Loading...
HomeMy WebLinkAbout18234 Justice Way SURVEYP l a n n i n g A p p r o v a l 1 1 / 1 5 / 1 9 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________11/15/2019corlowskyEROSION CONTR O L MUST BE INSTAL L E D BEFORE EXCAVAT I O N *Maintain 6" between bottom of siding and sod.*No structures in easements.