Loading...
HomeMy WebLinkAbout19162 Incline Way Surveyc Pioneer Engineering Revisions: 1.) 10-04-19 Stake house Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 Zoning = RM-1FY - 20' House, 25' Garage SY - 7' Interior, 20' CornerRY - 30'SY Buffer - 50'RY Buffer - 50' ENGINEERING REVIEWED Date:__________________10/28/2019 corlowsky *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Draintile connection required.