HomeMy WebLinkAbout18336 Glasswort Dr SurveyPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEPROPOSEDHOUSEGARAGEGLASSWORT DRIVE1
(6
(1
:1
(
1
(
1
(
1
(
1
(
1
(CENTERLINE35.0125.0025.0025.0025.0035.0035.0025.0025.0025.0025.0035.0125
25
20.003.75
1.003.00 1.009.25 5.0036.00
25.0052.00
20.003.751.003.00 1.009.25
5.0036.00 25.0020.003.75
1.003.00 1.009.25 5.0025.0052.00
20.003.751.003.00 1.009.25
5.0036.00 25.0020.003.75
1.003.00 1.009.25 5.0036.00
25.0052.00
20.003.751.003.00 1.009.25
5.0036.00 25.005.00
5.00
5.00
5.00
5.00
2.00
2.00
25.00
10.00
27.00
12.00
10.018.00
10.0010.00LOT 7 BLOCK 3LOT 8
LOT 9
LOT 10
LOT 11
LOT 12
LOT 13
LOT 13LOT 1325.00 120.00
75.00 20.00
39.0
SERV
SERV
SERV
SERV
SERV
DRIVEWAYSERVDRIVEWAYDRIVEWAY6.9%5.0%6.8%DRIVEWAY6.9%DRIVEWAY5.8%DRIVEWAY7.1%8.0
14.08.0
14.08.0
14.08.0
14.08.0
14.08.0
14.0DECKDECKDECKDECKDECKDECKDRAINAGE & UTILITY EASEMENT OVER ALL OF LOT 13THE BEARINGS SHOWN HEREON ARE BASED
ON THE RECORDED PLAT OF AVONLEA 3RD
ADDITION.
1112 HIGHWAY 55, SUITE 201, HASTINGS, MN 55033
(651)438-0000
PROPERTY DESCRIPTION
Lot 7, 8, 9, 10, 11 and 12, Block 3, AVONLEA
3RD ADDITION, Dakota County, Minnesota.
DENOTES FOUND IRON MONUMENT.
SURVEYOR LICENSE NO. 48634.
HAVING A PLASTIC CAP BEARING LAND
DENOTES A PLACED 1" BY 18" IRON PIPE
DENOTES SET OFFSET STAKE.
DENOTES EXISTING SPOT ELEVATION.
DENOTES PROPOSED SPOT ELEVATION.
DENOTES PROPOSED DRAINAGE ARROW.
CERTIFICATE OF SURVEY
FOR
LENNAR HOMES
18332-18352 GLASSWORT DRIVE, LAKEVILLE
NOTES:
x BENCHMARK IS TOP NUT HYDRANT AT THE NORTHEAST CORNER
OF LOT 12, BLOCK 2, ELEVATION = 986.94.
x INSTALL ROCK CONSTRUCTION ENTRANCE.
x INSTALL SILT FENCE AS NEEDED FOR EROSION CONTROL
x BUILDING DIMENSIONS SHOWN ARE TO OUTSIDE OF THE
BASEMENT FOUNDATION PLAN. ALL DIMENSIONS AND LOCATIONS
ARE TO BE VERIFIED IN THE FIELD WITH THE ARCHITECTURAL
PLANS.
x GRADING PLAN 7-16-18.
AREAS:
x LOT = 12241 SQ. FT.
x BUILDING FOOTPRINT = 7452 SQ. FT.
x DRIVEWAY = 4524 SQ. FT.
100 YEAR
HWL=976.8
The curb box, drain tile cleanout and catch basin
(if applicable) must be inspected and accepted
before As-built escrow monies will be released.
All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date: 07/24/2019 mhughes
Planning DepartmentApprovedDate:__________________08/09/2019 dmorey
18332
18336
18340
18344
18348
18352