HomeMy WebLinkAboutSurvey - 17391 Eagleview DrThe curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________09/03/2019 corlowsky
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
Approximate location
of draintile cleanout