Loading...
HomeMy WebLinkAbout1018ORDINANCE NO. 1018 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE AMENDING THE LAKEVILLE CITY CODE THE CITY COUNCIL OF THE CITY OF LAKEVILLE ORDAINS: Section 1. Section 11-72-7 of the Zoning Ordinance (C-2 District — Conditional Uses) is hereby amended to add the following provisions and renumber subsequent sections accordingly: G. Connection of principal buildings across a property line for interior pedestrian or vehicle use, provided that: The exterior materials for the structure connecting the principal buildings shall be consistent with the materials used for the principal buildings and shall comply with Section 11-17-9.D of this title. 2. Setbacks: a. Except for the structure connecting the principal buildings, each principal building shall comply with the setback requirements within each lot. b. The structure connecting the principal buildings shall not encroach upon a required front yard or the required side yard of a corner lot. 3. The property owner(s) shall execute an agreement in a form approved by the City Attorney to be recorded with each lot for the structure connecting the principal buildings that includes, but is not limited to, provisions that address: a. Responsibilities for maintenance and repair to the structure connecting the principal buildings. b. Provision of utilities including temperature control, water, and/or electricity. (1) Water service to the structure connecting the principal buildings shall be extended from the City water meter of one (1) of the connected principal buildings. C. Removal of the structure connecting the principal buildings and termination of the agreement. 4. Grading and storm water management issues for the structure connecting the principal buildings shall be subject to review and approval by the City Engineer. 5. The structure connecting the principal buildings shall not encroach within or over any drainage and utility easement; the property owner(s) shall execute an agreement to be recorded with each lot addressing storm water management along the common property line, subject to approval of the City Engineer. 6. The structure connecting the principal buildings shall comply with the requirements of the building code. Section 2. Section 11-73-7 of the Zoning Ordinance (C-3 District — Conditional Uses) is hereby amended to add the following provisions and renumber subsequent sections accordingly: G. Connection of principal buildings across a property line for interior pedestrian or vehicle use, provided that: The exterior materials for the structure connecting the principal buildings shall be consistent with the materials used for the principal buildings and shall comply with Section 11-17-9.D of this title. 2. Setbacks: a. Except for the structure connecting the principal buildings, each principal building shall comply with the setback requirements within each lot. b. The structure connecting the principal buildings shall not encroach upon a required front yard or the required side yard of a corner lot. 3. The property owner(s) shall execute an agreement in a form approved by the City Attorney to be recorded with each lot for the structure connecting the principal buildings that includes, but is not limited to, provisions that address: a. Responsibilities for maintenance and repair to the structure connecting the principal buildings. b. Provision of utilities including temperature control, water, and/or electricity. (1) Water service to the structure connecting the principal buildings shall be extended from the City water meter of one (1) of the connected principal buildings. C. Removal of the structure connecting the principal buildings and termination of the agreement. 2 4. Grading and storm water management issues for the structure connecting the principal buildings shall be subject to review and approval by the City Engineer. 5. The structure connecting the principal buildings shall not encroach within or over any drainage and utility easement; the property owner(s) shall execute an agreement to be recorded with each lot addressing storm water management along the common property line, subject to approval of the City Engineer. 6. The structure connecting the principal buildings shall comply with the requirements of the building code. Section 3. Section 11-74-7 of the Zoning Ordinance (C -CBD District — Conditional Uses) is hereby amended to add the following provisions and renumber subsequent sections accordingly: G. Connection of principal buildings across a property line for interior pedestrian or vehicle use, provided that: The exterior materials for the structure connecting the principal buildings shall be consistent with the materials used for the principal buildings and shall comply with Section 11-17-9.D of this title. 2. Setbacks: a. Except for the structure connecting the principal buildings, each principal building shall comply with the setback requirements within each lot. b. The structure connecting the principal buildings shall not encroach upon a required front yard or the required side yard of a corner lot. 3. The property owner(s) shall execute an agreement in a form approved by the City Attorney to be recorded with each lot for the structure connecting the principal buildings that includes, but is not limited to, provisions that address: a. Responsibilities for maintenance and repair to the structure connecting the principal buildings. b. Provision of utilities including temperature control, water, and/or electricity. (1) Water service to the structure connecting the principal buildings shall be extended from the City water meter of one (1) of the connected principal buildings. C. Removal of the structure connecting the principal buildings and termination of the agreement. 3 4. Grading and storm water management issues for the structure connecting the principal buildings shall be subject to review and approval by the City Engineer. 5. The structure connecting the principal buildings shall not encroach within or over any drainage and utility easement; the property owner(s) shall execute an agreement to be recorded with each lot addressing storm water management along the common property line, subject to approval of the City Engineer. 6. The structure connecting the principal buildings shall comply with the requirements of the building code. Section 4. Section 11-75-7 of the Zoning Ordinance (O -P District — Conditional Uses) is hereby amended to add the following provisions and renumber subsequent sections accordingly: C. Connection of principal buildings across a property line for interior pedestrian or vehicle use, provided that: The exterior materials for the structure connecting the principal buildings shall be consistent with the materials used for the principal buildings and shall comply with Section 11-17-9.D of this title. 2. Setbacks: a. Except for the structure connecting the principal buildings, each principal building shall comply with the setback requirements within each lot. b. The structure connecting the principal buildings shall not encroach upon a required front yard or the required side yard of a corner lot. 3. The property owner(s) shall execute an agreement in a form approved by the City Attorney to be recorded with each lot for the structure connecting the principal buildings that includes, but is not limited to, provisions that address: a. Responsibilities for maintenance and repair to the structure connecting the principal buildings. b. Provision of utilities including temperature control, water, and/or electricity. (1) Water service to the structure connecting the principal buildings shall be extended from the City water meter of one (1) of the connected principal buildings. C. Removal of the structure connecting the principal buildings and termination of the agreement. 4 4. Grading and storm water management issues for the structure connecting the principal buildings shall be subject to review and approval by the City Engineer. 5. The structure connecting the principal buildings shall not encroach within or over any drainage and utility easement; the property owner(s) shall execute an agreement to be recorded with each lot addressing storm water management along the common property line, subject to approval of the City Engineer. 6. The structure connecting the principal buildings shall comply with the requirements of the building code. Section 5. This Ordinance shall be effective immediately upon its passage and publication according to law. ADOPTED by the Lakeville City Council this 18th day of November 2019 ATTEST BY: Charlene Friedges, City Clea CITY OF LAKEVILLE BY: Douglas . Anderson, Mayor 5 SUMMARY ORDINANCE NO. 1018 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE AMENDING TITLE 11 (ZONING ORDINANCE) OF THE LAKEVILLE CITY CODE This ordinance amends Title 11 of the Lakeville City Code. Amendments have been made to the following Chapters of the Lakeville City Code. Title 11 (Zoning Ordinance) Chapter 72-7 (C-2 District - Conditional Uses) Chapter 73-7 (C-3 District - Conditional Uses) Chapter 74-7 (C -CBD District - Conditional Uses) Chapter 75-7 (O -P District - Conditional Uses) A printed copy of the entire ordinance is available for inspection by any person during the City Clerk's regular office hours. Approved for publication by the City Council of the City of Lakeville, Minnesota this 2nd day of December 2019 CITY OF LAKEVILLE BY: Douglas P. Anderson, Mayor ATTEST: � � G Charlene Friedges, City Clerk'