HomeMy WebLinkAbout18234 Justice Way SURVEYP
l
a
n
n
i
n
g
A
p
p
r
o
v
a
l
1
1
/
1
5
/
1
9
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________11/15/2019corlowskyEROSION CONTR
O
L
MUST BE INSTAL
L
E
D
BEFORE EXCAVAT
I
O
N
*Maintain 6" between bottom of siding and sod.*No structures in easements.