Loading...
HomeMy WebLinkAboutSurvey - 17317 Eastwood AveZoning = RM-1 proposed elev 929.8 proposed elev 929.0 proposed elev 927.8 EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements *Draintile connection required. ENGINEERING REVIEWED Date: 12/06/2019 rmcdonald