HomeMy WebLinkAbout19870 Harvest Dr SurveyZoning = RS-3The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easements*Draintile connection required.ENGINEERING REVIEWEDDate: 08/09/2019 mhughes