Loading...
HomeMy WebLinkAbout17413 Eastwood Ave SurveyZoning = RM-1HWL = 919.5EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate: 10/09/2019 lritchie