Loading...
HomeMy WebLinkAbout17335 Eagleview Dr SurveyENGINEERING REVIEWED Date:__________________09/03/2019 corlowsky *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. Approximate location of draintile cleanout EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.