HomeMy WebLinkAbout17414 Ely Ave Surveyc Pioneer Engineering
Revisions:
1.) 12-06-19 Stake house
Certificate of Survey for:
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
Brandl Anderson Homes Inc
221 River Ridge Circle South, Suite 100
Burnsville, MN 55337
Phone: (952) 898-0230
Zoning = RM-1FY - 20' House, 25' Garage
SY - 7' Interior, 20' CornerRY - 30'SY Buffer - 50'
RY Buffer - 50'*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________12/26/2019 corlowsky
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.