HomeMy WebLinkAbout19718 Henning Avenue-SURVEYZoning = RS-3
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin
(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released.
All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
*Draintile connection required.
ENGINEERING REVIEWED
Date: 09/09/2019 jpowers