Loading...
HomeMy WebLinkAboutItem 06.p Date: Item No. Contract with General Security Services Corp. for City Hall Security System Update Proposed Action Staff recommends adoption of the following motion: Move to approve contract with General Security Services Corporation to upgrade City Hall security system. Overview IT staff was requested to review the current City Hall security systems to address department access, security risks, and system management. During the review the following deficiencies in the current system were identified: • Managing access to non-public areas on several doors is difficult • Existing card readers are not encrypted and create a security risk • The main entrance doors lack features to better secure the building from the main front desk • The management of keyed doors is cumbersome and inefficient • The main alarm panel for City Hall is inadequate to address current needs IT staff worked with General Security Services Corporation to develop a plan to update and upgrade the current security system and recommends approval of the contract. Primary Issues to Consider Does a security system update/upgrade address the current security system deficiencies? • Yes. The addition and replacement of new encrypted HID card readers will provide management of access to non-public areas by allowing the doors to remain locked at all times. Access to these areas is only granted those individuals that require it. Supporting Information • GSSC City of Lakeville AMAG Proposal Financial Impact: $ Budgeted: Y☒ N☐ Source: Related Documents: (CIP, ERP, etc.): Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Ralph Vetter, IT Manager January 21, 2020 78,856.83 Building Fund Proposal #: 10607-1-0 Date: January 17, 2020 Ralph Vetter 20195 Holyoke Ave Lakeville, MN 55044 Phone:(952) 985-2642 Fax: Email: rvetter@lakevillemn.gov Robert Kilian 9110 Meadowview Road Minneapolis, MN 55425 PreparedFor :PreparedBy : City of Lakeville GSSC Phone: 952-858-5068 Cell: 612-702-7275 Email: robertk@gssc.net City Hall -2020 AMAG Access Control System Enhancements for City of Lakeville www.gssc.net City of Lakeville Proposal #:10607 -1-0 Date: January 17 ,2020 www.gssc.net Site: City of Lakeville 20195 Holyoke Ave Lakeville, MN 55044 AMAG Access Control System Enhancements: GSSC proposes to install a 27 door AMAG access control system. The access control system will include the following equipment and services. 1. Pricing at State of MN state contract pricing rates. Contract No. 86187 2. Install two AMAG 16 reader panels with network cards. 3. Install door electronic door locking hardware. 4. Programming. *Software Upgrade: Must have current SSA for price to be accurate. GSSC to upgrade the existing AMAG 7.0.01 version to 8.2. *Time and materials project estimated at 16 labor hours, billable at $65.00 per hour. GSSC will invoice for the labor hours and materials needed to complete the project Alternate 1: Integrate the security system with the AMAG access control system so that when a valid card is presented to any one of the three card readers proposed the system will arm / disarm with a valid card read. One new security system keypad will be located at the main entry. 1 open reader port will be required for each arm/disarm reader. Price valid if purchased at the same time as the base bid. *Alternate 2: Install a card reader on the main entry door. Card reader will unlock door locking hardware existing on the door. Install two wireless door release buttons. 1 open reader port will be required for door locking card reader. 1 open reader port will be required for wireless door release buttons. *Proposed Price does not include handicap opener interface. *Proposed Price valid if purchased at the same time as the base bid. *SEE GSSC DESIGN LAYOUT FOR ADDITIONAL DETAILS* __________________________________________________________________ Project Clarifications: Cabling Scope Of Work 9110 Meadowview Road, Minneapolis, MN 55425 | Phone: 952.858.5000 | Fax 952.858.5051 EOE/Equal Opportunity Employer Page 1 of 5 City of Lakeville Proposal #:10607 -1-0 Date: January 17 ,2020 www.gssc.net ·Each run will go to the nearest MDF/IDF Closet or Panel Location and will not exceed standard cabling lengths. ·Cabling will be installed to all relevant and applicable standards and best practices, including but not limited to ANSI/EIA/TIA 568B, 568C, 569B, 606 and the National Electrical Code (NEC). ·GSSC will provide and complete cable installation including wiring/cabling, testing, certification, cable hangers, jacks, boxes, faceplates, raceway, patch panels, connectors, and labels, as needed or specified in Scope of Work. ·All cable will be properly installed according to the NEC, supported with J-hooks, hangers, and/or cable ties as needed (no cable laying on the drop ceiling). ·All cabling will be clearly marked by GSSC on both ends. ·All building penetrations will be properly sealed for weather and fire caulk. GSSC Responsibilities: ·Provide equipment to customer as itemized in the attached Bill of Materials. ·Program, and optimize the System ·Testing and documentation of final system configuration Customer Responsibilities: ·Designate a key customer representative to act as project manager. This individual will coordinate the activities of internal customer departments and services required for successful completion of the project. ·Provide GSSC personnel prompt and unrestricted access to work areas for the duration of the project. ·Provide adequate and secure space for storage of equipment, cable, hardware, and tools during the installation. This space will be as close as possible to the work area. ·Provide conditioned 120 VAC power in IDF & MDF Locations Where Panels Are Located ·Provide, install and configure all customer owned network switches. ·Provide Open Network Port on Network ·IP Address and Network Configuration of camera proposed. Schedule: ·GSSC will determine daily labor requirements to complete the Scope of Work. ·The materials detailed comprise complete and operating systems based on information GSSC obtained from project drawings and specifications, to date. Any changes in the project scope, completion dates, system functions, cable routing, documentation, and/or training requirements, may require an increase in project cost. ·GSSC will provide an adequate quantity of personnel to complete our portion of this project efficiently, during normal working hours (7:30am - 4:30pm, M-F), and per a mutually agreed upon schedule (to be determined), excluding GSSC’s recognized holidays. Delays, cancellations, and/or errors of contributing parties can impact the project time line. Should GSSC be required to expend additional and/or overtime labor to offset another parties’ delay, GSSC will bill the customer for the additional labor. (Overtime at 1 ½ times standard 9110 Meadowview Road, Minneapolis, MN 55425 | Phone: 952.858.5000 | Fax 952.858.5051 EOE/Equal Opportunity Employer Page 2 of 5 City of Lakeville Proposal #:10607 -1-0 Date: January 17 ,2020 www.gssc.net rate). ·GSSC is not responsible for schedule revisions that are due to reasons beyond its control, including, but not limited to, the performance of other trades or the inability to obtain access to work areas. ·All schedule changes are subject to available personnel. Exclusions ·Door contacts, Rex motions and piezo alarms at all proposed access control door locations. ·Customer to supply all required door licenses for 30 doors (25 AC, 3 for Alt 1 and 2 for Alt 2). ·Electrical service to all equipment ·Conduit and pathway ·Millwork ·Lift/Boom Truck Rental, Scaffolding, etc. ·Permits ·Premium time ·Expedited freight ·Painting of equipment Warranty* ·Warrantyall equipment installed by GSSC under this Scope of Workto be free from defects for a period of one (1)year , and labor for a period of one (1)year. This warranty shall commence on the date of system substantial completion. All warranty service will take place during normal working hours. ·The repair or replacement of a defective component under the termsand condition of manufacturers’ warranty would not include the cost of labor required to repair or replace the defective component. ·In addition to any other limitations or disclaimers herein, the warranties provided in this Agreement do not cover damage, defects, malfunctions or failure caused by Customer or by third parties; by other events outside GSSC’s reasonable control such as power failure or surges, lightning, vandalism, fire, flood, and accident; if serial numbers or decals have been modified removed or altered. ·Any error or omission in construction or installation of the system must be called to the attention of GSSC in writing within thirty (30) days after completion of the installation. Upon expiration of the thirty (30) days, the installation shall be considered accepted as complete by the customer. ·The above warranty is contingent upon the proper use and maintenance of the equipment and/or any cabling system provided or installed by GSSC. *Additional warranty services and post-warranty repair and preventative maintenance agreements are available. Please contact your sales representative or email sales@gssc.net <mailto:sales@gssc.net >for options. 9110 Meadowview Road, Minneapolis, MN 55425 | Phone: 952.858.5000 | Fax 952.858.5051 EOE/Equal Opportunity Employer Page 3 of 5 City of Lakeville Proposal #:10607 -1-0 Date: January 17 ,2020 www.gssc.net Thank You On behalf of the GSSC team, thank you for the opportunity to submit this proposal . We look forward to earning your trust and being selected as your security system integrator of choice. If you have any additional questions or require further clarifications about our proposal ,please feel free to contact me directly at any time.Again, thank you, and I look forward to your acceptance. BEFORE ACCEPTING PROPOSED PROJECT, GSSC WILL SEND A DETAILED, FINAL PROPOSAL WITH DETAILED SCOPE OF WORK AND DRAWINGS FOR YOU TO SIGN AS A FINAL APPROVAL - PRICING WILL REMAIN THE SAME. 9110 Meadowview Road, Minneapolis, MN 55425 | Phone: 952.858.5000 | Fax 952.858.5051 EOE/Equal Opportunity Employer Page 4 of 5 City of Lakeville Proposal #:10607 -1-0 Date: January 17 ,2020 www.gssc.net Financial Summary $70,602.59AMAG Access Control QTY Description 2 IP PACK,SYMMETRY M2150,16,RDR, 8DBC+8DC,CAB 2 12v7AH BATTERY 4 Line Cord, 6', 3-Wire 8 12v7AH BATTERY 8 CBL,18-02,STR,NS,PLEN,WHT/BLU,500FT 8 CBL,22-06,STR,OAS,PLEN,WHT/YEL,500FT 4 PWR SPLY,24VDC,10A,8-PTC OUTPUTS W/RELAYS,UL 2 ENCLOSURE TAX 11INX11IN 2 REGULATOR,VOLTAGE,24VDC TO 5 OR 12VDC,6A MAX 4 DIST,PWR,1-8,FUSED,UL,BOARDONLY 27 RDR,R40,MULTICLASS,SE,HF SEOS,ELITE KEY $4,464.44Alternate 1 QTY Description 1 LCD KEYPAD CUST ALPHA PROG 1 8ZN EXPANDER 1 CBL,22-06,STR,OAS,PLEN,WHT/YEL 1 CBL,18-02,STR,NS,PLEN,WHT/BLU 1 CBL,18-04,STR,NS,PLEN,WHT/ORG 2 ACCS,SYMMETRY M2150,4-INPUT / 8-OUTPUT MODU 4 RDR,R40,MULTICLASS,SE,HF SEOS,ELITE KEY $2,749.80Alternate 2 QTY Description 1 CBL,18-02,STR,NS,PLEN,WHT/BLU,500FT 1 CBL,22-06,STR,OAS,PLEN,WHT/YEL,500FT 1 RCVR,WRLS,433MHZ,200FT,12VDC,120MA,WIEGAND26BIT 1 RELAY,TOGGLE/RATCHET,FLIP-FLOP,DPDT,12/24VDC 1 LED,RED/GRN,0.25 IN,12/24VDC,8MA/12MA,SGL-GANG 1 MOD,RELAY BOARD,DPDT,2AMP,6/12/24VDC,UL 2 XMTR,WRLS,2-BUTTON,WRR-22/WRR-44,200FT,BLK 1 RDR,RP10,MULTICLASS,SE,SEOS,ELITEKEY,BLUETOOTH 1 Accessory, Spacer Accessory Kit, Black, For iCLASS $1,040.00Software Upgrade $78,856.83 $23,657.04 $55,199.79 Financial Summary Total Proposal Amount: Deposit Due in Advance: Balance Due Upon Completion: Note: The above price does not include sales tax 9110 Meadowview Road, Minneapolis, MN 55425 | Phone: 952.858.5000 | Fax 952.858.5051 EOE/Equal Opportunity Employer Page 5 of 5