HomeMy WebLinkAboutLA175193 - 20377 Greenwood Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Concept Approval ONLY
Subject to Field Inspection
Inspector Date
2015
MN Bldg
Code
11/04/2019dmathews
Secure door closed until deck is
constructed with a separate permit.
(3)
UFER Ground
-Provide 20' Rebar in footing and stub
up near electrical service panel.
(3
)
9
-
1
/
2
"
L
S
L
4' WSP
4' WSP3' WSP
PFH PFH
4' WSP
4' WSP
4' WSP
4' WSP
3.25'
CS-WSP
3.25'
CS-WSP
4'
CS-WSP
4'
CS-WSP
4'
CS-WSP
4'
CS-WSP
4' WSP4' WSP4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
-Min. 15" clearance to anyobstruction from center of
W.C., 24" in front(typ).
8' LIB
8' LIB
2.25' WSP 2.25' WSP
2.25' WSP 2.25' WSP
8' LIB
8' LIB
3' WSP8' LIB3' WSP
Verify loads with girder
truss specs, may require
removal of top plates at
bearing due to crushing.
BASEMENT BEAMS
F.T.
B7 (3 -ply)
B5 (2 -ply)
PSPSPSPS
PS
PS
PS PSPSPSPSPSPSPSPS
PS PSPSPSPSPS PSPSPSPSPS
PSPSPSPSPSPSPS
PS PSPSPSPS
PS
PSPS
PSPS
BASEMENT BEAMS
LVL/LSL
Label Description Width Depth Qty Plies Pcs Length
B7 LP-LSL 1.55E 1.75 9.5 1 3 3 12-0-0
Hanger
Beam/Girder Supported
Member
Label Pcs Description Skew Slope fasteners fasteners
H1 1 U210-2 14 16d 6 10d
Lumber
Label Description Width Depth Qty Plies Pcs Length
B5 S-P-F #2 1.5 9.25 1 2 2 6-0-0
B19 S-P-F #2 1.5 9.25 1 5-0-0
Legend
PS Point Load Support
Load from Above
2x6 PLATE
LP-LSL 1.55E 1.75 X 9.5
(Dropped)
S-P-F #2 1.5 X 9.25
5.5 X 11.875
BASEMENT
BEAMS
This drawing is a general
interpretation of the construction
drawings for this project and assumes
the adequacy of the supporting
structure. It is intended only as a
general guide for the engineered
wood products placement. All
Dimensions, quantities and details
must be carefully checked, verified by
comparison to the actual field
conditions and are the responsibility
of the client, architect/engineer and
builder. Engineered floor system does
not account for roof loading unless
noted otherwise.
Important Notes
Review Manufacturers' installation guide for additional structural
details where necessary.
Do Not cut or notch top or bottom floanges of joists to provide
clearance for plumbing fixtures. Offset and/or install additional
joists to provide clearance.
All dimensional stock "Dropped headers" by others
All Steel beams, angles and columns by others
,
Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them
11-7/8" LP-42PLUS 16" O.C. SHADED AREA
16" O.C.
DN
NOTE: ALIGN JOISTS TO ALLOW FOR PLUMBING AND MECHANICAL INSTALLATION
START JOIST RUN
UPPER FLOOR: 11-7/8" LP-20PLUS 19.2" O.C.
I-JOIST BLOCKING
I-JOIST BLOCKING
9 J1 @ 19.2"
7 J6 @ 16"
8 J4 @ 16"
16 J5 @ 16"
6 J2 @ 19.2"7 J1 @ 19.2"
4 X J2 2 X J4
B6 (2 -ply)
B14 (3 -ply)
B13 (3 -ply)
B15 (3 -ply)
B10 (2 -ply)
B9 (2 -ply)
B18 (3 -ply)H1 (2 -ply)
H3 (2 -ply)
H8 (2 -ply)
H7 (2 -ply)H6 (2 -ply)
H4 (2 -ply)
H11 (3 -ply)H12 (3 -ply)
PS
PS
PS PSR1R1
R1
R1
R1
H28 X H5H2
4 X H5
10 X H4
3 X H5H2
9 x H5 (IUS2.56/11.88 (Min))
6 X H5
7 X H4
UPPER FLOOR
I Joist
Label Description Width Depth Qty Plies Pcs Length
J4 LPI 20Plus 2.5 11.875 10 20-0-0
J2 LPI 20Plus 2.5 11.875 10 18-0-0
J1 LPI 20Plus 2.5 11.875 16 16-0-0
J6 LPI 42Plus 3.5 11.875 7 24-0-0
J5 LPI 42Plus 3.5 11.875 16 22-0-0
Blocking
Label Description Width Depth Qty Plies Pcs Length
BLK1 LPI 20 Plus 2.5 11.875 LinFt Varies 31-0-0
Rim Board
Label Description Width Depth Qty Plies Pcs Length
R1 LP APA Rated
OSB 1.125 X
11.875
1.125 11.875 9 12
LVL/LSL
Label Description Width Depth Qty Plies Pcs Length
B6 LP-LSL 1.55E 1.75 7.25 1 2 2 20-0-0
H1 LP-LSL 1.55E 1.75 9.5 1 2 2 10-0-0
H2 LP-LSL 1.55E 1.75 9.5 1 3 3 4-0-0
B12 LP-LSL 1.55E 1.75 11.875 1 2 2 24-0-0
B11 LP-LSL 1.55E 1.75 11.875 1 2 2 20-0-0
H3 LP-LSL 1.55E 1.75 11.875 1 2 2 22-0-0
B10 LP-LSL 1.55E 1.75 11.875 1 2 2 10-0-0
B9 LP-LSL 1.55E 1.75 11.875 1 2 2 8-0-0
B8 LP-LSL 1.55E 1.75 11.875 1 6-0-0
B15 LP-LSL 1.55E 1.75 14 1 3 3 14-0-0
B14 LP-LVL
2900Fb-2.0E
1.75 14 1 3 3 16-0-0
B13 LP-LVL
2900Fb-2.0E
1.75 14 1 3 3 12-0-0
B16 LP-LVL
2900Fb-2.0E
1.75 16 1 3 3 20-0-0
B17 LP-LVL
2900Fb-2.0E
1.75 18 1 3 3 20-0-0
B18 LP-LVL
2900Fb-2.0E
1.75 20 1 3 3 22-0-0
Hanger
Beam/Girder Supported
Member
Label Pcs Description Skew Slope fasteners fasteners
H2 4 HHGU5.50-
SDS
44 SDS 1/4x2
1/2
28 SDS 1/4x2
1/2
H3 1 HHUS410 30 16d 10 16d
H4 17 IUS3.56/11.88
(Min)
12 10d
H5 30 IUS2.56/11.88
(Min)
10 10d
Lumber
Label Description Width Depth Qty Plies Pcs Length
H11 S-P-F #2 1.5 9.25 1 3 3 10-0-0
H8 S-P-F #2 1.5 9.25 1 2 2 9-0-0
H7 S-P-F #2 1.5 9.25 1 2 2 7-0-0
H6 S-P-F #2 1.5 9.25 1 2 2 6-0-0
H4 S-P-F #2 1.5 9.25 3 2 6 4-0-0
H12 S-P-F #2 1.5 9.25 1 3 3 4-0-0
Legend
PS Point Load Support
Load from Above
2x6 PLATE
Wall Opening
LP APA Rated OSB 1.125 X
11.875
LPI 20Plus 11.875
LPI 42Plus 11.875
LP-LSL 1.55E 1.75 X 7.25
LP-LSL 1.55E 1.75 X 9.5
(Dropped)
LP-LSL 1.55E 1.75 X 11.875
(Dropped)
LP-LSL 1.55E 1.75 X 11.875
LP-LSL 1.55E 1.75 X 14
LP LVL 2900Fb 2.0E 1.75 X 14
UPPER FLOOR
Design
Method
ASD
Building CodeIBC/IRC 2015
Floor
Loads
Live 40
Dead 15
Deflection Joist
LL Span L/480
TL Span L/240
This drawing is a general
interpretation of the construction
drawings for this project and assumes
the adequacy of the supporting
structure. It is intended only as a
general guide for the engineered
wood products placement. All
Dimensions, quantities and details
must be carefully checked, verified by
comparison to the actual field
conditions and are the responsibility
of the client, architect/engineer and
builder. Engineered floor system does
not account for roof loading unless
noted otherwise.
Important Notes
Review Manufacturers' installation guide for additional
structural details where necessary.
Do Not cut or notch top or bottom floanges of joists to
provide clearance for plumbing fixtures. Offset and/or
install additional joists to provide clearance.
All dimensional stock "Dropped headers" by others
All Steel beams, angles and columns by others
,
Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them
SECOND FLOOR HEADERS
G.T.
G.T.G.T.
H1 (2 -ply)
H10 (2 -ply)
H7 (2 -ply)
H4 (2 -ply)H4 (2 -ply)H4 (2 -ply)
H9 (3 -ply)
2ND FLOOR HEADERS
LVL/LSL
Label Description Width Depth Qty Plies Pcs Length
H1 LP-LSL 1.55E 1.75 9.5 1 2 2 10-0-0
H10 LP-LSL 1.55E 1.75 9.5 1 2 2 8-0-0
Lumber
Label Description Width Depth Qty Plies Pcs Length
H7 S-P-F #2 1.5 9.25 1 2 2 7-0-0
H9 S-P-F #2 1.5 9.25 1 3 3 6-0-0
H5 S-P-F #2 1.5 9.25 1 2 2 5-0-0
H4 S-P-F #2 1.5 9.25 3 2 6 4-0-0
Legend
PS Point Load Support
Load from Above
2x6 PLATE
Wall Opening
LP-LSL 1.55E 1.75 X 9.5
(Dropped)
S-P-F #2 1.5 X 9.25 (Dropped)
5.5 X 11.875
2ND FLOOR
HEADERS
This drawing is a general
interpretation of the construction
drawings for this project and assumes
the adequacy of the supporting
structure. It is intended only as a
general guide for the engineered
wood products placement. All
Dimensions, quantities and details
must be carefully checked, verified by
comparison to the actual field
conditions and are the responsibility
of the client, architect/engineer and
builder. Engineered floor system does
not account for roof loading unless
noted otherwise.
Important Notes
Review Manufacturers' installation guide for additional structural
details where necessary.
Do Not cut or notch top or bottom floanges of joists to provide
clearance for plumbing fixtures. Offset and/or install additional
joists to provide clearance.
All dimensional stock "Dropped headers" by others
All Steel beams, angles and columns by others
,
Version 18.80.245 Powered by iStructThis layout is to be used as an installation guide only. It is meant to be used in conjunction with the architectural and structural drawings, not to replace them
Date Certificate Post
x Passive (No Fan )
Active (With fan and monometer
or other system monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
x
R-15 x
x
R-20 x x
R-20 x x
19+5 x x
R-49 x
R-49 x
R-38 x
R-38+5 x x
X Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:66,000 Capacity in
Gallons:Other, describe:
AFUE or
HSPF%93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
X Passive
x Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
6 " Flex
" metal duct
New Construction Energy Code Compliance Certificate
Heating System
MECHANICAL SYSTEMS
R-value R-8
Duct system air tightness:
Heating or Cooling Ducts Outside Conditioned Spaces
Cooling System
Make-up Air Select a Type
Perimeter of Slab on Grade
R10 Rigid Exterior, R10 Int closed cell
Rig
i
d
,
I
s
o
c
y
n
u
r
a
t
e
Min
e
r
a
l
F
i
b
e
r
b
o
a
r
d
Rig
i
d
,
E
x
t
r
u
d
e
d
P
o
l
y
s
t
y
r
e
n
e
Total ventilation (intermittent + continuous) rate in cfms:
Capacity continuous ventilation rate in cfms:
City Mailing Address of the Dwelling or Dwelling Unit
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
50
Location of duct or system:
Rating or Size
Efficiency
Lennox
Electric
13SEER
/EER
Output
in Tons:2
13ACXN024
Location of duct or system:
192
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Combustion Air Select a Type
Balanced Ventilation capacity in cfms:
High:
High:
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
47741 17335Residential Load Calculation
Heating Loss
82
21,833
Building envelope air tightness:
Describe other insulated areas
Windows & Doors
MECHANICAL VENTILATION SYSTEM
Cooling LoadHeating Gain
20377 Greenwood Ave.
R-5 where required
Lakeville
Type: Check All That Apply
Insulation Location
Foundation Wall
Model
Appliances
Lennox Manufacturer
Fuel Type Natural Gas
ML193UH070XE
0.30 Solar Heat Gain Coefficient (SHGC):
Natural Gas
Domestic Water
Heater
Ceiling, flat
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Average U-Factor (excludes skylights and one door ) U: 0.30
Fo
a
m
,
C
l
o
s
e
d
C
e
l
l
To
t
a
l
R
-
V
a
l
u
e
o
f
a
l
l
T
y
p
e
s
o
f
In
s
u
l
a
t
i
o
n
Below Entire Slab
Rim Joist (2nd Floor+)
Rim Joist (1st Floor)
R10 Rigid Exterior, R10 Int closed cell
R5 Exterior, R19 Batts
Attic
Name of Residential Contractor MN License Number
RADON CONTROL SYSTEMTHERMAL ENVELOPE
Fo
a
m
O
p
e
n
C
e
l
l
No
n
o
r
N
o
t
A
p
p
l
i
c
a
b
l
e
Fi
b
e
r
g
l
a
s
s
,
B
l
o
w
n
BC604388Brandl Anderson Homes
Wall
Fi
b
e
r
g
l
a
s
s
,
B
a
t
t
s
000000Builders Associaton of Minnesota version 101014
40,000
X
X
40,000
40,000
3000
3000
3000
40,000
40,000 13.33
13.33
2565
2565 .85
.85 .15
.15 1.99
1.59
NR
320
455
455
4348
652
652
180
90
_______________Must provide NPDES transfer number once assigned by MPCA
10/24/19 X
KP