HomeMy WebLinkAbout19950 Harvest Dr SurveyZoning = RS-3
*Maintain 6" between siding & sod
*No structures in easements
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date: 09/25/2019 ajordan