Loading...
HomeMy WebLinkAboutItem 06.n• • ☒☐ 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Avonlea Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for Avonlea 4th. Dakota Electric Association estimates the cost to install the requested trail lighting system at $101,902.23 and is subject to change pending construction requirements. Below is included in the estimate: 14- 18’ Fiberglass posts with decorative LED fixtures 3- Above ground pedestals Wire, Boring, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Avonlea Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for Avonlea 4th. Dakota Electric Association estimates the cost to install the requested trail lighting system at $50,201.90 and is subject to change pending construction requirements. Below is included in the estimate: 14- 18’ Fiberglass posts with decorative LED fixtures 3- Above ground pedestals Wire, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Cherry Hill Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for the Cherry Hill development. Dakota Electric Association estimates the cost to install the requested trail lighting system at $43,663.92 and is subject to change pending construction requirements. Below is included in the estimate: 6- 18’ Fiberglass posts with decorative LED fixtures 1- Above ground pedestals Wire, Boring, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Cherry Hill Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for the Cherry Hill development. Dakota Electric Association estimates the cost to install the requested trail lighting system at $19,435.08 and is subject to change pending construction requirements. Below is included in the estimate: 6- 18’ Fiberglass posts with decorative LED fixtures 1- Above ground pedestals Wire, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Summerlyn Park Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for Summerlyn Park. Dakota Electric Association estimates the cost to install the requested trail lighting system at $40,055.41 and is subject to change pending construction requirements. Below is included in the estimate: 5- 18’ Fiberglass posts with decorative LED fixtures 1- Above ground pedestals Wire, Boring, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com 4300 220th Street West Farmington, MN 55024 651-463-6212 • 1-800-874-3409 Fax: 651-463-6256 www.dakotaelectric.com A Locally Owned, Nonprofit Electric Utility _________________________________________________________________________________________________________________________ An Equal Opportunity Employer of Minorities/Females/Veterans/Disabilities August 29, 2019 Mark Kruse City of Lakeville 7570 179th Street Lakeville, MN 55044 Re: Summerlyn Park Trail Lighting Mark, As you requested, Dakota Electric Association has put together the estimated costs to install trail lighting for Summerlyn Park. Dakota Electric Association estimates the cost to install the requested trail lighting system at $20,920.99 and is subject to change pending construction requirements. Below is included in the estimate: 5- 18’ Fiberglass posts with decorative LED fixtures 1- Above ground pedestals Wire, Trench, and Labor Please feel free to contact me with any questions or concerns. Sincerely, Matt Zeidler Project Manager Dakota Electric Association 4300 220th St. West Farmington MN 55024 (651)463-6373 mzeidler@dakotaelectric.com