Loading...
HomeMy WebLinkAbout17390 Eastwood Ave SurveyZoning = RM-1The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.*Maintain 6" between siding & sod*No structures in easements*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________12/12/2019lritchie