition has requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Spirit of Brandtjen Farm 22nd Addition is hereby approved
subject to the development contract and planned unit development
agreement, the security requirements, and the terms and conditions of the
Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan
Agreement dated October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars, the
development contract and planned unit development agreement, and the
public trail access easement.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 19th day of August 2019.
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 19th day of August 2019 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS ON DULUTH TRAIL
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the section of Duluth Trail will be constructed to allow a single traffic
lane in each direction with parking on one side only in Spirit of Brandtjen Farm 22nd
Addition, consistent with the approved street sections in the Spirit of Brandtjen Farm
planned unit development, and
WHEREAS, establishing “No Parking” areas on Duluth Trail will discourage
potential on-street parking, maintain sufficient access to the traffic lanes, provide
increased sight lines for drivers, and reduce the interaction between vehicles and
pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that the north/west side of Duluth Trail
shall be designated “No Parking” anytime.
ADOPTED by the Lakeville City Council this 19th day of August 2019.
CITY OF LAKEVILLE
By: ________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 26 July 2019
RE: Lakeville – SBF; SBF 22nd Addition Final Plat
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted an application for the final plat of Spirit of
Brandtjen Farm 22nd Addition, which consists of 29 single family lots located east of Eagleview
Drive between Dryden Road and 165th Street within SBF. The final plat includes Outlot F, SBF
17th Addition; Outlot G, SBF 18th Addition; and Outlot D, SBF 20th Addition having a total area of
11.91 acres. The subject site is zoned PUD, Planned Unit Development District as approved by
the City Council on 20 June 2005. This is the fourth and final phase of the SBF 18th Addition
PUD Development Stage Plan and preliminary plat approved by the City Council on 15 May
2017.
Exhibits:
A. Site Location Map
B. SBF 18th Addition Lot Designation Plan
C. SBF 18th Addition Approved PUD Development Stage Plan/Preliminary Plat
D. SBF 22nd Addition Final Plat
E. SBF 22nd Addition Title Sheet
ANALYSIS
Land Use. The SBF Land Use Plan (Page 3.4 of the SBF PUD Booklet) guides the area of SBF 22nd
Final Plat Addition for a range of Low-Medium Density Residential (3-6du./ac.) and Medium
Density Residential (6-8 du./ac.) land uses. The gross density of the final plat is 2.43 dwelling
2
units per acre. The approved PUD Development Stage Plan for the subject site is lower in
density than that guided by the SBF Master Site Plan, but maintains the minimum of 3.0
dwelling units per acre of density required by the Metropolitan Council for the City’s overall
2030 Land Use Plan. The subdivision design and number of lots within SBF 22nd Addition are
consistent with the approved PUD Development Stage Plan and preliminary plat.
Lot Requirements. The proposed 29 single family lots consist of 17 cottage lots and 12
traditional lots as designated by the PUD Development Stage Plan. The proposed lots are
required to comply with the minimum standards for the respective cottage and traditional lot
designation consistent with the Section 7 of the SBF PUD Booklet, shown in the table below.
Each lot has adequate area within required minimum setbacks, also shown in the table below,
to allow for construction of a single family dwelling.
Lots Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
Cottage 60ft. 20ft. 25ft. 15ft. 7ft. 15ft. 25ft. 15ft. 20ft. 10ft.
Traditional 75ft. 20ft. 25ft. 15ft. 7ft. 15ft. 25ft. 15ft. 20ft. 10ft.
Streets. The final plat includes right-of-way for Duluth Trail between Dryden Road and 165th
Street. The right-of-way for Duluth Trail is consistent with the approved preliminary plat and
provides for a 52 foot wide right-of-way and 28 foot wide street section as specified for Street
SC.3 in the SBF PUD Booklet. No parking zones are to be designated on the north/west side of
Duluth Trail with the final plat. The submitted plans include construction of five foot wide
concrete sidewalks along both sides of Duluth Trail, which is also consistent with the design for
Street SC.3 within the SBF PUD Booklet. All street construction plans are subject to review and
approval of the City Engineer.
Landscaping. A landscape plan was approved with the PUD Development Stage Plan and
preliminary plat for the interior street boulevards. The landscape plan is subject to review and
approval of the City Forester. The developer will be required to provide a security for
installation of the landscaping within the proposed final plat as part of the development
agreement.
Park Dedication. No public park land will be dedicated to the City with the SBF 22nd Addition
final plat. Park dedication requirements for the proposed final plat will be satisfied as a cash
fee in lieu of land to be paid with execution of the development agreement. The calculation of
the cash fee in lieu of land for SBF 22nd Addition is to be in accordance with the formula
established by the SBF Master PUD Development Agreement.
Easements. The final plat illustrates drainage and utility easements at the perimeter of all of
the single family lots as required by Section 10-4-4 of the Subdivision Ordinance. Drainage and
utility easements are to be dedicated over the portions of Outlot A and Outlot B that include
3
public storm sewer utilities. All drainage and utility easements are subject to review and
approval of the City Engineer.
Grading Plan. The developer has submitted grading, drainage, and erosion control plans with
the final plat that are subject to review and approval by the City Engineer.
Utilities. The subject site is located within the current MUSA. A utility plan has been submitted
for extension of sanitary sewer and water services to the SBF 22nd Addition final plat. All utility
plans are subject to review and approval of the City Engineer.
Outlots. The SBF 22nd Addition final plat includes two outlots, A and B, that are additions to
privately maintained, publicly accessible open space established with the PUD Development
Stage Plan and preliminary plat. A trail is to be constructed from Dryden Road to 165th Street
west through Outlot E, SBF 18th Addition and proposed Outlots A and B, SBF 22nd Addition.
Homeowners Association. Documents incorporating the SBF 22nd Addition final plat as part of
the SBF Master Homeowners Association are required to be submitted and are subject to
review and approval by the City Attorney.
Development Agreement. Section 10-5-1.A of the Subdivision Ordinance requires the
developer to provide construction and warranty securities for the public improvements within
the SBF 22nd Addition final plat that are to be outlined within a development agreement. The
development agreement will be drafted by the City Attorney and is to be executed by the
applicant prior to City Council consideration of the final plat.
CONCLUSION
The SBF 22nd Addition final plat is consistent with the requirements of the SBF PUD District,
Zoning Ordinance, Subdivision Ordinance, and the SBF 18th Addition PUD Development Stage
Plan and preliminary plat. Our office and City staff recommends approval of the proposed
development subject to the conditions outlined below:
1. SBF 22nd Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated 20 June 2005, and the SBF 18th Addition PUD Development Stage
Plan/Preliminary Plat approved 15 May 2017.
2. The single family lots within SBF 22nd Addition shall be subject to the requirements
established by the PUD Booklet for the lot designations approved with the PUD
Development Stage Plan as follows:
a. Lot designations:
4
Lot Type Lots
Traditional Lots 1-3, Block 1; Lots 8 and 9, Block 2; Lots 6 and 7,
Block 3; Lots 1-5, Block 4
Cottage Lots 1-7, Block 2; Lots 10-12, Block 2; Lots 1-5, Block
3; Lots 8 and 9, Block 3
b. Lot requirements:
Lots Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
Cottage 60ft. 20ft. 25ft. 15ft. 7ft. 15ft. 25ft. 15ft. 20ft. 10ft.
Traditional 75ft. 20ft. 25ft. 15ft. 7ft. 15ft. 25ft. 15ft. 20ft. 10ft.
3. All street construction plans shall be subject to review and approval of the City Engineer.
4. Park dedication requirements shall be satisfied at the time of final plat approval by
payment of a cash fee in lieu of land based on the formula established by the SBF
Master PUD Development Agreement.
5. All grading, drainage, and erosion control plans shall be subject to review and approval
of the City Engineer.
6. All utility plans shall be subject to review and approval of the City Engineer.
7. The landscape plan shall be subject to review and approval of the City Forester. The
developer shall provide a security for installation of the landscaping consistent with the
approved landscape plan.
8. Homeowners Association documents for SBF 22nd Addition are subject to review and
approval by the City Attorney.
9. The applicant shall execute a development agreement with the City as drafted by City
Attorney and subject to approval of the City Council.
c. Justin Miller, City Administrator
Alex Jordon, Assistant City Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell-Poehler, City Attorney
±
Spirit o f
Brandtjen Farm
22nd Addition
City of LakevilleAerial MapSpirit of Brandtjen Farm22nd AdditionFinal PlatEXHIBIT A
1 6 5 T H S T
D U N F IELD DRDRAFTHORSEBLVDD U RA N G O TRLD U TCH B A RN D RDRYDENRD
DULUTHTRL
The bearing system is based on the
record plat of SPIRIT OF BRANDTJEN
FARM ELEMENTARY ADDITION
Outlot C, Outlot D, Outlot E and Outlot F, SPIRIT OF BRANDTJEN FARM 17TH
ADDITION, according to the recorded plat thereof, Dakota County, Minnesota
And
Outlot B and Outlot C, SPIRIT OF BRANDTJEN FARM ELEMENTARY ADDITION,
according to the recorded plat thereof, Dakota County, Minnesota
And
Outlot G, SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION,
according to the recorded plat thereof, Dakota County, Minnesota
PROPERTY DESCRIPTION
DRAINAGE AND UTILITY EASEMENTS BEING
5 FEET IN WIDTH, UNLESS OTHERWISE
INDICATED, ADJOINING LOT LINES, AND
BEING 10 FEET IN WIDTH, UNLESS
OTHERWISE INDICATED, ADJOINING RIGHT
OF WAY LINES, AS SHOWN ON THE PLAT.
DRAINAGE AND UTILITY EASEMENTS
ARE SHOWN THUS:
BEARINGS ARE BASED ON THE EAST LINE OF OUTLOT F,
SPIRIT OF BRANDTJEN FARM 17TH ADDITION WHICH IS
ASSUMED TO HAVE A BEARING OF N 00°47'30" W
NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE
REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL
BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS
PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH
IRON PIPES MARKED BY R.L.S. NO. 47481.
DENOTES 1/2 INCH IRON MONUMENT FOUND AND
MARKED BY R.L.S. NO. 47481
∅
∅
∅
∅
∅
∅
∅
∅
∅
∅
∅
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Assistant City Engineer
McKenzie Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: July 26, 2019
Subject: Spirit of Brandtjen 22nd Addition
• Final Plat Review
• Final Grading Plan Review
• Utility Plan Review
• Erosion Control Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm (SBF)
22nd Addition. This is the fourth phase of the SBF 18th Addition Preliminary Plat approved by
the City Council on May 15, 2017. The proposed development is located south of Dryden
Road, west of Draft Horse Boulevard and east of Eagleview Drive. The parent parcels consist of
Outlot F, Spirit of Brandtjen Farm 17th Addition, Outlot G, Spirit of Brandtjen Farm 18th
Addition and Outlot D, Spirit of Brandtjen Farm 20th Addition. The development is zoned PUD,
Planned Unit Development.
The final plat consists of 29 single family lots and two (2) outlots within four (4) blocks.
The outlots created with the final plat shall have the following uses:
Outlot A: Common open space and private trail; to be retained by the Developer (0.135
acres)
Outlot B: Common open space and private trail; to be retained by the Developer (1.664
acres)
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 22
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site was previously a gravel processing operation. The gravel processing on the parent
parcels has been completed and the site encroachments have been removed.
The site was mass graded with the Spirit of Brandtjen Farm 18th Addition improvements.
EEAASSEEMMEENNTTSS
The following easements will expire upon final platting of the underlying outlots into lots and
blocks:
• Temporary Drainage and Utility Easement (Outlot F, SBF 17th Addition) per Doc. No.
768507
• Temporary Drainage and Utility Easement (Outlot A, SBF 3rd Addition) per Doc. No.
665443
• Temporary Drainage and Utility Easement (Outlot B, SBF 7th Addition) per Doc. No.
686643
• Temporary Drainage and Utility Easement (Outlot AA, SBF Addition and Outlot B,
Diamonte at Spirit of Brandtjen Farm) per Doc. No. 734064
• Temporary Drainage and Utility Easement (Outlot B, SBF 10th Addition) per Doc. No.
708301
• Temporary Drainage and Utility Easement (Outlot F, SBF 15th Addition) per Doc. No.
756077
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Duluth Trail
Development of Spirit of Brandtjen Farm 22nd Addition includes the construction and
extension of Duluth Trail, a local roadway. Duluth Trail is designed as a 28-foot wide urban
roadway with a 5-foot wide concrete sidewalk along both sides of the street. The Developer is
dedicating 52-feet of right-of-way. The street and landscaped boulevard design is consistent
with the Spirit of Brandtjen Farm Planned Unit Development Plan.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for SBF 22nd
Addition shall be from the north and south along the stub streets on Duluth Trail.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 33
PARKS, TRAILS AND SIDEWALKS
Development of SBF 22nd Addition includes the construction of public sidewalks. 5-foot wide
concrete sidewalks will be constructed along both sides of Duluth Trail.
The Park Dedication Fee has not been collected on the parent parcels and will be required to
be collected with the final plat, calculated as follows:
29 units x $2,250 = $65,250.00
Lots in SBF 22nd
Addition
Detached Unit Park
Dedication Rate
SBF 22nd Addition
Park Dedication Fee
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
SBF 22nd Addition is located within sub-district NC-20060 of the North Creek sanitary sewer
district as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed via
existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire
Wastewater Facility. The downstream facilities have sufficient capacity to serve the proposed
subdivision.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval, calculated as follows:
29 units x $327.00/unit = $9,483.00
Units in SBF 22nd Addition Sanitary Sewer
Availability Charge
Total Required with
the final plat
WWAATTEERRMMAAIINN::
Development of SBF 22nd Addition includes the construction of 8-inch watermain to provide
water service to the development. The 8-inch watermain will connect to and extend from an
existing 8-inch watermain along the local street network.
Final locations and sizes of all public sanitary sewer and watermain facilities will be reviewed
by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are no existing overhead utility lines and/or poles within the parent parcels.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 44
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
BBAACCKKGGRROOUUNNDD
Spirit of Brandtjen Farm (SBF) is a planned unit development of which development began in
2005. The proposed development encompasses nearly all of the north half of Section 1,
Township 114, Range 20 and a substantial portion of the south half of said section. The initial
stormwater modeling and drainage plan for SBF, located on the south half of Section 1, was
prepared by Westwood Professional Services. The original design consisted of a main basin,
Spirit, surrounded by six National Urban Runoff Program (NURP) basins.
The Spirit basin design did not include a gravity outlet other than infiltration. A system of
pumps was incorporated into the design to serve three functions: 1) Irrigation supply, 2)
Recirculation for water features, and 3) Drawdown, if needed. During 2008, a decision was
made to not construct the recirculation features. As a result, the proposed pumping station
was not constructed, however, the pump station draw intake line was. As development has
continued, Spirit basin appears to have adequately infiltrated all runoff from the development
without the presence of the pumping system.
A gravel processing area had been in operation on the north half of Section 1 in excess of
forty years. As part of gravel operations years ago, a series of basins was constructed as wash
basins for sand processing. The operational need for these basins ended approximately in
2013 and a reclamation plan was prepared for the gravel processing area. As part of the
reclamation plan, the largest basin was measured and quantified, and incorporated into the
reclamation plan with intended use as a stormwater management basin. The basin is referred
to as Nordeast Basin.
PPRROOPPOOSSEEDD SSTTOORRMMWWAATTEERR MMAANNAAGGEEMMEENNTT PPLLAANN
SBF 22nd Addition is located within the North Creek drainage district as identified in the City’s
Water Resources Management Plan. The plat is located within sub-districts NC-11A, NC-11B,
NC-11C and NC-13.
The proposed stormwater management plan is a regional plan that connects the 96 acres
within the Nordeast Basin drainage area. The proposed system utilizes the existing Nordeast
Basin for flood storage and infiltration, having peripheral National Urban Runoff Protection
(NURP) and stormwater collection systems. The pretreatment NURP basins are multi-celled.
The stormwater management system to serve SBF 22nd Addition was constructed with
development of SBF 18th Addition.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 55
SSTTOORRMM SSEEWWEERR
Development of SBF 22nd Addition includes the construction of a public storm sewer system.
Storm sewer will be installed to collect and convey stormwater runoff generated from the
streets and open space within the development. The storm sewer will convey the runoff to
the stormwater management basins within SBF. The constructed public storm sewer shall be
located within public right-of-way and/or public drainage and utility easements.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must
be paid at the time of final plat approval. The Trunk Storm Sewer Area Charge will not be
collected for the portions of SBF 22nd Addition that drain directly to Nordeast.
The Trunk Storm Sewer Area Charge for the portion of SBF 22nd Addition that does not drain
to Nordeast shall be paid with the final plat, calculated as follows:
322,441.00 s.f. x $0.178/s.f. = $57,394.50
Net Area of SBF 22nd Addition Trunk Storm Sewer
Area Charge
Total Required
with the final plat
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
The area of SBF 22nd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, the
development is not located within a Special Flood Hazard Area (SFHA), as determined by
FEMA.
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 66
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit of Brandtjen Farm 22nd Addition. Construction costs are
based upon estimates submitted by the Developer’s engineer on March 5, 2018.
CONSTRUCTION COSTS
Sanitary Sewer $ 136,892.22
Watermain 110,234.08
Storm Sewer 124,267.13
Street Construction 280,607.36
Erosion Control, Grading Certification and Restoration 35,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 687,000.79
OTHER COSTS
Developer’s Design (3.0%) $ 20,610.02
Developer’s Construction Survey (2.5%) 17,175.02
City’s Legal Expense (0.5%) 3,435.00
City Construction Observation (5.0%) 34,350.04
Developer’s Record Drawing (0.5%) 3,435.00
Landscaping 25,085.00
Street Lights 4,800.00
Lot Corners/Iron Monuments 3,100.00
SUBTOTAL - OTHER COSTS $111,990.08
TOTAL PROJECT SECURITY $ 798,990.87
The street light security totals $4,800 which consists of four (4) post-top street lights at $1,200
each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$3,100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 77
CASH FEES
An $1,025 cash fee for traffic control signs is due with Spirit of Brandtjen Farm 22nd Addition. If
the street signs are installed during frost conditions, the developer shall pay an additional
$150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
29 units x $9.12/unit/qtr. x 4 qtrs. = $1,057.92
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
29 units x $14.38/unit/qtr. x 4 qtrs. = $1,668.08
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
31 units x $90.00/unit = $2,790.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $20,610.02.
CASH REQUIREMENTS
Park Dedication Fee $ 65,250.00
Sanitary Sewer Availability Charge 9,483.00
Trunk Storm Sewer Area Charge 57,394.50
Traffic Control Signs 1,025.00
Streetlight Operating Fee 1,057.92
Environmental Resources Fee 1,668.08
City Base Map Updating Fee 2,790.00
City Engineering Administration (3.00%) 20,610.02
TOTAL - CASH REQUIREMENTS $159,278.52
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2222NNDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 2266,, 22001199
PPAAGGEE 88
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the SBF 22nd Addition final plat, grading plan, utility
plan, and erosion control plan subject to the requirements and stipulations of this report.