SUMMERLYN 9th ADDITION FINAL PLAT AND EASEMENT VACATION
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) A resolution approving
the Summerlyn 9th Addition final plat, and 2) a resolution vacating a drainage and utility easement.
Overview
U. S. Home Corporation (DBA Lennar) has submitted final plat and easement vacation
applications and plans for 28 single family lots to be known as Summerlyn 9th Addition. The
property is located south of 190th Street and west of Holyoke Avenue. Summerlyn 9th Addition
represents the second and final phase of the Summerlyn North preliminary plat, which consists
of 62 single family lots. The Summerlyn 9th Addition final plat is consistent with the approved
Summerlyn North preliminary plat. A public hearing is required to vacate the drainage and
utility easement located on the parent parcel (Outlot A, Summerlyn 7th Addition), which will be
replaced by a drainage and utility easement on the Summerlyn 9th Addition final plat.
Summerlyn 9th Addition will be the final phase of the Summerlyn development which
commenced in 2013.
Primary Issues to Consider
None
Supporting Information
• Resolution approving the final plat
• Resolution approving the drainage and utility easement vacation
• Signed Development Contract and Warranty Deed
• Planning and engineering reports dated October 4, 2019 and October 2, 2019
Financial Impact: $_None_____ Budgeted: Y/N ____ Source: __________________________________________
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances__________________________________
Envision Lakeville Community Values: A Home for All Ages and Stages of Life______________________________
Report completed by: Frank Dempsey, AICP, Associate Planner
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 19- ______
RESOLUTION APPROVING THE FINAL PLAT OF SUMMERLYN 9th ADDITION
WHEREAS, the owner of the property described as SUMMERLYN 9th ADDITION has
requested final plat approval; and
WHEREAS, the final plat is consistent with the approved Summerlyn North preliminary plat;
and
WHEREAS, the final plat is acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
1. SUMMERLYN 9th ADDITION final plat is approved subject to the development
contract and security requirements.
2. The Mayor and City Clerk are hereby authorized to sign the development contract and
the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
2
DATED this 21st day of October 2019
CITY OF LAKEVILLE
Douglas P. Anderson, Mayor
ATTEST:
_______________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _________is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 21st day of October 2019 as shown by the minutes of
said meeting in my possession.
___________________________
Charlene Friedges
City Clerk
(SEAL)
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
1
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 19-___
RESOLUTION VACATING A PUBLIC DRAINAGE AND UTILITY EASEMENT
WHEREAS, the City Council held a public hearing, preceded by two (2) weeks published
notice, to consider the following described public drainage and utility easement vacation; and
WHEREAS, the City Council has determined that it is in the public interest to vacate said
public drainage and utility easement.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easement is hereby vacated, subject to the
recording of the Summerlyn 9th Addition final plat:
Ten foot wide drainage and utility easement in Outlot A, Summerlyn 7th Addition
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 21st day of October 2019
CITY OF LAKEVILLE
BY:________________________
Douglas P. Anderson, Mayor
2
ATTEST:
BY:________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. 19-______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 21st day of October 2019 as shown by the minutes of said
meeting in my possession.
__________________________
Charlene Friedges
City Clerk
(Seal)
1
City of Lakeville
Planning Department
Memorandum
To: Daryl Morey, Planning Director
From: Frank Dempsey, AICP
Associate Planner
Date: October 4, 2019
Subject: Summerlyn 9th Addition Final Plat and Easement Vacation
INTRODUCTION
U.S. Home Corporation (d/b/a Lennar Corporation) has submitted applications and plans for the
final plat of Summerlyn 9th Addition and vacation of a drainage and utility easement. The final
plat includes 28 single family lots and two outlots on 12.29 acres. Summerlyn 9th Addition is
comprised of parcel Outlot A, Summerlyn 7th Addition and is the final phase of the Summerlyn
North preliminary plat of 62 single family lots approved by the City Council on January 21, 2014.
The lot, block and street design of the Summerlyn 9th Addition final plat is consistent with the
approved Summerlyn North preliminary plat. Summerlyn 9th Addition also represents the final
phase of the 140 acre Summerlyn single family development located between 190th Street,
Holyoke Avenue, Dodd Boulevard and 194th Street. The Summerlyn development began in 2013.
The final plat plans have been reviewed by Engineering Division staff and Parks and Recreation
Department staff.
EXHIBITS
A. Aerial Photo Map
B. Approved Summerlyn North Preliminary Plat
C. Summerlyn 9th Addition Final Plat
D. Easement Vacation Sketch
2
PLANNING ANALYSIS
Zoning. The zoning of the property is RS-3, Single Family Residential District.
Existing Conditions. The Summerlyn 9th Addition final plat area is 12.29 acres. The property
was preliminary graded for streets and home building pads with the grading of the Summerlyn
North first development phase.
Lot Area. Single family lots within the RS-3 District are required to provide a minimum lot area
of 11,000 square feet for interior lots and 12,500 square feet for corner lots. The areas of the lots
within Summerlyn 9th Addition meet the minimum square footage required by the Zoning
Ordinance.
Lot Width. The minimum lot width for single-family lots within the RS-3 District is 85 feet for
interior lots and 100 feet for corner lots. All lots meet the minimum lot width requirement.
Lot Depth. Two double frontage lots abut major collector Holyoke Avenue and are required for
provide a buffer yard lot depth of 150 feet. Both lots meet the buffer yard lot depth requirement.
Setbacks. Setback requirements for single family lots in the RS-3 District are outlined below:
Yard Front Side Interior Side Corner Rear Buffer (Holyoke Ave)
Setback 30 feet 10 feet 20 feet 30 feet Rear 50 feet
The proposed building pads meet the minimum setback requirements.
Development Density. The Summerlyn 9th Addition final plat consists of 28 single family lots
with three blocks and two outlots totaling 12.29 acres. The gross density of Summerlyn 9th
Addition is 2.29 units per acre. The area excluding Outlots A and B (1.34 acres) results in a net
density of 2.57 units per acre.
Outlots. Two outlots are proposed with the Summerlyn 9th Addition final plat.
• Outlot A is 0.97 acres and will be deeded to the city for stormwater management purposes
• Outlot B is 0.37 acres and will be deeded to the city for stormwater management purposes
Streets and Right-of-Way. Summerlyn 9th Addition will include the construction of two streets,
Hillcrest Avenue and Huntington Avenue. The plat also abuts Holyoke Avenue.
3
Hillcrest Avenue is a 32-foot wide local street within a 60-foot wide right-of-way. A five-foot
wide concrete sidewalk will be constructed on west side of Hillcrest Avenue.
Huntington Avenue is a 32-foot wide local street within a 60-foot wide right-of-way. A five-foot
wide concrete sidewalk will be constructed on the north and east sides of Huntington Avenue.
Holyoke Avenue is a major collector. Right-of-way for Holyoke Avenue was dedicated with the
Summerlyn 5th Addition final plat in 2015.
Park Dedication and Trails. The Parks, Trail and Open Space Plan identifies a trail along the
west side of Holyoke Avenue. The trail will complete the final segment of the 1.2-mile long trail
along Holyoke Avenue between 202nd Street (CSAH 50) and 190th Street. No park land
dedication is required with the Summerlyn 9th Addition final plat, therefore, a cash fee for park
dedication will be required for the 28 single family home lots. The 2019 park dedication fee is
$4,294 totaling $120,232 payable at the time of final plat approval.
Landscaping. Two double frontage lots abut Holyoke Avenue. A security of $8,000 shall be
submitted with final plat approval to guarantee installation of the buffer yard landscaping.
Tree Preservation. There are no significant trees located within the Summerlyn 9th Addition
final plat.
Wetlands. There are not wetlands within the Summerlyn 9th Addition final plat.
Grading, Drainage and Erosion Control and Utilities. The final plat includes grading, drainage
and erosion control plans and utility plans. Grading, drainage and erosion control is discussed in
more detail in the October 2, 2019 engineering memorandum.
Easement Vacation. The Summerlyn 7th Addition final plat included a 10-foot wide drainage
and utility easement within along the east boundary of Outlot A (see Exhibit D). The easement
will be replaced by an identical easement in the Summerlyn 9th Addition final plat. All utility
companies with an interest in the easement have been notified of the proposed easement
vacation. No comments were received.
RECOMMENDATION
The Summerlyn 9th Addition final plat is consistent with the approved Summerlyn North
preliminary plat and complies with the requirements of the Zoning and Subdivision Ordinances.
Planning Department staff recommends approval subject to the following conditions:
4
1. Compliance with the recommendations listed in the October 2, 2019 engineering report.
2. Outlots A and B shall be deeded to the City with the final plat.
3. An $8,000 security shall be submitted to guarantee installation of the buffer yard landscaping.
cc: Joe Powers, Project Engineer
John Hennen, Parks and Recreation Director
Mac Cafferty, Environmental Resources Manager
Paul Tabone, Lennar
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Joe Powers, Project Engineer
Mac Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Alex Jordan, Assistant City Engineer
Gene Abbott, Building Official
Jerilyn Erickson, Finance Director
Date: October 2, 2019
Subject: Summerlyn 9th Addition
• Final Plat Review
• Utility Plan Review
BACKGROUND
U.S. Home Corporation has submitted a final plat named Summerlyn 9th Addition. This is the final
phase of the Summerlyn North Preliminary Plat approved by the City Council on January 21, 2014
as well as the Overall Summerlyn development. The subdivision is located west of and adjacent to
Holyoke Avenue, east of Huxley Avenue north of 193rd Street and south of 190th Street. The parent
parcel consists of Outlot A, Summerlyn 7th Addition, zoned RS-3, Single Family Residential District.
The final plat consists of twenty-eight (28) single-family lots within three (3) blocks and two (2)
outlots on 12.29 acres. The outlots created with the final plat shall have the following use:
Outlot A: Stormwater management; to be deeded to the City (0.97 acres).
Outlot B: Stormwater management; to be deeded to the City (0.37 acres).
The proposed development will be completed by:
Developer: U.S. Homes Corporation
Engineer/Surveyor: Pioneer Engineering
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 2 OF 8
SITE CONDITIONS
The Summerlyn 9th Addition site was previously mass graded as part of the Summerlyn North
preliminary plat. The land generally slopes from the north to the south with moderate to steep
slopes.
EASEMENTS
Outlot A, Summerlyn 7th Addition contains a drainage and utility easement along the east side of
the Outlot. The existing easement will be vacated and a new drainage and utility easement will be
dedicated over the eastern portions of Lots 10 and 11, Block 1 with the Summerlyn 9th Addition
final plat.
STREET AND SUBDIVISION LAYOUT
Holyoke Avenue
Summerlyn 9th Addition is west of and adjacent to Holyoke Avenue, a major collector roadway as
identified in the City’s Transportation Plan. Holyoke Avenue is constructed as a rural roadway with
turn lanes at the intersection with 190th Street. The Developer dedicated the necessary right-of-
way for Holyoke Avenue with the Summerlyn 5th Addition final plat.
Hillcrest Avenue
Development of Summerlyn 9th Addition includes the construction and extension of Hillcrest
Avenue, a local street. Hillcrest Avenue is designed as a 32-foot wide, two-lane urban street with
a 5-foot wide concrete sidewalk along the west side. The Developer is dedicating 60 feet of right-
of-way.
Huntington Avenue
Development of Summerlyn 9th Addition includes the construction and extension of Huntington
Avenue, a local street. Huntington Avenue is designed as a 32-foot wide, two-lane urban street
with a 5-foot wide concrete sidewalk along the north and east sides. The Developer is dedicating
60 feet of right-of-way.
CONSTRUCTION ACCESS
Construction access and egress for grading, public utility installation, and street construction shall
be off 193rd Street at Huntington Avenue.
PARKS AND TRAILS
The Park Dedication requirement has not been collected on the parent parcel and will be satisfied
through cash contributions that will be paid with the final plat. The Park Dedication Fee will be
based on the rate in effect at the time of final plat approval, calculated as follows:
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 3 OF 8
28 units x $4,294.00 = $120,232.00
Total Single-Family Dwelling Units
In Summerlyn 9th Addition
Park Dedication Fee
Total
Park Dedication Fee
The City’s Parks, Trails, and Open Space Plan identifies a bituminous trail along the west side of
Holyoke Avenue from 193rd Street to 190th Street. The Developer shall construct the trail with the
Summerlyn 9th Addition improvements. The City shall be responsible for 3/8ths of the cost of trail
construction and the Developer shall be responsible for 5/8ths of the cost of trail construction.
The City’s share of the cost for trail construction will be reimbursed to the Developer by the City
once the trail has been constructed and will be based on the actual cost to construct. The
estimated cost of the trail is $68,188.00, based on an estimate provided by the Developer’s
Engineer. The City will make reimbursement for the City’s 3/8ths share of the trail following
construction, within 30 days of receipt of written request for payment conditioned on the
following:
1. Trail, grading, and restoration have been inspected and accepted by the City.
2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from
the contractor.
The Developer previously provided cash escrows for its share of the future trail construction on
the west side of Holyoke Avenue adjacent to the Summerlyn 1st Addition and Summerlyn 7th
Addition plats. The cash escrows will be refunded to the Developer as a credit to the Park
Dedication fee as follows:
Escrow No. 8332 (Summerlyn 1st Addition) $1,808.88
Escrow No. 8504 (Summerlyn 7th Addition) 2,863.95
Total = $4,672.83
UTILITIES
SANITARY SEWER
Summerlyn 9th Addition is located within sub district ML-70160 of the Marion Lake
Sanitary Sewer District as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater
will be conveyed via existing public sanitary sewer to the MCES Lakeville/Farmington Interceptor
and continue to the Empire Wastewater Treatment Facility. The existing City-owned downstream
facilities have sufficient capacity to serve the residential development.
Development of Summerlyn 9th Addition includes public sanitary sewer construction. 8-inch sanitary
sewer main will be extended within the subdivision from existing sanitary sewer stubs to provide
service to the lots.
The Sanitary Sewer Trunk Area Charge was previously assessed to the parent parcels and has been
paid; therefore, the Sanitary Sewer Availability Charge is not required with this final plat.
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 4 OF 8
WATERMAIN
Development of Summerlyn 9th Addition includes public watermain construction. 8-inch
watermain will be extended within the subdivision from existing watermain stubs to provide
service to the lots.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City staff
with the final construction plans.
DRAINAGE AND GRADING
The plat of Summerlyn 9th Addition lies within Subdistricts SC-65 of the South Creek Drainage
District, as identified in the City’s Water Resources Management Plan.
Summerlyn 9th Addition does not include construction of public stormwater basins. Two stormwater
management basins were previously graded with the Summerlyn 5th Addition improvements and will
be dedicated as Outlot A and B with the final plat.
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlots A
and B to the City, consistent with City policy. The credit is based on the area of the outlots and is
calculated at the rate of $5,500.00 per acre, and will be applied to the Summerlyn 9th Addition final
plat cash fees. The credit is calculated as follows:
1.34 acres x $5,500/acre = $7,370.00
Total Area of Outlots A and B Per Acre Credit Total Credit
The final grading plan must identify all fill lots in which the building footings will be placed on fill
material. The grading specifications must indicate that all embankments meet FHA/HUD 79G
specifications. The Developer shall certify to the City that all lots with building footings placed on
fill material are appropriately constructed. Building permits will not be issued until a soils
observation and testing report has been submitted to the Building Official and an as-built certified
grading plan has been submitted and approved by City staff.
A National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
RESIDENTIAL BUFFER YARD REQUIREMENTS
A buffer yard berm and landscaping screen consistent with the subdivision ordinance shall be
provided adjacent to Holyoke Avenue. A certified as-built grading plan of the buffer yard berm
must be submitted and approved by City staff prior to the installation of any buffer yard plantings.
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 5 OF 8
STORM SEWER
Development of Summerlyn 9th Addition includes public storm sewer construction. Storm sewer
will be installed within the subdivision to collect and convey stormwater runoff generated from
within the public right-of-way and lots to the public stormwater basin located partially in Outlot
A, Summerlyn 9th Addition and partially in Outlot A, Summerlyn 1st Addition.
Draintile construction is required in areas of non-granular soils within Summerlyn 9th Addition for
the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile
required for building footings, which is deemed necessary during construction shall be the
Developer’s responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and will be paid
with the final plat at the current rate in effect at the time of final plat. The Trunk Storm Sewer Area
Charge is calculated as follows:
Gross Area of Summerlyn 9th Addition 535,143.00 s.f.
Less Area of Outlot A (-) 42,222.00 s.f.
Less Area of Outlot B (-) 16,314.00 s.f.
Total = 476,607.00 s.f.
476,607.00 s.f. x $0.178/s.f. = $84,836.05
Net Area of
Summerlyn 9th Addition
Area Charge Total
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
WETLANDS
There are no additional wetland impacts associated with the plat.
TREE PRESERVATION
There are no significant trees on the site.
EROSION CONTROL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment control BMPs be clearly outlined in a site’s SWPPP. Changes made throughout
construction should be documented in the SWPPP.
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 6 OF 8
Additional erosion control measures may be required during construction as deemed necessary
by City staff. Additional measures shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Summerlyn 9th Addition. Construction costs are based upon estimates
submitted by the Developer’s engineer on August 23, 2019.
CONSTRUCTION COSTS
Sanitary Sewer $114,937.75
Watermain 122,109.50
Storm Sewer 108,860.00
Street and Trail Construction 330,048.75
Erosion Control and Restoration 18,410.00
SUBTOTAL - CONSTRUCTION COSTS $694,366.00
OTHER COSTS
Developer’s Design (3.0%) $20,830.98
Developer’s Construction Survey (2.5%) 17,359.15
City’s Legal Expense (0.5%) 3,471.83
City Construction Observation (5.0%) 34,718.30
Developer’s Record Drawing (0.5%) 3,471.83
Landscaping 8,000.00
Street Lights 6,000.00
Lot Corners/Iron Monuments 3,000.00
SUBTOTAL - OTHER COSTS $96,852.09
TOTAL PROJECT SECURITY $791,218.09
The street light security totals $6,000.00 which consists of five post-top street lights at $1,200.00
each.
The Developer shall post a security to ensure the final placement of iron monuments at property
corners with the final plat. The security is $100.00 per lot/outlot for a total of $3,000.00. The City
shall hold this security until the Developer’s land surveyor certifies that all irons have been placed
following site grading, utility and street construction.
CASH FEES
A cash fee for traffic control signs is due with the final plat. Street signing consists of one stop and
street blade combination at $605.00 each, one stop sign at $412.50, and a mobilization fee of
$165.00 for a total of $1,182.50. If the street signs are installed during frost conditions, the
developer shall pay an additional $150.00 for each street sign location.
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 7 OF 8
A cash fee for one-year of streetlight operating expenses will be paid with the final plat and is
calculated as follows:
28 units x $9.12/unit/qtr. x 4 qtrs. = $1,021.44
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses will be paid with the final plat and is
calculated as follows:
28 units x $14.38/unit/qtr. x 4 qtrs. = $1,610.56
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City base
map will be paid with the final plat and is calculated as follows:
30 lots/outlots x $90.00/unit = $2,700.00
Lots/Outlots City Base Map Updating Fee Total
The Developer must submit the final plat and construction drawings in an electronic format. The
electronic format must be either a .dwg file (AutoCAD) or a .dxf file. The Developer must also pay
a cash fee for City Engineering Administration. The fee for City Engineering Administration will be
based on three percent (3.00%) of the estimated construction cost, or $18,785.34.
CASH REQUIREMENTS
Park Dedication Fee $120,232.00
Trunk Storm Sewer Area Charge 84,836.05
Traffic Control Signs 1,182.50
Streetlight Operating Fee 1,021.44
Environmental Resources Expenses 1,610.56
City Base Map Updating Fee 2,700.00
City Engineering Administration (3.00%) 20,830.98
SUBTOTAL CASH REQUIREMENTS $232,413.53
CREDITS TO THE CASH REQUIREMENTS
Outlots A and B (Deeded to the City) (Trunk Storm Sewer) $7,370.00
Holyoke Trail Construction (Summerlyn 1st Addition) (Escrow No. 8332) 1,808.88
Holyoke Trail Construction (Summerlyn 7th Addition) (Escrow No. 8504) 2,863.95
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS $12,042.83
TOTAL CASH REQUIREMENTS $220,370.70
POST PLAT CASH CREDITS
**Reimbursement of City Share for Trail Construction (Park
Dedication Fund)
$25,570.50
ESTIMATED POST PLAT CREDITS TO CASH REQUIREMENT = $25,570.50
SUMMERLYN 9TH ADDITION – FINAL PLAT
OCTOBER 2, 2019
PAGE 8 OF 8
**Based on estimate provided by the Developer’s engineer. The City will make reimbursement for
the trail following construction, within 30 days of receipt of written request for payment
conditioned on the following:
1. Trail, grading, and restoration have been inspected and accepted by the City.
2. Developer has submitted to the City the final pay estimate, invoice, and lien waiver from
the contractor.
RECOMMENDATION
Engineering recommends approval of the final plat, grading plan, and utility plan for Summerlyn
9th Addition, subject to the requirements within this report.