HomeMy WebLinkAbout18375 Golden Eye Path SurveyHOUSE ELEVATION DATA
HOUSE TYPE =SPLIT LEVEL
LOT TYPE = LOOKOUT
BASEMENT WALL HEIGHT = 3.5
PROPOSED GARAGE FLOOR EL.= 1003.5
PROPOSED TOP OF BLOCK EL.= 1004.2
PROPOSED LOWEST FLOOR EL.= 1001.0
GRADING QUANTITIES (CY)
COMMON FILL -279
COMMON CUT 91
FOOTINGS/TRENCHES 46
HARD SURFACES 25
TOTAL FILL -279
TOTAL CUT 162
TOTAL (+/-) -117
HOUSE ELEVATION DATA
HOUSE TYPE =SPLIT LEVEL
LOT TYPE = LOOKOUT
BASEMENT WALL HEIGHT = 3.5
PROPOSED GARAGE FLOOR EL.= 1003.5
PROPOSED TOP OF BLOCK EL.= 1004.2
PROPOSED LOWEST FLOOR EL.= 1001.0
GRADING QUANTITIES (CY)
COMMON FILL -279
COMMON CUT 91
FOOTINGS/TRENCHES 46
HARD SURFACES 25
TOTAL FILL -279
TOTAL CUT 162
TOTAL (+/-) -117
Planning DepartmentApprovedDate:__________________10/18/2019 dmorey
*Maintain 6" between siding & sod
*No structures in easements
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________10/24/2019 lritchie