Loading...
HomeMy WebLinkAboutLA173913 - 5589 Upper 179th St W Permit PackCANNOT HOOK TO CITY SEWER/WATER RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 09/25/2019dmathews Secure door closed until deck is constructed with a separate permit. 4' WSP 4' WSP 4' WSP UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. Verify loads with girder truss specs, may require removal of top plates at bearing due to crushing. 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP PFHPFH 4' WSP 4' WSP 4' WSP 3.00' CS-WSP3.00' CS-WSP 4' WSP 4' WSP 4' WSP 4' WSP 4' WSP -Min. 15" clearance to anyobstruction from center of W.C., 24" in front(typ). Temper 4' WSP 8' LIB 4' WSP 8' LIB 4' WSP 8' LIB3' WSP 3' WSP 8' LIB 8' LIB BASEMENT BEAMS VERIFY BEAM SPAN B11 (3 -ply) H1 (2 -ply)H1 (2 -ply) H11 (3 -ply) PS PS PSPSPSPS PSPSPSPS PS PS PS PSPS PSPS PS PS PS PSPSPSPSPSPSPS PS PSPSPSPSPSPSPSPS PS BASEMENT BEAMS LVL/LSL Label Description Width Depth Qty Plies Pcs Leng… H1 LP-LSL 1.55E 1.75 9.5 2 2 4 6-0-0 B11 LP-LSL 1.55E 1.75 11.875 1 3 3 12-0-0 Lumber Label Description Width Depth Qty Plies Pcs Leng… H11 S-P-F #2 1.5 9.25 1 3 3 7-0-0 Legend PS Point Load Support Load from Above 2x6 PLATE Wall Opening LP-LSL 1.55E 1.75 X 9.5 (Dropped) LP-LSL 1.55E 1.75 X 11.875 S-P-F #2 1.5 X 9.25 (Dropped) BASEMENT BEAMS This drawing is a general interpretation of the construction drawings for this project and assumes the adequacy of the supporting structure. It is intended only as a general guide for the engineered wood products placement. All Dimensions, quantities and details must be carefully checked, verified by comparison to the actual field conditions and are the responsibility of the client, architect/engineer and builder. Engineered floor system does not account for roof loading unless noted otherwise. Important Notes Review Manufacturers' installation guide for additional structural details where necessary. Do Not cut or notch top or bottom floanges of joists to provide clearance for plumbing fixtures. Offset and/or install additional joists to provide clearance. All dimensional stock "Dropped headers" by others All Steel beams, angles and columns by others , Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them NOTE: USE WEBSTIFFENERS G.T. START JOIST RUN I-JOIST BLOCKING I-JOIST BLOCKING NOTE: ALIGN JOISTS TO ALLOW FOR PLUMBING AND MECHANICAL INSTALLATION UPPER FLOOR: 11-7/8" LP20-PLUS 19.2" O.C. 8 J2 @ 19.2"4 X J13 X J2 18 J3 @ 19.2"2 X J56 J4 @ 19.2" B12 (3 -ply) B4 (2 -ply) B5 (1 -ply) B10 (2 -ply)B8 (2 -ply) H8 (2 -ply) H6 (2 -ply) H2 (2 -ply) H1 (2 -ply) H10 (3 -ply) H5 (2 -ply)H4 (2 -ply) C1 C2 R1 R1 R1 R1 R1 R1 12 x H6 (U310) H1H6 10 x H3 (IUS2.56/11.88 (Min)) 8 x H6 (U310) 8 X H3 3 X H3 3 X H3 UPPER FLOOR I Joist Label Description Width Depth Qty Plies Pcs Length J5 LPI 20Plus 2.5 11.875 2 34-0-0 J4 LPI 20Plus 2.5 11.875 6 32-0-0 J3 LPI 20Plus 2.5 11.875 18 18-0-0 J2 LPI 20Plus 2.5 11.875 12 16-0-0 J1 LPI 20Plus 2.5 11.875 5 12-0-0 Blocking Label Description Width Depth Qty Plies Pcs Length BLK1 LPI 20 Plus 2.5 11.875 LinFt Varies 28-0-0 Rim Board Label Description Width Depth Qty Plies Pcs Length R1 LP APA Rated OSB 1.125 X 11.875 1.125 11.875 11 12 LVL/LSL Label Description Width Depth Qty Plies Pcs Length B4 LP-LSL 1.55E 1.75 7.25 1 2 2 22-0-0 H2 LP-LSL 1.55E 1.75 9.5 1 2 2 8-0-0 H1 LP-LSL 1.55E 1.75 9.5 1 2 2 6-0-0 H5 LP-LSL 1.55E 1.75 11.875 1 2 2 18-0-0 B7 LP-LSL 1.55E 1.75 11.875 1 16-0-0 B10 LP-LSL 1.55E 1.75 11.875 1 2 2 14-0-0 B9 LP-LSL 1.55E 1.75 11.875 1 2 2 12-0-0 H4 LP-LSL 1.55E 1.75 11.875 1 2 2 10-0-0 B8 LP-LSL 1.55E 1.75 11.875 1 2 2 6-0-0 B6 LP-LSL 1.55E 1.75 11.875 1 6-0-0 B5 LP-LSL 1.55E 1.75 11.875 1 2-0-0 B12 LP-LVL 2900Fb-2.0E 1.75 16 1 3 3 16-0-0 Hanger Beam/Girder Supported Member Label Pcs Description Skew Slope fasteners fasteners H1 1 HGUS412 56 16d 20 16d H2 1 IUS1.81/11.88 (Max) 10 10d 2 10dx1 1/2 H3 24 IUS2.56/11.88 (Min) 10 10d H6 21 U310 14 10d 6 10d x 1 1/2 Lumber Label Description Width Depth Qty Plies Pcs Length H10 S-P-F #2 1.5 9.25 1 3 3 10-0-0 H8 S-P-F #2 1.5 9.25 1 2 2 7-0-0 H6 S-P-F #2 1.5 9.25 3 2 6 4-0-0 Legend PS Point Load Support Load from Above 2x6 PLATE Wall Opening LP APA Rated OSB 1.125 X 11.875 LPI 20Plus 11.875 LP-LSL 1.55E 1.75 X 7.25 LP-LSL 1.55E 1.75 X 9.5 (Dropped) LP-LSL 1.55E 1.75 X 11.875 (Dropped) LP-LSL 1.55E 1.75 X 11.875 LP-LVL 2900Fb-2.0E 1.75 X 16 S-P-F #2 1.5 X 9.25 (Dropped) 4.5 X 11.875 UPPER FLOOR Design Method ASD Building CodeIBC/IRC 2015 Floor Loads Live 40 Dead 15 Deflection Joist LL Span L/480 TL Span L/240 This drawing is a general interpretation of the construction drawings for this project and assumes the adequacy of the supporting structure. It is intended only as a general guide for the engineered wood products placement. All Dimensions, quantities and details must be carefully checked, verified by comparison to the actual field conditions and are the responsibility of the client, architect/engineer and builder. Engineered floor system does not account for roof loading unless noted otherwise. Important Notes Review Manufacturers' installation guide for additional structural details where necessary. Do Not cut or notch top or bottom floanges of joists to provide clearance for plumbing fixtures. Offset and/or install additional joists to provide clearance. All dimensional stock "Dropped headers" by others All Steel beams, angles and columns by others , Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them UPPER FLOOR HEADERS G.T. H9 (2 -ply) H7 (2 -ply) H6 (2 -ply) H3 (2 -ply) 2ND FLOOR HEADERS LVL/LSL Label Description Width Depth Qty Plies Pcs Length H3 LP-LSL 1.55E 1.75 9.5 1 2 2 10-0-0 Lumber Label Description Width Depth Qty Plies Pcs Length H9 S-P-F #2 1.5 9.25 1 2 2 8-0-0 H7 S-P-F #2 1.5 9.25 2 2 4 6-0-0 H6 S-P-F #2 1.5 9.25 3 2 6 4-0-0 Legend PS Point Load Support Load from Above 2x6 PLATE Wall Opening LP-LSL 1.55E 1.75 X 9.5 (Dropped) S-P-F #2 1.5 X 9.25 (Dropped) 4.5 X 11.875 2ND FLOOR HEADERS Design Method ASD Building CodeIBC/IRC 2015 Floor Loads Live 40 Dead 15 Deflection Joist LL Span L/480 This drawing is a general interpretation of the construction drawings for this project and assumes the adequacy of the supporting structure. It is intended only as a general guide for the engineered wood products placement. All Dimensions, quantities and details must be carefully checked, verified by comparison to the actual field conditions and are the responsibility of the client, architect/engineer and builder. Engineered floor system does not account for roof loading unless noted otherwise. Important Notes Review Manufacturers' installation guide for additional structural details where necessary. Do Not cut or notch top or bottom floanges of joists to provide clearance for plumbing fixtures. Offset and/or install additional joists to provide clearance. All dimensional stock "Dropped headers" by others All Steel beams, angles and columns by others , Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them Date Certificate Post x Passive (No Fan ) Active (With fan and monometer or other system monitoring device ) Location (or future location) of Fan: Other Please Describe Here x R-15 x x R-20 x x R-20 x x 19+5 x x R-49 x R-49 x R-38 x R-38+5 x x X Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS:66,000 Capacity in Gallons:Other, describe: AFUE or HSPF%95% Cfm's " round duct OR " metal duct Not required per mech. code X Passive x Low: Other, describe: Low: Location of fan(s), describe: Cfm's 6 " Flex " metal duct New Construction Energy Code Compliance Certificate Heating System MECHANICAL SYSTEMS R-value R-8 Duct system air tightness: Heating or Cooling Ducts Outside Conditioned Spaces Cooling System Make-up Air Select a Type Perimeter of Slab on Grade R10 Rigid Exterior, R10 Int closed cell Rig i d , I s o c y n u r a t e Min e r a l F i b e r b o a r d Rig i d , E x t r u d e d P o l y s t y r e n e Total ventilation (intermittent + continuous) rate in cfms: Capacity continuous ventilation rate in cfms: City Mailing Address of the Dwelling or Dwelling Unit Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. 50 Location of duct or system: Rating or Size Efficiency Lennox Electric 13SEER /EER Output in Tons:2 13ACXN024 Location of duct or system: 192 Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Balanced Ventilation capacity in cfms: High: High: Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 57110 13966Residential Load Calculation Heating Loss 82 18,455 Building envelope air tightness: Describe other insulated areas Windows & Doors MECHANICAL VENTILATION SYSTEM Cooling LoadHeating Gain 5589 Upper 179th St. W. R-5 where required Lakeville Type: Check All That Apply Insulation Location Foundation Wall Model Appliances Lennox Manufacturer Fuel Type Natural Gas ML195UH070 0.30 Solar Heat Gain Coefficient (SHGC): Natural Gas Domestic Water Heater Ceiling, flat Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Average U-Factor (excludes skylights and one door ) U: 0.30 Fo a m , C l o s e d C e l l To t a l R - V a l u e o f a l l T y p e s o f In s u l a t i o n Below Entire Slab Rim Joist (2nd Floor+) Rim Joist (1st Floor) R10 Rigid Exterior, R10 Int closed cell R5 Exterior, R19 Batts Attic Name of Residential Contractor MN License Number RADON CONTROL SYSTEMTHERMAL ENVELOPE Fo a m O p e n C e l l No n o r N o t A p p l i c a b l e Fi b e r g l a s s , B l o w n BC604388Brandl Anderson Homes Wall Fi b e r g l a s s , B a t t s 000000Builders Associaton of Minnesota version 101014 40,000 X X 40,000 40,000 3000 3000 3000 40,000 40,000 13.33 13.33 1216 1216 .41 .41 .59 .59 7.9 3.2 NR 135 135 3688 553.2 553.2 170 85 Must provide transfer number once assigned 09/17/19 X KP 1 Mathews, David From:Matt Olson <molson@brandlanderson.com> Sent:Tuesday, August 6, 2019 10:56 AM To:Amanda Wheeler; Lori McDonough Subject:FW: Brandl/Anderson Transfers Knob Hill Attachments:20190805110549085.pdf; 20190805110514162.pdf; 20190805110429095.pdf; 20190805110536096.pdf; 20190805110405049.pdf; 20190802155726569.pdf Follow Up Flag:Follow up Flag Status:Flagged MPCA info for Knob Hill lots From: Amy Skillestad <amy@kjwalk.com> Sent: Monday, August 5, 2019 10:44 AM To: MN_MPCA_CSW <csw.pca@state.mn.us> Cc: Matt Olson <molson@brandlanderson.com> Subject: Brandl/Anderson Transfers Knob Hill