Loading...
HomeMy WebLinkAbout19950 Harvest Dr SurveyZoning = RS-3 *Maintain 6" between siding & sod *No structures in easements The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. ENGINEERING REVIEWED Date: 09/25/2019 ajordan