HomeMy WebLinkAbout17013 17019 Kerrick surveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date: 12/06/2019 rmcdonald
Planning DepartmentApprovedDate:__________________12/23/2019 kjenson