HomeMy WebLinkAbout9156 187th St Survey187TH STREET WEST
CLEANOUT
CENTERLINE
LOT 10
BLOCK 2
CLEANOUT
CURB STOP 30.725.0PROPOSED
DRIVEWAY
PORCHGARAGE
FF=1095.7
PROPOSED
HOUSE
(WALK-OUT)
BASE FF=1087.35.1%7.0
7.0
42.8Hebert Homes
23300 Grandview Trail
Lakeville, MN 55044
SITE ADDRESS:
9156 187TH STREET WEST
LAKEVILLE, MN 55044
LOT AREA = 9,011 SQ. FT.
GRADING PLAN USED TO
PREPARE SURVEY - DATED
11/6/14 (HEDLUND ENGINEERING)
Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'
RY Buffer - 50'
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between siding & sod
*No structures in easements
*Draintile connection required.
ENGINEERING REVIEWED
Date: 09/12/2019 jpowers