HomeMy WebLinkAbout19162 Incline Way Surveyc Pioneer Engineering
Revisions:
1.) 10-04-19 Stake house
Certificate of Survey for:
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
Lennar Corporation
16305 36th Ave N Ste #600
Plymouth, MN 55446-4270
Phone: (952) 249-3000 / Fax: (952) 404-1909
Zoning = RM-1FY - 20' House, 25' Garage
SY - 7' Interior, 20' CornerRY - 30'SY Buffer - 50'RY Buffer - 50'
ENGINEERING REVIEWED
Date:__________________10/28/2019 corlowsky
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Draintile connection required.