HomeMy WebLinkAbout8055 200th St SurveyZoning = RS-3
ENGINEERING REVIEWED
Date:__________________10/29/2019 corlowsky
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.*No structures in easements.