Loading...
HomeMy WebLinkAbout9156 187th St Survey187TH STREET WEST CLEANOUT CENTERLINE LOT 10 BLOCK 2 CLEANOUT CURB STOP 30.725.0PROPOSED DRIVEWAY PORCHGARAGE FF=1095.7 PROPOSED HOUSE (WALK-OUT) BASE FF=1087.35.1%7.0 7.0 42.8Hebert Homes 23300 Grandview Trail Lakeville, MN 55044 SITE ADDRESS: 9156 187TH STREET WEST LAKEVILLE, MN 55044 LOT AREA = 9,011 SQ. FT. GRADING PLAN USED TO PREPARE SURVEY - DATED 11/6/14 (HEDLUND ENGINEERING) Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements *Draintile connection required. ENGINEERING REVIEWED Date: 09/12/2019 jpowers