Loading...
HomeMy WebLinkAbout8055 200th St SurveyZoning = RS-3 ENGINEERING REVIEWED Date:__________________10/29/2019 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod.*No structures in easements.