Loading...
HomeMy WebLinkAbout18336 Glasswort Dr SurveyPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEGLASSWORT DRIVE1ƒ (6ƒ (1ƒ :1ƒ ( 1ƒ ( 1ƒ ( 1ƒ ( 1ƒ ( 1ƒ (CENTERLINE35.0125.0025.0025.0025.0035.0035.0025.0025.0025.0025.0035.0125 25 20.003.75 1.003.00 1.009.25 5.0036.00 25.0052.00 20.003.751.003.00 1.009.25 5.0036.00 25.0020.003.75 1.003.00 1.009.25 5.0025.0052.00 20.003.751.003.00 1.009.25 5.0036.00 25.0020.003.75 1.003.00 1.009.25 5.0036.00 25.0052.00 20.003.751.003.00 1.009.25 5.0036.00 25.005.00 5.00 5.00 5.00 5.00 2.00 2.00 25.00 10.00 27.00 12.00 10.018.00 10.0010.00LOT 7 BLOCK 3LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 13LOT 1325.00 120.00 75.00 20.00 39.0 SERV SERV SERV SERV SERV DRIVEWAYSERVDRIVEWAYDRIVEWAY6.9%5.0%6.8%DRIVEWAY6.9%DRIVEWAY5.8%DRIVEWAY7.1%8.0 14.08.0 14.08.0 14.08.0 14.08.0 14.08.0 14.0DECKDECKDECKDECKDECKDECKDRAINAGE & UTILITY EASEMENT OVER ALL OF LOT 13THE BEARINGS SHOWN HEREON ARE BASED ON THE RECORDED PLAT OF AVONLEA 3RD ADDITION. 1112 HIGHWAY 55, SUITE 201, HASTINGS, MN 55033 (651)438-0000 PROPERTY DESCRIPTION Lot 7, 8, 9, 10, 11 and 12, Block 3, AVONLEA 3RD ADDITION, Dakota County, Minnesota. DENOTES FOUND IRON MONUMENT. SURVEYOR LICENSE NO. 48634. HAVING A PLASTIC CAP BEARING LAND DENOTES A PLACED 1" BY 18" IRON PIPE DENOTES SET OFFSET STAKE. DENOTES EXISTING SPOT ELEVATION. DENOTES PROPOSED SPOT ELEVATION. DENOTES PROPOSED DRAINAGE ARROW. CERTIFICATE OF SURVEY FOR LENNAR HOMES 18332-18352 GLASSWORT DRIVE, LAKEVILLE NOTES: x BENCHMARK IS TOP NUT HYDRANT AT THE NORTHEAST CORNER OF LOT 12, BLOCK 2, ELEVATION = 986.94. x INSTALL ROCK CONSTRUCTION ENTRANCE. x INSTALL SILT FENCE AS NEEDED FOR EROSION CONTROL x BUILDING DIMENSIONS SHOWN ARE TO OUTSIDE OF THE BASEMENT FOUNDATION PLAN. ALL DIMENSIONS AND LOCATIONS ARE TO BE VERIFIED IN THE FIELD WITH THE ARCHITECTURAL PLANS. x GRADING PLAN 7-16-18. AREAS: x LOT = 12241 SQ. FT. x BUILDING FOOTPRINT = 7452 SQ. FT. x DRIVEWAY = 4524 SQ. FT. 100 YEAR HWL=976.8 The curb box, drain tile cleanout and catch basin (if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 07/24/2019 mhughes Planning DepartmentApprovedDate:__________________08/09/2019 dmorey 18332 18336 18340 18344 18348 18352