Loading...
HomeMy WebLinkAbout19718 Henning Avenue-SURVEYZoning = RS-3 EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin (if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements *Draintile connection required. ENGINEERING REVIEWED Date: 09/09/2019 jpowers