Loading...
HomeMy WebLinkAbout19946 Hexham Way SurveyZoning = RS-3ENGINEERING REVIEWEDDate:__________________09/06/2019corlowsky*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.