Loading...
HomeMy WebLinkAbout8024 201st St SurveyZoning = RS-4 *Maintain 6" between siding & sod *No structures in easements The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION Show draintile connection *Draintile connection required. ENGINEERING REVIEWED Date: 09/24/2019 ajordan