Loading...
HomeMy WebLinkAboutSurvey - 17391 Eagleview DrThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required. ENGINEERING REVIEWED Date:__________________09/03/2019 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. Approximate location of draintile cleanout