Loading...
HomeMy WebLinkAbout1021ORDINANCE NO. 1021 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING FEES THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS THE FOLLOWING FEES: I. LICENSES a. Dynamic Display Sign: i. Application fee $100.00 ii. Annual renewal fee $50.00 II. PERMITS a. Building Permits Total Valuation Fee $1.00 to $500.00 $30.00 $501.00 to $2,000.00 $30.00 for the $500.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $413.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $3,456.75 for the first $500,000.00 plus $5.00 for each $1,000,000.00 additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,956.75 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof b. Plan Check Fees i. 65% of building permit fee for permits with valuations greater than $10,000.00. ii. 25% of building permit fee for permits issued for similar buildings as required by State Building Code. c. Building Permits, Landscaping i. $1000.00 escrow for landscaping to be collected with the building permit. d. Building Permits, Erosion Control i. $1000.00 escrow for erosion control/grading certification to be collected with the building permit. e. Plumbing Permits i. Requirement: Master License Number or pipe layers certificate, $25,000.00 license bond and current Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate will satisfy this requirement. ii. Residential- Minimum (repairs and alterations, lawn sprinkler systems) $40.00 iii. Complete installation $90.00 iv. Commercial- 1.5% of contract/valuation price up to $10,000.00 and 1.0% of contract/valuation price above $10,000.00 v. Commercial- Minimum $40.00 vi. RPZ Valve (new, replacement or rebuild) $40.00 vii. Water Softener/Water Heater $40.00 f. Heating Permits i. Residential- Minimum repairs and alterations $40.00 ii. Residential- Complete installation $90.00 iii. Commercial- 1.5% of contract/valuation price up to $10,000.00 and 1.0% of contract/valuation price above $10,000.00. iv. Commercial minimum $40.00 g. Sewer and Water Permits i. Requirement: Master License Number, $25,000.00 License Bond and current Certificate of Liability Insurance to be filed with the City. Note: State Department of Health Bond and Insurance Certificate will satisfy this requirement. ii. Residential- Minimum repairs and alterations $40.00 iii. Residential- City water and sewer including conversion $90.00 iv. Commercial- One percent (1%) of contract/valuation price v. Commercial- minimum $40.00 vi. Private sewer systems: New installation $250.00 vii. Private sewer systems: Repair $250.00 h. Electrical Permits i. Requirement: State License from Board of Electricity. Note: An owner who actually occupies or intends to occupy a single family residence is exempt from the licensing requirement. H. Residential- Minimum repairs and alterations $40.00 iii. Residential- Additions, remodels, lower levels (two trips) $70.00 iv. Residential- New installation (up to three trips) $135.00 v. Commercial- 1.5% of contract/valuation price up to $10,000.00 and 1.0% of contract/valuation price above $10,000.00. vi. Commercial minimum $40.00 vii. Additional trip charge $35.00 L Well Permits i. Effective February 1, 1989, all well permits are issued by Dakota County. j. Manufactured Home Inspections L Installation permit (foundation, sewer, water, gas) $90.00 ii. Separate permit for electrical hookup $40.00 k. Swimming Pools i. All in -ground pools, regardless of capacity, and above -ground pools that exceed 5,000 gallons $50.00 1. Zoning Permit m. Signs i. Permanent installation ii. Temporary installation (10 days only) n. Moving Structure (plus letter of credit or cash escrow) o. Demolition i. Residential Accessory structures ii. All structures other than residential accessory $30.00 $75.00 $50.00 $125.00 no charge $50.00 p. Fire Systems i. Fire Line- One percent of contract/valuation price q. Sprinkler Fire Protection i. Requirement: State Fire Protection Contractor License to be filed with the City. ii. Commercial: 1.5% of contract/valuation price up to $10,000.00 and 1.0% of contract/valuation price above $10,000.00 plus surcharge (.0005 times contract/valuation) Minimum $45.00 iv. Residential- New Construction $90.00 v. Residential- Remodel $45.00 r. Miscellaneous Commercial Mechanical i. Refrigeration, piping, fuel tanks, etc.- 1.5% of contract/valuation price up to $10,000 and 1% of the contract/valuation price in excess of $10,000.00 ii. Minimum $40.00 s. Miscellaneous (re -inspections) Inspections i. Minimum 1 hour t. Re -Roof, Re -Side, Re -deck, and Retaining Walls over 4 feet high i. Residential ii. Commercial u. Windows- Comprehensive or Egress i. Residential ii. Commercial $55.00/hour $50.00 $150.00 $50.00 $150.00 v. Inspections after hours (weekends, Holidays) i. Only if an inspector is available for requested inspection (minimum 1 hour) $110.00/hour w. Investigation fee i. Whenever any work for which a permit is required by Code has been commenced without first obtaining said permit, the investigation fee shall be equal to the amount of permit fee. III. PLANNING AND ZONING a. Platting i. Also refer to Section IV ii. Services performed by City personnel will be billed at 2.5 times actual payroll hourly rate. Services provided by City consultant will be billed at current consultant rates. Sketch Plan Review- $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants iv. Preliminary Plat- $500.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for legal notices, planning, engineering and legal services provided by staff and/or consultant. v. Final Plat- $200.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for planning, engineering and legal services provided by staff and/or consultants. b. Planned Unit Development i. $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. c. PUD Amendment $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. d. Variance i. Single family (includes legal notice publications) $500.00 ii. All others, plus $1,000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants $500.00 e. Conditional Use Permit/CUP Amendment i. Single family (includes legal notice publications) $500.00 ii. All others, plus $1,000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants $500.00 f. Conditional Use Permit, Interim Use Permit and Variance Extension i. 111 extension $50.00 ii. Additional extensions $250.00 g. Home Occupation Permit $100.00 h. Interim Use Permit/IUP Amendment i. Single family (includes legal notice publications) $500.00 ii. All others, plus $1,000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants $500.00 i. Rezoning i. $500.00 plus $1000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants j. Administrative Subdivision i. $500.00 plus all applicable dedication requirements and $1,000.00 escrow for planning, engineering and legal services provided by staff and/or consultants k. Street and Easement Vacations i. $200.00 plus $1,000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants. 1. Zoning Ordinance Text Amendment i. $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants m. Lot Release i. $500.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants n. Parking Deferment i. $100.00 plus $1,000.00 escrow for planning, engineering and legal services provided by staff and/or consultants o. Comprehensive Plan Amendment i. $500.00 plus $2,000.00 escrow for legal notices, planning, engineering, and legal services provided by staff and/or consultants p. Site Plan i. $100.00 plus $1,000.00 escrow for planning, engineering, and legal services provided by staff and/or consultants q. Administrative Permit (per City Ordinance 11-8-3) $100.00 r. Cost Recovery Fee (for code enforcement activities) i. $100.00 per reinspection s. Zoning Letter t. Notice of Appeal $100.00 $500.00 escrow IV. ENGINEERING a. Platting Sketch plan review i. Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate applied to the Planning and Zoning escrows. ii. Preliminary Plat 1. $150.00/acre 2. $500.00 minimum 3. $3,200.00 maximum iii. Final Plat 1. $150.00/acre 2. $500.00 maximum b. Construction and Asbuilt Construction Plan Review Site, grading, erosion control, drainage, utility and street plan and specifications review. Services performed by City Personnel will be hourly. A cash escrow may be required (if not collected through Planning and Zoning). c. Wetland Conservation Act Administration (platting or non -platting action) i. Services performed by City Personnel will be hourly, in addition to the minimum fee, if a higher than average amount of time is spent on the services. In addition to the below fees, an escrow will be required to fund special studies such as environmental assessment worksheets, transportation, drainage, noise impacts, indirect source permits, etc. The amount of escrow will be based on the site, complexity, diversity and location of the project 1. Wetland Delineation a. $325.00 minimum fee plus any incremental hourly staff fee 2. Wetland Application a. $250.00 minimum fee plus any incremental hourly staff fee 3. Wetland Appeal of Notice of Decision a. $300.00 minimum fee plus any incremental hourly staff fee d. General Engineering i. Developer Installed improvements V. i. Engineering administration- 3.0% of project construction cost (assuming normal construction conditions and projection scheduling) or 3.25% if security is in the form of a cash disbursement agreement. 2. Construction, grading/erosion control, final acceptance and warranty inspection (hourly as charged by City's consultant). Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. Property Data and Asset/Infrastructure management fee (GIS fee) - preparation of record construction drawings and city base map updating. a. $90.00 parcel/lot ii. City installed improvements (non -development) 1. Engineering contract administration- 2.0% to 3.0% of project construction cost (depending on project). 2. Feasibility report- Services performed by consultants will be based on consultant's hourly rate. Services performed by City personnel will be hourly and billed at 2.5 times staff hourly rate. 3. Design- Services performed by consultants will be based on consultant's hourly rate. Services performed by City personnel will be hourly and billed at 2.5 times staff hourly rate. 4. Construction observation and final inspection- Services performed by consultants will be based on consultant's hourly rate. Services performed by City personnel will be hourly and billed at 2.5 times staff hourly rate. CONNECTION CHARGES AND OTHER DEVELOPMENT FEES a. Storm Sewer Charge (storm water management infrastructure) i. Single Family Residential $0.178/sq. ft. ii. Multi -Family Residential $0.198/sq. ft. iii. Commercial and Industrial $0.250/sq. ft. b. Crystal Lake Surcharge (Crystal Lake Watershed only, storm water management infrastructure) i. Single Family Residential $0.0134/sq. ft. ii. Multi -Family Residential $0.0153/sq. ft. iii. Commercial and Industrial $0.0195/sq. ft. c. Lateral Watermain Charge (adjacent non -assessed existing watermain) i. Residential -$41.00 per Front Foot plus $408.00 per service ii. Non -Residential -$48.00 per Front Foot plus $408.00 per service d. Lateral Sanitary Sewer Charge (adjacent non -assessed existing sanitary sewer) i. Residential and Non -Residential -$41.50 per Front Foot plus $418.00 per service e. Sanitary Sewer Availability Charge f. Sanitary Sewer Connection Charge g. Watermain Unit Charge i. Paid with building permit- funds water infrastructure ii. Residential- $4,100.00 per unit iii. High Density, Commercial, Industrial- $2,050.00 per unit h. Park Dedication Fees i. High Density Residential- $2,352.00 per dwelling unit ii. Medium Density Residential- $3,068.00 per dwelling unit iii. Low Density Residential- $4,509.00 per dwelling unit iv. Commercial- $7,693.00 per acre v. Industrial- $4,558.00 per acre Ordinance shall be effective January 1, 2020. Adopted by the Lakeville City Council this 2nd day of December 2019 By: Douglas P. Anderson, Mayor Charlene Friedges, City Cler $327.00 per unit $825.00 per unit SUMMARY OF ORDINANCE NO. 1021 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING A FEE SCHEDULE This ordinance prescribes fees sufficient to defray the costs incurred by the City of Lakeville in reviewing, investigating and administering applications from the amendment to an official control established pursuant to Minnesota Statutes Sections 462.351 to 462.364 and applications for permits or approvals required under an official control established pursuant to those sections. A printed copy of the ordinance is available for inspection by any person during regular office hours at the office of the City Clerk. APPROVED FOR PUBLICATION by the Lakeville City Council this 2nd day of December 2019 By: Douglas P. Anderson, Mayor