Loading...
HomeMy WebLinkAbout17013 17019 Kerrick surveyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date: 12/06/2019 rmcdonald Planning DepartmentApprovedDate:__________________12/23/2019 kjenson